HomeMy WebLinkAbout2010/03/15 RESOLUTION AMENDING THE HARNETT CTY SUBDIVISION REGULATIONS Art V Sec 5.3Harnett
C 0 U N T Y
NORTH CAROLINA
A RESOLUTION AMENDING THE
HARNETT COUNTY SUBDIVISION REGULATIONS
www.harnott.org
WHEREAS, the Board of Commissioners of Harnett County adopted the Harnett County
Subdivision Regulations on April 7, 1977 for the purpose of promoting the health, safety, and
general welfare of the county residents; and
WHEREAS, this ordinance was adopted under authority granted by the General Assembly of the
State of North Carolina, particularly G.S. 153A -330; and
WHEREAS, the Subdivision Regulations contains provisions for amending said ordinance and
those provisions have been followed; and
WHEREAS, the Harnett County Planning Board has reviewed the amendment to the articles of the
Subdivision Regulations as listed below and recommends the adoption of the following
amendment.
• NOW, THEREFORE BE IT RESOLVED BY THE BOARD OF COMMISSIONERS OF
HARNETT COUNTY, NORTH CAROLINA that Article V "Design Standards ", Section 5.3
"Water and Sewer" of the Subdivision Regulations shall be amended to read as indicated in
"Attachment ".
•
Duly adopted this 15'h day of March, 2010 and effective upon adoption.
HARNETT COUNTY BOARD OF COMMISSIONERS
strong roots • new growth
I
Timothy B.INeill, Chairman
• ATTACHMENT A
DELETE the following table from Article V Section 5.3 "Water and Sewer", Sections "53.1 A" & "5.3.2
A" as shown
SECTION 5.3 WATER AND SEWER
Installation and provision for water supply and sewage disposal shall be according to the
standards of the Harnett County Department of Public Utilities Comprehensive Water and
Sewer Plans and the Harnett County Health Department.
SECTION 5.3.1 WATER SUPPLY SYSTEM:
A. Connection Requirement: Any subdivision which is created after the adoption of this
Section, and is located within that number of feet of an existing County owned or
operated water supply and distribution system as is specified in Subsection B. below,
whether the subdivision is located within or without the service area of an existing
County owned or operated public water supply and distribution system, the developer
or subdivider shall cause a water distribution system, meeting the standards herein
specified, to be constructed and installed in such subdivision and shall further cause
said water distribution system to be connected to the existing County owned or
operated public water supply and distribution system which is located as specified in
• said Subsection B. This requirement also applies to new phases of existing
subdivisions when these phases have not been previously approved by the
appropriate Harnett County governing body.
The developer or subdivider may establish and create a public water supply system or
connect the subdivision to an existing public water supply system. However, such
created public water supply system or such water distribution system to be connected
to an existing system shall be approved by and meet the requirements of all federal,
state, and local governments, including but not limited to the North Carolina
Department of Health and Human Resources and the North Carolina Utilities
Commission.
SECTION 5.3.2 SEWAGE DISPOSAL SYSTEM:
A. Connection Requirement: Any subdivision which is created after the adoption of this
Section, and is located within that number of feet of an existing County owned or
operated sewage disposal system as is specified in Subsection B below, whether the
subdivision is located within or without the service area of an existing County owned
or operated public sewage disposal system, the developer or subdivider shall cause a
sewage disposal system, meeting the standards herein specified, to be constructed and
installed in such subdivision and shall further cause said sewage disposal system to be
connected to the existing County owned or operated public sewage disposal system
which is located as specified in said Subsection B. This requirement also applies to
new phases of existing subdivisions where these phases have not been previously
• approved by the appropriate Harnett County governing board.
• The developer or subdivider may establish and create a public sewage disposal
system or connect the subdivision to an existing public sewage disposal system.
However, such created public sewage disposal system or such sewage disposal
system to be connected to an existing system shall be approved by and meet the
requirements of all federal, state and local governments, including but not limited to
the Division of Health Services, Department of Human Resources of the State of
North Carolina and the North Carolina Utilities Commission.
I*
•