Loading...
HomeMy WebLinkAbouterosion pg 1Howard, Elmer M. - IQ i P.I.N. 9587 -91- 9456- -- ----- -- - - -- B8 - - -- A / (Wooded) f _ , � SEBIBlE1R EB� y a0 MFG v0 106 ,' / - ` IRLET TEMP. SWINIENT l 179 , f W8 _ P #B t BB s - 1810 --- - - - - =- t= �� PERM iNE1� ON S.R. 1115 ! • " euFr SIZE ♦' Al CEAI�A "� "� JP�IB#8 PARKTON COURT WEST ♦1 ' o .. ALO LAKE RD ,,� P • r 1 .181_.., ♦ 1 6 C / N rr4 1107 , i • • pp AA q� f / IANTATION DR. ^�9 ?� BI[ei@02/% I 176 • / / ,10 8 1 182! /' ,�' i I = BL00k L ORAIIEL \ iNLE4 BOTECTIONTTYPJ / Ig ' 160 161 S.R. 1120 1 C TEMP. 01118d' 9 I SW2 BS _ HIGHLAND 2003-163 FOREST = CL3 159 TRAP - PERM. NflLiBAiIYN - -- 174 a POND - - - -- / Sw1 /162 \ VICINITY MAP (N.Ts.) OYREr B4 _ I ! AL9 _ APRON CL5 158 I ' B3 CL4 CL5 163 173 / GJ / Depth Varies (12"-36n) - - -__ -- j• 157 �- 184 5 Bottom Width �AXN�' /% G d S I /' / 1 swab f1 1$4 _ -172 r / CONSTRUCTION SCHEDULE Section Four 1. Obtain all necessary permits and plan approvals. 2. Conduct preconstruction conference, if required. 3. Stake and flag for clearing, construction limits and temporary erosion and sediment control measures. 4. Clear and grub only as needed to install infiltration basins /traps, gravel construction entrances, perimeter silt fences and outlet ditch. 5. Construct sediment traps/infiltration basins, install gravel construction entrances and perimeter sediment fences. Al erosion and sediment control devices shall be inspected after every precipitation event, or once a week if no precipitation occurs, for the duration of the projecL 6. Obtain Certificate of Compliance from Erosion Control Inspector. 7. Permanently jute mat/grass/mulch all basin back slopes, fill slopes and outlet ditch. 8. Log site. Clear and grub within construction limits. 9. Strip and stockpile topsoil. 10. Begin rough grading streets, easements. 11. Continue and complete all rough grading. 12. Install storm drainage lines and outlet protection aprons. 13. Construct all drainage structures, protecting with appropriate measures as areas are brought to subgrade or finished grade. 14. Install water utilities, conduits 15. Installation of power, gas utilities shall be by others. 16. Place base and fine grade. Install modified inlet protection on all street inlets, either gutter buddy or as per detail EC.6 (See Erosion Control Details). 17. Pave streets. 18. Backfill curb and all landscaped areas with topsoil and fine grade. 19. Seed and mulch all disturbed area, or sod and landscape. 