HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development
Name: Anderson Creek Club Phase 5B-1 – Final Plat
Property Description
PIN(s):
0505-86-8897.000
Acreage:
10.16
acres
Address/SR No.:
Lemuel Black Road (SR 1125) & Nursery
Rd. (SR 1121)
Water
Public water available for this development (via )
Water capacity available for this development
Nearest water line location (Road name & SR#): Micahs
Way
Nearest water line size: 8”
Fire flow available for this development
Lines permitted under DENR Permit: 10-00995 (DEH Serial Number)
Sewer
Public sewer available for this
development (via )
Sewer capacity available for this development
Nearest sewer line location (Road name & SR#): Micahs Way
Nearest sewer line size: 8”
Lines permitted under DENR Permit:
WQ0035047 (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement
for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No N/A
Final Plat & As-Built Record Drawings are identical Yes
No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases
if intended Yes No N/A
Ballot
REVIEWER: Shane Cummings Date: 2/15/13
VOTE:
CONDITIONS:
SHORT TERM:
The PE must provide HCDPU with a set of As-Built Record Drawings (bond,
mylar and digital formats) for the water and sanitary sewer lines installed.
Final inspection must be completed by HCDPU.
Bacteria samples must pass for the water system.
The utility
easements must be approved and recorded prior to Final Plat approval.
The developer or PE must provide HCDPU with the cost statement for utilities installed including material type and
lengths.
PWS and DWQ Final Approval must be issued prior to Final Plat being recorded.
Valley Stream Road must have utility easements label with the road right of way/ the utility easements
for water and sewer must cover the service lines within the roadways.
HCDPU will need an updated master plan considering phases have increases lot counts from previous permits.
As built Lot numbers do not match the final plat lot numbers
The existing manholes
must be shown along the sewer lines.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The developer and the contractor must provide
HCDPU with a one (1) year warranty on the water lines installed to serve the lots in the Sweetwater subdivision. The one (1) year warranty cannot begin until the water system improvements
have been approved by HCDPU and NCDENR.