Development Name: Village of Lexington
Part 6
Preliminary Plat
Property Description
PIN(s):
Acreage:
Acres
Address/SR No.: Centennial Parkway
# of Lots:
Developer:
Lexington Plantation
Plan/Plat
Review
Correct
Incorrect
N/A
TITLE BLOCK INFORMATION
Name of Project & Date (Including all Revision Dates)
Applicant/Owner(s) Contact Information (Name, Address,
& Phone)
Surveyor/Engineer Contact Information (Name, Address, & Phone)
Parcel ID Number/Tax ID of Tract(s)
Deed Reference of Tract(s)
Location
(Including Township, County, & State)
Flood Plain Depicted & Noted (Zone, Map Number, & Effective Date)
Watershed District Noted & Extent of Coverage Depicted
Impe
rvious Area Percentage Noted Including Proposed Improvements
GENERAL REQUIREMENTS
Map Size 18” X 24” & Scale 1”=200’ or Larger
North Point, Graphic Scale,
& Vicinity Map
Name(s) & Location(s) of Adjacent Property Owner(s) & Use(s)
Existing Boundaries of Tract(s) Showing Bearings & Distances
Gross Acreage
of Development
Name(s) & Right(s)-of-way of Streets & State Road Number(s), Including Notation of Public or Private
Name, Location, Width, & Acreage of Additional
Easement(s) & Right(s)-of-way Within or Adjacent to Site
Wetlands Delineated
All water features as found on USGS Quadrangles and the Harnett County Soil Survey
Req
uired riparian buffers/setbacks around each water feature
Easements, including drainage and utility, Open Space, & Areas Other Than for Residential Use with Explanation of
Purpose & Maintenance Responsibility
The 100-year flood plain boundaries and elevations from the most recent FIRM.
Disturbed Acreage
Master Plan
Predev
elopment Conference
PRELIMINARY PLAT ONLY
Total Number of Lots Proposed
Linear Feet per Street (Note Either Public or Private)
Topography
(Max Contour Levels of 5’)
Stormwater Management Statement
Conceptual Plan
CONSTRUCTION PLAN/DRAWING REVIEW
A copy of the erosion control plan submitted to the appropriate authority,
if such a plan is required.
A copy of the stormwater plan submitted to the appropriate authority, if such a plan is required.
Erosion Control Measures and Details
Detailed topographic information. A minimum 2 foot contours is required. Vertical datum provided.
Storm sewer profiles or design tables indicating the top of structure,
invert elevations, and pipe slope.
All proposed stormwater management facilities.
Construction details for improvements
Drainage easements
Utility
easements
FINAL PLAT ONLY
Total Number of Lots Proposed
Stormwater Certification
As-built Drawings
SITE PLAN ONLY
Topography (Max
Contour Levels of 5’)
Fire Hydrant(s) & Street Light(s) Noted
Erosion Control Plan Submitted
Impervious Surface (% Coverage of Lot)
Hazardous
Materials to be Stored on Site
Existing & Proposed Mechanical Areas
Existing & Proposed Trash Containment Areas
Existing & Proposed Utility Areas
Parki
ng Lot Material & Space Typical
All parking areas on site (Based on Type of Business and/or Sq. Ft.)
Existing & Proposed Fencing, Screening, Gate(s) and/or Dock(s)
Stormwater Management Statement
Conceptual Plan
CERTIFICATIONS
Harnett County Development Review Board
Harnett County Register of Deeds
Harne
tt County Review Officer
Ownership, Dedication, & Jurisdiction
Professional North Carolina Land Surveyor or Engineer
NCDOT (Driveway Permit Approval)
Ballot
REVIEWER:Amanda Bader Date: 1/8/13
VOTE: Hold
CONDITIONS:
SHORT TERM:
Copy of stormwater submittal to DWQ for Phase II post constructions.
A stormwater statement shall
be provided. We are particularly concerned about the wetland channels throughout the development. We would like to see an analysis that addresses whether or not there will be any adverse
impacts to adjacent properties for the 100 year event. This should include a channel analysis that identifies the change in normal depth.
The analysis needs to include the following:
Provide pre vs post runoff for the 10-year, 25-year and 100-year storm. Include maps to show the drainage basin areas.
The time of concentration
for the pre vs. post condition. The time of concentration should decrease with piped flow versus the original overland flow.
The channel analysis should be performed at a point in the
lower quarter of the drainage channel where flow is constrained because of a flat and narrow section.
LONG RANGE:
A copy of the erosion control plan submitted to the appropriate authority,
if such a plan is required.
Erosion Control Measures and Details
Detailed topographic information. A minimum 2 foot contours is required. Vertical datum provided.
Storm
sewer profiles or design tables indicating the top of structure, invert elevations, and pipe slope.
All proposed stormwater management facilities.
Construction details for improvements
Drain
age easements
Utility easements