Loading...
HomeMy WebLinkAboutAB comments1. The engineer is to send the updated stormwater permit submittal tomorrow morning. 2. The easement for drainage looks good on the plan. We need a revised plat showing the easement. Thanks Amanda From: Amanda Bader Sent: Tuesday, March 19, 2013 3:22 PM To: Jay Sikes Subject: RE: Advanced Auto Parts_revised site plan Jay – 1. They have provided the certification for the stormwater, but the certification states that when the new division of lot 4 into three lots is developed into site plans, they will update the permit. We need a copy of the updated permit for the lot 5 subdivision. It is also noted that Lot 5 was originally permitted for 36% impervious, but the design shows 53.5%. Please also note that the pond as stated in the certification letter is designed for the 100 year storm. 2. We still need the easement for the connection to existing storm drainage (and as-built data) on Lot 4 as well as an easement for the future connection from Lots 5B and 5C. Thanks Amanda From: Jay Sikes Sent: Wednesday, March 13, 2013 2:51 PM To: Tammy Ward; Shane Cummings; Amanda Bader Subject: Advanced Auto Parts_revised site plan Please find the revised site plan w/in its’ DRB folder. …..Developments, Site Plans, Major Subdivisions, ETC\Commercial Site Plans\Advanced Auto Parts_Hwy 87\site plan Also, AB, see attached SW info. Thank you, Jay Sikes Sr. Planner Harnett County Planning Services 108 E. Front St PO Box 65 Lillington, NC 27546 910-893-7525, x4 910-814-6418 910-814-6459 (fax) www.harnett.org/planning