HomeMy WebLinkAbout2011/01/10 RESOLUTION APPROVING FY 2010-2011 SECONDARY ROAD PROGRAMHarnett
COUNTY
NORTH CAROLINA
www.harnett.org
Resolution Approving FY 2010 -2011
Secondary Road Program
BE IT RESOLVED that the Harnett County Board of Commissioners
does hereby approve the FY 2010-2011 Secondary Road Program for Harnett County as
presented by the North Carolina Department of Transportation. The Program is attached
to this resolution as "Attachment A ".
Puly adopted this 10`h day of January, 2011.
o`
C........, use,,
o = =•? t= tea:. r n HARNETT COUNTY BOARD OF COMMISSIONERS
�rll l l; f 1 l • "`t
Tiniot y B. McNeill, Chairman
ATTEST:
j
Mar
et Regina heeler, Clerk
k Clerk tot Board
strong roots • new growth
ATTACHMENT A
2010-2011
North Carolina Department of Transportation
Proposed Secondary Road Program
Harnett County
Allocation and Funding
Highway Fund $ 852,211.69
Trust Fund $ 1,232,256.23
Total Allocation $ 2,084,467.92
Funds to Cover Overruns
in Previously Approved Projects $ 100,000.00
Total Funding Available $ 1,984,467.92
Paving Program $ 1,570,000
Funds used to build and pave unpaved roads in priority order from the Rural and
Residential /Subdivision List
Rural Paving Priority
Map
Road Name
Description
Length
Estimate
Number
(mi.)
Future Funding
(mi.)
Of Cost
1
SR 1257
SR 1262 to End of Pavement
1.90
$ 500,000
South River Rd
Grade, Drain, Base, and Pave
2
SR 1714
SR 1705 to SR 1712
0.90
$ 250,000
Partin Rd
Grade, Drain, Base, and Pave
3
SR 1123
SR 1142 to End Maintenance
0.50
$ 100,000
Creeksville Church Rd
Grade, Drain, Base, and Pave
4
SR 1284
SR 1281 to End Maintenance
0.30
$ 105,000
Moore Union Church Rd
Grade, Drain, Base, and Pave
5
SR 1224
SR 1215 to Begin Pavement
0.25
$ 80,000
McNeill Rd
Grade, Drain, Base, and Pave
Sub -total
Rural Alternates
$ 1,035,000
Road Name
Description
Length
Estimate of
(mi.)
Future Funding
SR 1509
SR 1510 to SR 1542
0.80
$ 260,000
Gardner Rd
Grade, Drain, Base, and Pave
Subdivision. Paving Priority
Map
Road Name
Description
Length
Estimate
Number
(mi.)
Future Funding
mi.
Of Cost
6
SR 2170
SR 1115 to End Maintenance
0.61
$ 200,000
Peacock Mallard Rd
Grade, Drain, Base, and Pave
0.35
$ 80,000
7
SR 2158
End Pavement to End Maintenance
0.26
$ 110,000
SR 1779 to End Maintenance
Roberts Rd
Grade, Drain, Base, and Pave
Leanna Ln
Grade, Drain, Base, and Pave
8
SR 2424
SR 1120 to End Maintenance
0.25
$ 125,000
C Holder Ln
Grade, Drain, Base, and Pave
9
SR 1308
End Pavement to End Pavement
0.38
$ 100,000
Manor Hills Rd
Grade, Drain, Base, and Pave
Sub -total
Subdivision Alternates
$ 535,000
Road Name
Description
Length
Estimate of
(mi.)
Future Funding
SR 2310
SR 2021 to End Maintenance
0.10
$ 30,000
Bad Roads Ln
Grade, Drain, Base, and Pave
SR 2488
SR 1147 to SR 1147
0.35
$ 80,000
McFayden Dr
Grade, Drain, Base, and Pave
SR 2309
SR 1779 to End Maintenance
0.31
$ 80,000
Leanna Ln
Grade, Drain, Base, and Pave
In the event that any roads in priority have to be placed on the "Hold List' due to
unavailable right of way, encounter delays in environmental review, or if additional
funding becomes available, funds will be applied to the roads listed in priority order in the
paving alternate lists.
Spot Improvements
$ 185,000
Funds used to supplement secondary road maintenance operations such as unpaved
road stabilization with stone or local materials, shoulder repair, widening of paved
secondary roads, drainage improvements, and safety projects
Contingency Reserve
$ 229,467.92
Funds used for unpaved road surveying and right of way acquisition, unpaved road
additions, property owner participation, paving driveways of rural fire or rescue
departments, and overdrafts
Summary
Grand Total
Programmed Paving Goal
Rural
Subdivision
$ 2,084,467.92
5.35 miles
3.85 miles
1.50 miles
Subdivision Paving Priority
Map
Road Name
Description
Length
Estimate
Number
(mi.)
Future Funding
mi.
Of Cost
6
SR 2170
SR 1115 to End Maintenance
0.61
$ 200,000
Peacock Mallard Rd
Grade, Drain, Base, and Pave
0.35
$ 80,000
7
SR 2158
End Pavement to End Maintenance
0.26
$ 110,000
SR 1779 to End Maintenance
Roberts Rd
Grade, Drain, Base, and Pave
Leanna Ln
Grade, Drain, Base, and Pave
8
SR 2424
SR 1120 to End Maintenance
0.25
$ 125,000
C Holder Ln
Grade, Drain, Base, and Pave
9
SR 1308
End Pavement to End Pavement
0.38
$ 100,000
Manor Hills Rd
Grade, Drain, Base, and Pave
Sub -total
Subdivision Alternates
$ 535,000
Road Name
Description
Length
Estimate of
(mi.)
Future Funding
SR 2310
SR 2021 to End Maintenance
0.10
$ 30,000
Bad Roads Ln
Grade, Drain, Base, and Pave
SR 2488
SR 1147 to SR 1147
0.35
$ 80,000
McFayden Dr
Grade, Drain, Base, and Pave
SR 2309
SR 1779 to End Maintenance
0.31
$ 80,000
Leanna Ln
Grade, Drain, Base, and Pave
In the event that any roads in priority have to be placed on the "Hold List' due to
unavailable right of way, encounter delays in environmental review, or if additional
., funding becomes available, funds will be applied to the roads listed in priority order in the
paving alternate lists.
Spot Improvements
$ 185,000
Funds used to supplement secondary road maintenance operations such as unpaved
road stabilization with stone or local materials, shoulder repair, widening of paved
secondary roads, drainage improvements, and safety projects
Contingency Reserve $ 229,467.92
Funds used for unpaved road surveying and right of way acquisition, unpaved road
additions, property owner participation, paving driveways of rural fire or rescue
departments, and overdrafts
Summary
Grand Total
Programmed Paving Goal
Rural
$ 2,084,467.92
5.35 miles
3.85 miles
Subdivision 1.50 miles