Loading...
HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: CU football stadium expansion Property Description PIN(s): 0670-52-5225  Acreage: 66.40 acres  Address/SR No.:    Water Public water  available for this development (via ) Water capacity  available for this development Nearest water line location (Road name & SR#): Wade Stewart Nearest water line size: 12” Fire flow  available for this development Lines permitted under DENR Permit: (DEH Serial Number) Sewer Public sewer  available for this development (via ) Sewer capacity  available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size: 8” Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes  No  N/A Cost Statement for water improvements Yes  No  N/A Cost Statement for sewer improvements Yes  No  N/A Professional Engineer’s Certifications for water/sewer extension Yes  No  N/A Final Plat & As-Built Record Drawings are identical Yes  No  N/A DOT Encroachment Agreement Yes  No  N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes  No  N/A Master Plan submitted for additional phases if intended Yes  No  N/A Ballot REVIEWER: Shane Cummings Date: 2/15/13 VOTE:  CONDITIONS: SHORT TERM: -A hydraulic analysis/report must be submitted to HCDPU demonstrating the water demand and availably. While current pressure and flow in the area are above the minimum State requirements, recent fire flow reports indicate that minimum pressure and flow is not met due to the elevation of the structure and additional measure must be taken to insure that the requirements are met. The additional corrective measures must be included on the report. -HCDPU Utility Notes must be included on the site plan and construction drawings. -HCDPU water and sewer details must be included on the construction drawings. -A gate valve should be shown at the tie in point of the proposed water main. -A gate valve and blow off assembly must be shown at the end of the proposed water main. -The proposed meter vault should be adjacent to the concrete sidewalk and proposed parking lot. -Site plans and Construction plans must not that all existing utilities must be brought to grade and repaired if damaged during site construction. -The proposed sanitary sewer as it is shown would be considered private. -The proposed public utilities must have a recorded easements plat and easement agreement executed between HCDPU and Campbell University prior to system approval. -Utility Construction drawings must be submitted to HCDPU for review and approval prior to permitting with NCDENR. -Material submittals for the utilities must be approved by the EOR and HCDPU prior to construction. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process. The proposed easements for the sanitary sewer lines that will be installed outside the proposed street right-of-ways must be recorded with each final plat for the phases that they serve. These utility easements must be reviewed and approved by HCDPU Right-of-Way Agent and the Harnett County Legal Department prior to recording the final plats. The proposed water and sewer improvements for this project must be constructed in accordance Harnett County Standard Specifications and Details. Once the proposed water and sewer improvements for this project have been designed, permitted, constructed and inspected in accordance with the approval process, the developer and the utility contractor must jointly provide HCDPU a one (1) year warranty on all water and sewer improvements installed to serve these lots.