HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development
Name: Lakeside Manor PH 2 Block T Ph x Pt a
Property Description
PIN(s):
9585-75-2679.000
Acreage:
4.21
Acres
Address/SR No.:
Sea Mist Drive
Water
Public water available
for this development (via )
Water capacity available for this development
Nearest water line location (Road name & SR#): Sea Mist Drive
Fire flow available for this development
Lines
permitted under DENR Permit: 08-00773 (DEH Serial Number)
Sewer
Public sewer available for this development (via )
Sewer capacity available for this development
Nearest sewer
line location (Road name & SR#): Castle Bay and Sea mist Drive
Nearest sewer line size: 8"
Lines permitted under DENR Permit: WQ0029771 (DWQ Serial Number)
Additional Requirements
As-Built
Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s
Certifications for water/sewer extension Yes No N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance
to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Shane Cummings Date:
January 7, 2012
VOTE: Hold
CONDITIONS:
SHORT TERM:
There should be a 20ft easement shown between lots 123 and 124 for the proposed sewer line for Phase X.
The Contractor and Engineer
of Record must have a preconstruction meeting with HCDPU prior to construction.
A list of approved material submittals must be submitted to HCDPU with the Engineers approval and/or comments
prior to construction.
The water and sewer utilities must be installed, tested and approved by HCDPU and the Engineer of Record.
Final Inspection must be conducted by the Engineer of
Record and HCDPU.
The Engineer of Record must submit to HCDPU Engineer Certification of the utilities installed and include field reports.
The Engineer of record must submit to HCDPU record drawings of the water and sewer utilities for Carolina Lakes Block T. These record drawings must be in the form of 3 hard copies, 1
set of mylars an Auto-Cad formatted disk and pdf drawing.
The Engineer of record must submit to HCDPU a cost statement for the water and sewer utilities.
The Water and Sewer utilities
need final approval from NCDENR.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The developer must submit a one year warranty for
the installation of the utilities to HCDPU.