Loading...
HomeMy WebLinkAboutFinal Olde Farm Village Ph2 Sect 2 Decision PacketFINAL DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: OLDE FARM VILLAGE PHASE 2 SECTION 2 Development Type:  Date: JANUARY 30, 2013 The above referenced application  SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. : : Install temporary turn around at the end of Hallow Oak.  : : Street names should be shown in the street area. This should be Phase 2 Sec 2  : : Rename this as “Phase 2, Section 2” Add note stating… Public Plat Declaration All roads in this subdivision are hereby declared public.  The maintenance of all streets and roads in this subdivision shall be the responsibility of ___________________________________ and it shall be their responsibility to bring such streets up to the standards of the North Carolina Department of Transportation before any streets on this plat are added into the North Carolina State Highway System.  If the District Engineer has not recommended that the N.C. Department of Transportation accept maintenance responsibility for the required public road improvements by the time that the County has issued building permits for seventy-five percent (75%) of the lots shown on the record plat, the County shall not issue any more building permits until the District Engineer makes such a recommendation and formally notifies the Subdivision Administrator.  Add note that states “This development is within the five mile Military Corridor Overlay Zone, and may be subject to military training activities.” Change “Preliminary” to “Final” w/in the DRB cert Install street lights within all of Phase 2. $100 Final review is due  : : -The PE must submit to HCDPU utility inspection reports. -The developer and the utility contractor must jointly provide HCDPU a one (1) year warranty on all water and sewer improvements installed to serve these lots  : :   Engineering (910)893-7555 : Verify the adequacy of the 20 foot easement for the open channel between lots 59 and 60 and terminating between lots 23 and 24. Check flows for the 100-year storm to ensure no possible structure flooding.   Engineering (910)893-7555 : Verify the adequacy of the 20 foot easement for the open channel between lots 59 and 60 and terminating between lots 23 and 24. Check flows for the 100-year storm to ensure no possible structure flooding.   LONG RANGE CONDITIONS The following conditions must be satisfied Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.  : Please visit www.harnett.org/utilities for more information on the approval process.  :   :   :   :     Development Review Board Chairman   A FINAL copy, consisting of any corrections, etc., will be sent after the meeting. Upon resubmittal, additional comments/ corrections may be required. **Please remember all applicable fee’s** If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for compliance. If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options.