HomeMy WebLinkAboutpg121:111awmMAN I MA I' • `• �. 1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES INCLUDING TEMPORARY GRASSING SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED PER THE CHART ON SHEET C -13. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS. IF SITE INSPECTIONS IDENTIFY BMPS THAT ARE DAMAGED OR ARE NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICAL OR AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. 4. PROVIDE SILT FENCE AND /OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND /OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST, THE CONTRACTOR SHALL DAILY REMOVE MUD /SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. TEMPORARY DIVERSION BERMS AND /OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND /OR TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. S. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 9. INLET PROTECTION IS TO BE PROVIDED AT ALL EXISTING INLETS THAT RECEIVE FLOW FROM THE DISTURBED AREAS. 10. CONTRACTOR SHALL PROVIDE ONE STABILIZED CONSTRUCTION ENTRANCE AT ALL TIMES DURING CONSTRUCTION. LOCATION SHALL BE FIELD LOCATED AND COORDINATED WITH THE OWNER. CONSTRUCTION SEQUENCE MAINTENANCE REQUIREMENTS 1. RESEED AND MULCH SEEDED AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS 1. NOTIFY NCDENR, AND HARNETT COUNTY, PRIOR TO BEGINNING CONSTRUCTION AND SCHEDULE A SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. PRECONSTRUCTION MEETING ON SITE BEFORE WORK BEGINS, L49 ProJect: Anderson Crook :'. BEGIN MOWING AS SOON AS THE GRASS IS 50% HIGHER THAN THE DESIRED HEIGHT. FOR EXAMPLE, MOW 2. PROVIDE TREE PROTECTION FENCING PRIOR TO ANY CLEARING, GRADING OR CONSTRUCTION o.a6 ---j�, TALL FESCUE BACK TO 3" WHEN TURF REACHES 4J° HEIGHT. THE FREQUENCY OF MOWING IS GOVERNED BY ACTIVITY AROUND PROTECTED TREES OR GROVES OF TREES. NO CONSTRUCTION WORKERS, TOOLS, THE AMOUNT OF GROWTH. MOW WHEN LESS THAN 50% OF THE TOTAL LEAF SURFACE IS REMOVED. MATERIALS, OR VEHICLES ARE PERMITTED WITHIN THE TREE PROTECTION FENCING. CONTINUE MAINTENANCE THROUGHOUT THE FIRST GROWING SEASON OR UNTIL TURF IS ACCEPTED BY THE 3. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE. HARNETT COUNTY. 4. PROVIDE EROSION CONTROL MEASURES INCLUDING THOSE AT STAGING AREA(S). 3. RIPRAP SHOULD BE INSPECTED PERIODICALLY FOR SCOUR OR DISLODGED STONES. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS. 5. CLEAR AND REMOVE FROM SITE ALL TREES, ROOTS, ROOT MAT, ETC. FROM THE AREA WITHIN n. INSPECT PERMANENT DIVERSIONS AFTER EVERY RAINFALL DURING THE CONSTRUCTION OPERATION, DESIGNATED CLEARING LIMITS. IMMEDIATELY REMOVE ANY OBSTRUCTIONS FROM THE FLOW AREA, AND REPAIR THE DIVERSION RIDGE. CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. MAINTAIN THE VEGETATION IN A VIGOROUS, HEALTHY 6. PROVIDE SEDIMENT AND EROSION /TURBIDITY MEASURES AS SHOWN, AS CONSTRUCTION CONDITION AT ALL TIMES. PROGRESSES. AT THE END OF EACH DAY, EROSION CONTROL DEVICES MUST BE IN PLACE, AS DEPICTED ON THE PLANS, UP TO THE CURRENT END OF DISTURBED AREA. INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS AND MAKE REPAIRS DEHNR PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS OTHER POINTS WHERE 7. PERFORM MASS GRADING. Channel CONCENTRATED FLOW ENTERS. SCOUR HOLES OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. MAINTAIN Chan Bot Side Side Slope ALL VEGETATION ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA 8. INSTALL STORM DRAINAGE SYSTEM AS SHOWN ON PLANS AND PROTECT INLETS UNTIL SITE IS Hydraulic FROM EROSION AND SCOUR DURING OUT -OF -BANK FLOW. Channel STABILIZED. talc: 9. PLACE GRAVEL ENTRANCE DRIVE AND PARKING AREA AS ILLUSTRATED ON PLANS. CONSTRUCT PAD FOR RESTROOM BUILDING AND ERECT PICNIC SHELTER, PLACE CONCRETE WALKS AND GRANITE SCREENING TRAILS. 10. PERFORM FINE GRADING. 11. IMMEDIATELY UPON COMPLETION OF WORK, LEVEL OUT, SEED, AND MULCH ALL DISTURBED AREAS PER CHART ON SHEET C -13. SEED AREAS READY FOR PERMANENT STABILIZATION. 