20. Cleanup and inspect site. 21. Upon stabilization of site, remove sediment deposits within the infiltration basins, regrade if needed any slopes, bottoms and seed and mulch all remaining bare areas Clean or replace arty riprap aprons if rteeded. Rip Rap Outlet Protection Outlet Structure Pipe Diameter (do) (n) Rational Flow (Clio) (CFS) Velocity Out (FPS) WDOT ZONE Average Stone Diameter (D50) (n) NCDOT Rip Rap Gass Apron Length (La) (it) Apron Width (Wal) (tt) Apron Width (Wa2) (tt) Stone Depth (n) B8 15 1.62 1.3 2 4 B 8 4 10 6 CL5 36 30.89 4.3 2 8 B 20 9 23 16 Trapezodlal rasse wa /156 e ----- - -_ -__ f _ \\ SEDIMENT TRAPS 185 CL2 CL 1 _ - \ Rational ROCKCNECK 4J� pipe Flow Surface Surface OAMTTYPJ \ Diameter (Clio) Disturbed Area Area Bottom Weir Weir Minimum Volume GRAVEL = I 165 Sediment Trap (do) (n) (CFS) Area Required Provided Elevation Elevation Length Volume Prodded x\� 155 '/ B2 171 \ B 15 1.62 0.7 705 s.f. 3,350 s.f. 403.0 405.5 6 2,520 c.f. 2,935 c.f. / 1 -4,35 \ A 36 30.89 4.5 13,437 s.f. 15,214 s.f. 403.0 406.5 20 16,200 c.f. 56,087 cA 18 V 1 / B1 - - - - - -- GRAVEL CON". 1 1 %' \ ENTRANCE 1 166 1 A ewmEmr 0 i `�� ENAG`E�I BEA..A.r _ 170 a /' NwFFtFS een77ERr STREETCBTAS >u OF SWACE AREA MILET ZONE CONSTRUCT 9PE 1FiGIION 1. GnhtM1e basinso tlut Neb¢mmslddfmntm WdcaM eidemvde 2 LWII taw lm„eau¢t NewidtNaf deaedim -n trep(Praol¢6b2 Sd-ed 3. Bad pm -aroWd bedrivmmadWtho Wpof afabnc maammmda(r h%p 124 \\ 53 P] / _ '' dines edupNead olM W®nuwdl.Ib mpo Uefabnc bwWb 6ldal.gb • •' ,� _ / tlwntlw inwut of tl,e epllMry.Top.dbafPCSlmWd be3i,dsfowc tlwtlempaftlu 122 1 123 y` \\ .� . .e j�j7 ' ;°"° flat a¢mw.ofbfl b.w�� d.dW�.d pab.N�. `•r 1 r\ • / I 1 I 1`' .�1 \ 1 , / 1 \ •' j/- y - _ 169 ------ - - - - -- FIRST CHAMBER 52 25x or suFea AREA .vim' uPe^i,6sin Pea PP^ ilP ^•,wirem SECOND CHA60M TEMPORARY GRA \ tlu w¢.e. wwm wb.kmam Maw nae.mrewim EXtSTM neuE asx � &�� �^ RN- AROUND �� ---'C 7, en.anua mamrs eap� y The batmen aM daaddwfabdemenw be a�im¢m lnab orpimaiwah OI \ I t - • / \ e- a Do not WL¢Oefabn4bmeaea000boowap� �e.wv I\'•.\ / ,� \\ bbwwTUxwN¢ OUTLET. Cu99 I rsz OF Swrra AREA 168 :I \\ y- atNsstm¢awxbaMaFnmaNraWili. Nabaanrrew +�� s• �T wo \\ Newremaamtam Beamamdw ba ffla. SloWd Ne Nbric ofaba(11e wIW /ya •1 orbemmeireRaVtw.repla¢Npmr0y, pa ¢.dmmy¢. 1 4i \ \'' +TI 11081' ' /i ORAYELCONSTe��. dWwN�i treadw�iwBfWmpmwdademBe�redw HEJlJ'MM T / • e•I mtramaMwwum new ontl ba m. TAemmwa d&a Vn, W dun% E • deimu� swmwtdWtb Y,auW .