HomeMy WebLinkAbout03/17/08 Communications Tower Text Amendment "Attachment A"HARNETT COUNTY
NORTH CAROLINA
A RESOLUTION REWRITING THE
HARNETT COUNTY COMMUNICATIONS TOWER ORDINANCE
WHEREAS, the Board of Commissioners of Harnett County adopted a Communications Tower
Ordinance on December 4, 2000 for the purpose of promoting the health, safety, and general
welfare of the county residents; and
WHEREAS, this ordinance was adopted under authority granted by the General Assembly of the
State of North Carolina, particularly G.S. 153A -340; and
WHEREAS, the Communications Tower Ordinance contains provisions for amending said
ordinance and those provisions have been followed; and
WHEREAS, the Harnett County Planning Board has reviewed the rewrite of the Communications
Tower Ordinance as listed below and recommends the adoption of the following rewrite.
NOW, THEREFORE BE IT RESOLVED BY THE BOARD OF COMMISSIONERS OF
HARNETT COUNTY, NORTH CAROLINA that the Communications Tower Ordinance shall be
rewritten to read as indicated in Attachment A.
"Attachment A" is filed with the Communications Tower Ordinance in the Clerk to the Board's
Office.
Duly adopted this 17`h day of March, 2008 and effective upon adoption.
H= TY ARD OF COMMISSIONERS
T y J. Byrdolqrman
ATTEST: "
Kay S. Blanch d, Clerk to the Board
Attachment A - DRAFT
Communications Tower Ordinance
of
Harnett County, North Carolina
Harnett
COUNTY
NORTH CAROLINA
Regulating the Deployment of
Telecommunications Infrastructure
Adopted March 17, 2008
Prepared by:
-4 POPE
Consultants, Inc.
CityScape Consultants, Inc.
7040 W Palmetto Park Road
Suite 4, PMB 652
Boca Raton, FL 330433
Tel 954.757.8668 or Fax 954.757.9994
TABLE OF CONTENTS
ARTICLE I. TITLE, PURPOSE, AUTHORITY, & EFFECTIVE DATE ............................4
SECTION1.0' 1' I" IT. E ................................................................................................................. ..............................4
SECTION2.0 PURPOSE ........................................................................................................... ..............................4
SECTION3.0 AUT'HORITI' ..................................................................................................... ..............................4
SE'CT'ION 4.0 EFFECTIVE: DATE ........................................................................................... ..............................5
SECTION 5.0 REPEAL Ol' PRE - EXISTING CO2NUM 1NIC 4'1'IONS TO \X -'ER ORDINANCE ............................5
ARTICLEII. JURISDICTION .................................................................. ..............................5
ARTICLE III. EXEMPTIONS .................................................................. ..............................5
SECTION 1.0 EXISTING C0M _\IUNIC:Y1'IONS TOWERS ................................................... ..............................5
SECTION 2.0 EXEMPT FACILI TIES ....................................................................................... ..............................5
ARTICLE IV. GENERAL PROVISIONS ................................................. ..............................6
SECTION 1.0 APPLICATION OF T'ITIS ORDINANCE .......................................................... ..............................6
SEC'110N 2.0 ABANDONNIENT (DISCONTINUED USE:) ................................................... ..............................6
SECTION 3.0 CONFLICT \KITH OTHER LAWS OR REGULATIONS ................................ ...............................
7
SECTION 4.0 SEVFRABILITY OF ORDINANCE .................................................................. ..............................7
SECTION 5.0 INTERFERENCE WITH PUBLIC SAFETY COMMUNICA TION S ................ ..............................7
ARTICLE V. ANTENNAS, TOWERS, & ASSOCIATED EQUIPMENT ............................8
SECTION 1 0BUILDING CODE REQUIREN IENTS ............................................................. ..............................8
..... ..............................8
SECTION 2.0 PERDIITS REQUIRED .............................................................................. .. ..
SECTION 3.0 LOCATING AL'TERNAT'IVES ORDER ........................................................... ..............................9
SECTION 4.0 FACILITY USE REGULATIONS & RI3QUIRED PERM ITS ........................... .............................10
ARTICLE VI. PERMIT (LEVEL I) AMATEUR RADIO TOWERS ...... .............................10
SFC'TION 1.0 APPLICATION REQUIREM ENTS .................................................................. .............................10
SECTION 2.0 TO \X'F..R HEIGHT ............................................................................................. .............................10
SECTION3.0 SETBACKS ...................................................................................................... ...............................
I1
ARTICLE VII. PERMIT (LEVEL II) CO- LOCATION, COMBINATION,
ATTACHMENT, ANTENNA ELEMENT REPLACEMENT, REPLACEMENT
TOWERS, AND CONCEALED TOWERS ............................................ .............................11
SECTION 1.0 APPLICATION REQUIREM ENT S ................................................................ ...............................
I 1
SECTION 2.0 CO- LOCATION & COMBINATION ............................................................... .............................11
SECTION 3.0 A'TTACHAIF.NT� CONCEALED & NONCONCEALM ................................ .............................12
SECTION 4.0 <ANTENN I ELEMENT REPLACEMENT' ...................................................... .............................12
SECTION5.0 NHTIGATION ................................................................................................. ...............................
13
SECTION6.0 CONCEALED TOWERS ................................................................................ ...............................
13
ARTICLE VIII. PERMIT (LEVEL III) NEW NON - CONCEALED TOWERS ................17
SECTION 1.0 APPLICATION REQUIREMENTS .................................................................. .............................17
SECTION 2.0 DFT'FRNTINATION OF NEED ....................................................................... .............................17
SECTION3.0 HEIGHT ............................................................................................................ .............................17
SECTION4.0 SETBACKS ...................................................................................................... ...............................
