The Harnett County Board of Commissioners; at its regular monthly
meeting, held on the 5th day of December, 1983, does hereby resolve:
Section 1. That the ordinance entitled: "AN ORDINANCE ESTABLISHING
THE ADOPTION, ADMINISTRATION AND ENFORCEMENT OF HEREINAFTER DESCRIBED
CODES AND ORDINANCES ALONG R'ITH THE AUTHORITY AND DUTIES OF THE INSPECTION
OFFICIALS," which ordinance is recorded in Ordinance Book No. 1, at Page
155, is hereby amended as follows:
HARNETT COUNTY PERMIT FEES
Fees for permits shall be based upon the total estimated cost of the proposed
work including ail' sub - contracts if °any, but in no case shall the total estimated
cost be less than the market value of similar completed work in the same or
similar location as determined by the appropriate Inspector or Inspectors.
Failure to obtain permits at the proper time will cause the fees charged
to be doubled.
RIITT nINr
Type
A. Residential
$1,000 to $5,000
$5,001 to $10,000
$10,001 and Above
B. Non - Residential
$1,000 to $10,000
$10,001 to $25,000
Cost = C Fee = F
$25,001 to $300,000
$300,001 to $500,000
$500,001 and Above
C. Maximum Fee = $3,025
Re- inspection = $10
Fee
$10
$25
$25 and $2.50 per thousand
$25
$50
F = C x .0035
F = 1050 + C - $300,000 x .003
F = 1650 + C - $500,000 x .00275
D. Re- inspection is an inspection made on a job that the work is not ready
for,-that inspection.
ELECTRICAL
Type Fee
Residential - New Construction $25
Other
Three Wire
0 -200
Amp
$25
Amps
201
Amp P, Above
$20
230 Volts
Fixed
Appliances
$ 3
Reconnect,
Bulk
Barns, Accessory
2000
Building,
Field
Light, Sign Rewire
2000
€, Etc.
$.05
per Amp
$15
Commercial and Industrial Service Equipment
225
Amps
to
400
Amps
$40
401
Amps
to
1000
Amps
$70
1001
Amps
to
2000
Amps
$140
Over
2000
Amps
$.05
per Amp
$ 8
Over
10 H.P.
$.50
Emergency
Power Systems
25
kw to
SO
kw
$50
Over
50 kw
$.50
per
kw
Sub Panels
100 .Amps
to
225
Amps
$15
226
Amps to
600
Amps
$30
Over
600 Amps
$.05
per Amp
Motors
208 Volts and Over
'= H.P
to 10
H.P.
$ 8
Over
10 H.P.
$.50
per H.P.
Motor Feeders, 208 and Over
$3.00 Per Feeder
General Lighting and Outlet Load
Up to 2000 Square Feet $2S
Over 2000 Square Feet $.01 Per Square Foot
F
Parking Lot Lighting
Type _. Fee
1 kw to 10 kw $15
Over 10 kw $.50 Per kw
Plumbing
Type Fee
Minimum Fee $25
or
1st Bathroom Group Consisting of:
Water Closet, Lavatory and Tub or
Shower.
All other and additional Fixture Type $2.50 per Fixture Type
Refer to Volume II of North Carolina
Plumbing Code - Chapter 13 -4
Reinspection $10
Where existing structures are to be
connected to public central wastewater
system, the inspection permit fees will be:
Residential minimum fee (200 feet or less). $10
Each additional foot at $.10 / lineal foot.
Plus $5.00 additional for Sump or
Ejector Pump.
Commercial minimum fee (200 feet or less). $15
Each additional foot at $.15 / lineal foot.
Plus $5.00 additional fee for Grease
or Sand Trap.
Plus $10.00 additional fee for Sump
or Ejector Pump.
Heating and Air Conditioning
Type Fee
Heating:
Boiler - Hot Water, Steam,
Steam Generator $2S
Force Air - Warm Air, Heat Pump,
Gas Pack, Solar System $20
Electrical - Electric Baseboard $15
3
Type
Cooling:
1 to 5 tons/ cooling $10
Each additional ton /cooling $3
Reinspection $10
Miscellaneous
Mobile Home $30
Travel Trailer (under 32 feet) $20
Modular Home $60
Zoning Change- Land -Use Permit $50
Reinspection $10
Contractor Privilege License $10
Section 2. All fee schedules appearing at the end of the above ordinance
are repealed.
Section 3. Notice of the filing of this resolution to amend the inspection
code by additions to the existing plumbing permit fee and electrical fee sections
of the ordinance was given on November 17, 1983. Copies of the proposed
additions were available at the Harnett County Inspections Office and the
Harnett County Manager's Office during regular working hours. Notice that a
public hearing would be held at 9:30 a.m. on Monday, December 5, 1983, for the
purpose of receiving oral or written presentations relative to the proposed
ordinance amendment were given.
Section 4. The amendment shall be effective upon ratification of this
resolution.
NOW, THEREFORE, the Board of County Commissioners does hereby pass on its
first reading the above proposed amendment and sets the date for the second
reading to be the 19th of December, 1983.
Adopted this the Fifth Day of December, 1983.