12. CONTINUE TO MAINTAIN PERMANENT AND TEMPORARY EROSION CONTROL MEASURES DURING GRADING AND AFTER GRADING HAS BEEN COMPLETED UNTIL FINAL INSPECTION AND APPROVAL BY NCDENR. 13. CLEAN AND RESTORE TO PRE - CONSTRUCTION CONDITIONS ANY AREAS OUTSIDE THE PROJECT LIMITS THAT MAY BE DAMAGED DUE TO THE FAILURE OF THE EROSION CONTROL MEASURES. 14. WATER, FERTILIZE, MOW AND MAINTAIN SEEDED AREAS UNTIL FINAL APPROVAL BY NCDENR. 15. REMOVE THE REMAINING TEMPORARY EROSION CONTROL MEASURES UPON APPROVAL BY NCDENR. Triangular Swale Performance L49 ProJect: Anderson Crook Mann ings Equation, �= (Ak- o.a6 ---j�, p.5 Designer: BR Y2 Date: 1 -22 -20113 DEHNR Channel Design Chan Bot Side Side Slope Design Chan Wetted Hydraulic Mann. Channel Q talc: Shear Tamp Perm. Location Flow cfs Width Sloe Len th be th Area Perim. Poe Radius n" Slue Allow De th Stress Liner Liner Tem Diversion Ditch A 9.9 0.00 3.5 4.3 0.71 2 9 0.2 0.030 0:057 7.3 0.7 P2,9 2.5 Nag SC 250 None Temp Diversion Ditch B 7:3 0.00 3:5 4.3 0.69 2 9 0.2 0.030 0.036 5.3 0.7 1.6 Nag SC 150 None Tel Diversion Ditch C 2.7 0,00 3.5 3.9 0.52 1 8 0.1 0.030 0.022 1`.7 0.5 0.7 Nag S75 None em pi+7ersion pitch p 2.2 0:00 3:b 3:8 0.45 1 8 0.1 0,030 0.032 1.3 0.5 0.9' Nag 575 Nona Tem iversion Ditch E 11.2 0:00 3:5 4.5 0.79 2 9 0:2 0:030 8.4 0.8' 5.2 1.9 Nag SC 150 one Temp Diversion Ditch 1.0 0.00 3.5 3.7 0.30 0 7 0.0 0;030 J.039 9 0.5 0:3, 3:3 1.1 Nag S75 None Tem piversion Ditch U 11.5 0.00 3.5 4.4 0.74 2 9 0.2 0:030 0 8.5 0:7 6.1 2.8 Nag SC250 None Tem Diversion Ditch H 11.8 0.00 3.5 4,5 0.80 2 9 0.2 0.030 O :043 9.1 0.8 5;4 21 Nag 0125 None TerrtporaryLiners ToV uz AUW2.v ,ss- Max. � Allow.DesignYfot Vegeta #iueChannels Shear SfYUSS, 7. =Jt5 A1towSLeaStress ldww tbw in ChannelSto a Soil GrassLining Pemxssib @V (e/s ) 0.i NAG 3C 350 ono d -S% SendelSlli BeraAUs 59 T = shear stress in lb/sq. ft. Tack dMulch 0,35 luteNet 0.45 NAG "1 195 Tall Fes 4..5 ' y = unit weight of water, 62.4 ib/cu. ft. Strawwl Net 115 NAG NAG sis 1:93 Si50 1.P3 KYB-legrase Grass- legurmnia 45 35 : d =low depth ''inft. SytheticMat 2.00 1.25 NAG nuo 2.00 MaxPertrassibbVdocitiesibrUnprotectedsoilsinEx Material .Chinnel Max- PennissibtiVdacityws) CIayA4xes Bermuda s = channel slope In 1I.A. C1assA Cana 2.00 NAC. NAG t:tas azs scow sou FineSand(nonco) ffl& 2.5 Tall Fescue KYBluegrass 53 53 55 claesl 3a0 xac csa a.ao San d Loaminon cot lid) am (no 25: 3.0 Grass ggusem x 4.5 Class 11 4:50 Lotlldl) Ordia 6rdinaryFi mLoam 3.5 5 -IOolo Sap is /Sill Be mtda Tall Fescue. 4.5 4:0 Firiepravei S.0 -5.0 KYBiuegrass 4.0 Notes: Graded,Siltt Cobb es; Gxaded,Silt toCobbles 5:0 Ciag Mixes Grass- legumetnix Benroada 310 53 Side slope honz lvert KYBiu grass s o Needsinput Graasaegnme rix ss ' pth and Velocity calculated using Try and Triangular Swalespreadshe� Permanent Erasion Control Mattin g ( PECM) may be used as a temperar ppizoidal and permanent liner For unvegetated channels, PECM has an allowable shear stress of 8 If /ft and an allowable flow rate of 20IV$ G 1 IUN UH U.Tt Uh 1 nt GUN I CN t A UP 41292013 dwg - January 29 2013 - Joel Moulin b. INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA, AND REPLACE THE PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. CHECK STRUCTURES FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAYS TO ENSURE THEY ARE MINIMUM OF 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT- PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURES AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS, AND STABILIZE PROPERLY. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLES COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. 7. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. 8. INSPECT SILT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SILT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 9. CONSTRUCTION ENTRANCE WILL BE PERIODICALLY TOP DRESSED WITH AN ADDITIONAL 2 INCHES OF NO. 4 STONE TO MAINTAIN PROPER DEPTH. ANY SEDIMENT THAT IS TRACKED INTO THE STREET WILL BE IMMEDIATELY REMOVED. W. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. a