Loading...
HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Lakeside Manor PH 2 Block T Ph x Pt a Property Description PIN(s): 9585-75-2679.000  Acreage: 4.21 Acres  Address/SR No.: Sea Mist Drive   Water Public water  available for this development (via ) Water capacity  available for this development Nearest water line location (Road name & SR#): Sea Mist Drive Fire flow  available for this development Lines permitted under DENR Permit: 08-00773 (DEH Serial Number) Sewer Public sewer  available for this development (via ) Sewer capacity  available for this development Nearest sewer line location (Road name & SR#): Castle Bay and Sea mist Drive Nearest sewer line size: 8" Lines permitted under DENR Permit: WQ0029771 (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes  No  N/A Cost Statement for water improvements Yes  No  N/A Cost Statement for sewer improvements Yes  No  N/A Professional Engineer’s Certifications for water/sewer extension Yes  No  N/A Final Plat & As-Built Record Drawings are identical Yes  No  N/A DOT Encroachment Agreement Yes  No  N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes  No  N/A Master Plan submitted for additional phases if intended Yes  No  N/A Ballot REVIEWER: Shane Cummings Date: January 7, 2012 VOTE: Hold CONDITIONS: SHORT TERM: There should be a 20ft easement shown between lots 123 and 124 for the proposed sewer line for Phase X. The Contractor and Engineer of Record must have a preconstruction meeting with HCDPU prior to construction. A list of approved material submittals must be submitted to HCDPU with the Engineers approval and/or comments prior to construction. The water and sewer utilities must be installed, tested and approved by HCDPU and the Engineer of Record. Final Inspection must be conducted by the Engineer of Record and HCDPU. The Engineer of Record must submit to HCDPU Engineer Certification of the utilities installed and include field reports. The Engineer of record must submit to HCDPU record drawings of the water and sewer utilities for Carolina Lakes Block T. These record drawings must be in the form of 3 hard copies, 1 set of mylars an Auto-Cad formatted disk and pdf drawing. The Engineer of record must submit to HCDPU a cost statement for the water and sewer utilities. The Water and Sewer utilities need final approval from NCDENR. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process. The developer must submit a one year warranty for the installation of the utilities to HCDPU.