HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development
Name: Family Dollar
Property Description
PIN(s):
9586-88-2115.000
Acreage:
acres
Address/SR No.:
Buffalo Lake Rd
Water
Public water available for this development
(via )
Water capacity available for this development
Nearest water line location (Road name & SR#): Buffalo Lake Road
Nearest water line size: 8inch
Fire flow available for this
development
Lines permitted under DENR Permit: (DEH Serial Number)
Sewer
Public sewer available for this development (via )
Sewer capacity available for this development
Nearest
sewer line location (Road name & SR#): Buffalo Lake Road
Nearest sewer line size: 8inch
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built
Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s
Certifications for water/sewer extension Yes No N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance
to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Shane Cummings Date:
02/15/13
VOTE:
CONDITIONS:
SHORT TERM:
-Capacity Fees must be paid before HCDPU will activate services.
-The water and sewer usage calculations should follow NCDENR DWQ 2T Rules
NCDENR PWS 15A 18C Rules. These usages should be added to the site plan.
-Note should be added to the site plan for a licensed utility contractor to install the services for water and
sewer.
-“Notes Keyed to plan” A and C should be switched considering the plan callouts.
-“Utility notes” Note 4 should be revised to plastic meter boxes with cast iron lids. Note 5 should
be revised so that the sewer service installed in the right of way material in Schedule 40 PVC.
-Romac Stainless Steel tapping sleeve and valve must be added to the fire hydrant installation
labels.
-The existing sanitary sewer easements cannot be encroached on with parking lot.
-Water and sewer crossings must have minimum separations called out. 24inches is minimum separation
according to HCDPU Specifications.
-A NCDOT three party encroachment agreement must be obtained to install utilities within NCDOT right of way
-The back water valve on the sewer service
must be installed after the cleanout at the right of way line.
-HCDPU utility notes must be included on the site plan.
-NC-one Call must be added to the site plan cover sheet.
-The
sanitary sewer service cleanout must be installed at the easement line for the existing system.
-The service material on the public side should be SDR 35 PVC
-Water and sewer daily
usages must be included on the plan.
-HCDPU maintenance ends at the easement line and do not continue on the private property.
-Water and sewer capacity fees must be paid prior to services
being activated on the property.
-HCDPU approved backflow prevention devices must be labeled on the water service lines.
-Utility construction plans must be submitted to HCDPU for review
and approval.
-Submittals of material must be submitted to HCDPU prior to construction approval.
-HCDPU details must be included in the site plan.
-Capacity Fees must be paid before HCDPU will activate services.
-The water and sewer usage calculations should follow NCDENR DWQ 2T Rules NCDENR PWS 15A 18C Rules. These usages should
be added to the site plan.
-Note should be added to the site plan for a licensed utility contractor to install the services for water and sewer.
-“Notes Keyed to plan” A and C should
be switched considering the plan callouts.
-“Utility notes” Note 4 should be revised to plastic meter boxes with cast iron lids. Note 5 should be revised so that the sewer service installed
in the right of way material in Schedule 40 PVC.
-Romac Stainless Steel tapping sleeve and valve must be added to the fire hydrant installation labels.
-The existing sanitary sewer easements
cannot be encroached on with parking lot.
-Water and sewer crossings must have minimum separations called out. 24inches is minimum separation according to HCDPU Specifications.
-A NCDOT
three party encroachment agreement must be obtained to install utilities within NCDOT right of way
-The back water valve on the sewer service must be installed after the cleanout at
the right of way line.
-HCDPU utility notes must be included on the site plan.
-NC-one Call must be added to the site plan cover sheet.
-The sanitary sewer service cleanout must be
installed at the easement line for the existing system.
-The service material on the public side should be SDR 35 PVC
-Water and sewer daily usages must be included on the plan.
-HCDPU
maintenance ends at the easement line and do not continue on the private property.
-Water and sewer capacity fees must be paid prior to services being activated on the property.
-HCDPU
approved backflow prevention devices must be labeled on the water service lines.
-Utility construction plans must be submitted to HCDPU for review and approval.
-Submittals of material
must be submitted to HCDPU prior to construction approval.
-HCDPU details must be included in the site plan.
LONG RANGE:
Please visit www.harnett.org/utilities for more information
on the approval process.
The developer and the utility contractor must jointly provide HCDPU a one (1) year warranty on all water and sewer improvements installed to serve these lots.