-..a n¢na gulf d- atop -a wnye SUPPORT ROPE SUPPORT POST ' 1 p E C T I 0 N. T H R V'E / ' ENIRANC -i - - - - - - - TO 1171E TO PIE- 24- INTO BOTTOM wN•NecanmbutinB draitu6ea,v Nahem pmpvly- ab0eed, remoae all Wflemamials NE 70 SUPPORT ! 1 •" + 117 aM�.,atlas mina. d.pati¢banBtka.�mBraee,aM,taN�N 1 ' ' ; 1 116.•' \ NdAP , #2006 -1'116 �> OR WE �\ 114 I I 115 r t +\ %-i< 11� NOM ' '+�' \ / I \ ! / - _ � P¢ �. ebaff�afwibel�t, uWe.; derit- meraa•ain�tt.aw.�aa�.rinm�.b®, 150 -I / o..eai,.� -,t batwm,.dn¢u,eadodry aM tmeulan¢dtNewatefuwmg thw,BNdie / 120 r `� maw¢ Mfadc, d dnBafMN�t- mw.bdo.aew� I i /, i I \ �I /i60 iNINDH'En°"iao BOT'OM ON a�E�.. . �Y - r-' BAFFLE DETAIL I \ I I I I I I `.: - 106 wrmBOaE 112 i :111 110! log �, 108 I f \`\ `\ •I / ---- - - - - -- 1 107 �\ • .I \\ EXISTING "BUA" 105 ��� ♦ . :I \\ 1 I i I I J 1 ' !, \ ♦\. -1 CATCH BASIN 1 I ___ - - -� ./ `�. - \ STORM DRAIN \ NOTES: BASIN INLET PROTECTION 'ii. 104' \ 1.) DO NOT DISTURB ANY EXISTING DITCHES. _ - 1 •, 1 / .' i � RIP-RAP APRON ,' I / - - - - - - 2.) INSTALL ALL EROSION CONTROL MEASURES 1 j {� - - - - - _ _ - - AS SHOWN ON PLAN AND MAINTAIN THRU I j I ``• I I I 91 I 92 /' I 93 1 94 ; I 95 PROJECT COMPLETION. CONSTUCTION LIMITS gg�o i 1 I `' Ix I 1��� III I // I !% J03 / 3.) INSTALL `GUTTER BUDDIES -AT EXISTING CATCH I 1 I I \ � - - - -- I' 1 1 1 1 ! 1 I / BASINS AT LOW POINTS of STREETS. SEDIMENT FENCE THE SUMMIT 1 I �- f I I °w I I J- - - { F - - - - t\ ' / EROSION PLAN IS FOR STREET CONSTRUCTION 1 -- 1� _ ^ I ! r' _ - _ \ /' 4) ONLY, A SEPARATE EROSION PLAN WILL BE DIRECTION OF RUNOFF 1 _ SECTION TWO 1 I �.II i REQUIRED FOR ANY LOT CONSTRUCTION. - - - - _ -1- MAP #2003-973 i 89 I � 1 $$ I 87 1 i 1 $6 / /' ; I 96 � / / / 5.) TOTAL DISTURBED AREA IS 5.2 ACRES. ROCK CHECK DAM 1 11 I / I 102 ' , --- STREET CUT DIVERSION -° - ° °- ~ ... ~- ................ ..,._„ _ 85 I 97 - \\ EROSION & SEDIMENTATION CONTROL PLAN 1 ��- �---�- I \ ,`tpuulurrr,rr I -- 101. ---, � `��H CAR -., SECTION FOUR - - - - -- --- - OWNER DEVELOPER: THE SUMMIT E DIVERSIFIED HOLD /NOS LLC 350 WAGONER DRIVE 98 \- .e9��! EE,.`�.�� FAYETTEVILLE, NC 28303 PROPERTY OF 1 I: \ 84 l - r qlr PHONE. (910)433 -0888 '' II 81 I; i I 82 i \ 83 \�� 'rrrrIlKl��``. ' �S DIVERSIFIED HOLDINGS LLC FAX: (910)485 -6700 iIle \ BARBECUE TWP. HARNETT CO., NORTH CAROLINA 440 ENGINEER /SURVEYOR: MOORMAN, KIZER & RE /TZEL, INC. SCALE: 1 "- 100' SEPT. 2012 - - - - - \\ PO BOX 53774 1 \ FAYETTEVILLE, NC 28305 1 / GRAPHIC SCALE IN FEET -Too -50 o Too 200 Goo & REMAIN, I11�i. PHONE. (910)484 -5191 FAX: (910)484 -0388 cur 4 n> 14