17
SECTION 5.0 EQUIPMENT CABINE' fS .............................................................................. ...............................
18
SECTION6.0 FENCING ......................................................................................................... .............................18
SECTION7.0 BUFFER ............................................................................................................. .............................18
2
SECTION8.0 SIGNAGE ........................................................................................................ ...............................
18
SECTION9.0 LIGHT ING ........................................................................................................ .............................19
SECTION 1001: OUIPMENTCOMPOUND .......................................................................... .............................19
SECTION11.0 VISIBILITY .................................................................................................... ...............................
19
ARTICLE IX. PERMIT (LEVEL IV) BROADCAST FACILITIES ........ .............................20
SECTION 1.0 APPLICATION RI QUIRE\ fENTS .................................................................. .............................20
SECTION2.0 DETERMINATION OF NEED ....................................................................... .............................20
SECTION3. 0 HEIGHT. ........................................................................................................... .............................20
SUCTION4.0 SETBA CKS ........................................................................................................ .............................20
SECTION5.0 EQUIPMENT CABINETS ................................................................................ .............................20
SUCTION6.0 FENCING ......................................................................................................... .............................20
SECTION7.0 BUFFER ............................................................................................................. .............................21
SECTION8.0 SIGNAGE .......................................................................................................... .............................21
SECTION9. 01A GHTING ........................................................................................................ .............................21
SECTION10.0 EQUIPMENT COMPOUND .......................................................................... .............................22
SECTION11.0 VISIBILI' lY ...................................................................................................... .............................22
ARTICLE X. APPLICATION REQUIREMENTS ................................. .............................22
SECTION 1.0 REOUIRETNIEN-1 S FOR CO- LOCA'I'ION.IND -\ TT:\ CH,,IENT .................. .............................22
SECTION 2.0 REQUIREMENTS FOR NUTIG ATION & NEW LEVEL, 11 & III TOWERS ... .............................23
SECTION 3.0 REOUIRFbIENTS FOR NEW LEVEL IV TOWERS ....................................... .............................25
ARTICLE XI. REVIEW & DECISION MAKING BODIES ................... .............................27
SECTION 10 ESPABLISHMENTOF THE BOARD OFADIUS MENP ............................. .............................27
ARTICLE XII. CHANGES & AMENDMENTS ..................................... .............................27
SECTION1.0 AMENDMENTS ............................................................................................... .............................27
ARTICLE XIII. ADMINISTRATION, ENFORCEMENT, & PENALTIES .....................
28
SECTION1.0 ADMINISTRATION ......................................................................................... .............................28
SECTION2.0 ENFORCF.NIEN'1' ............................................................................................. .............................28
SECTION3.0 PENALTIES .................................................................................................... ...............................
28
SECTION4.0 FEES .................................................................................................................. .............................28
SECTION5.0 APPSA ............................................................................................................. .............................29
ARTICLE XIV. INTERPRETATION OF CERTAIN TERMS & DEFINITIONS ...........
29
SECTION1.0 INTERPRETATION ......................................................................................... .............................29
SECTION2.0 DEFINITIONS .................................................................................................. .............................30
3
ARTICLE I. TITLE, PURPOSE, AUTHORITY, & EFFECTIVE DATE
SECTION 1.0 TITLE
This Ordinance shall be known and may be cited as the "Communications Tower Ordinance of
Harnett County, North Carolina" also known as "the Ordinance ", "this Ordinance ", and
"Ordinance" herein.
SECTION 2.0 PURPOSE
The purpose of this Ordinance is to establish general guidelines for the locating of telecommunications
towers, antenna, ground equipment and related accessory structures. The purpose and intent of this
Ordinance are to:
A. Promote the health, safety, and general welfare of the public by regulating the locating of
telecommunication facilities.
B. Minimize the impacts of telecommunication facilities on surrounding land uses by
establishing standards for location, structural integrity, and compatibility.
C. Encourage the location and co- location of telecommunication equipment on existing
structures thereby minimizing new visual, aesthetic, and public safety- impacts, effects upon
the natural environment and wildlife, and to reduce the need for additional towers.
D. Accommodate the groNving need and demand for telecommunication services.
E. Encourage coordination between suppliers and providers of telecommunication services.
P. Establish predictable and balanced codes governing the construction and location of
telecommunications facilities within the confines of permissible local regulations.
G. Establish review procedures to ensure that applications for telecommunications facilities are
reviewed and acted upon within a reasonable period of time.
1-1. Respond to the policies embodied in the Telecommunications Act of 1996 in such a manner
as not to unreasonably discriminate between providers of functionally equivalent personal
wireless services or to prohibit or have the effect of prohibiting personal wireless services.
1. Protect the character of the County while meeting the needs of its citizens to enjoy the
benefits of telecommunications services.
J. Encourage the use of public lands, buildings, and structures as locations for
telecommunications infrastructure demonstrating concealed technologies and revenue
generating methodologies.
SECTION 3.0 AUTHORITY
The provisions of this Ordinance are adopted under authority granted by the General Assembly of the State
of North Carolina with particular reference to Article 6 of Chapter 153A of the North Carolina General
Statues.
4
SECTION 4.0 EFFECTIVE DATE
This Ordinance shall be effective from and after the date of its adoption by the Harnett County Board of
Commissioners.
SECTION 5.0 REPEAL OF PRE - EXISTING CONMIUNICATIONS TOWER ORDINANCE
The provisions and requirements of this Ordinance supersede all the provisions and requirements of the pre-
existing Harnett County Communications Tower Ordinance adopted on December 4, 2000 and amended
through June 17, 2002,
ARTICLE II. JURISDICTION
These regulations shall govern the establishment and maintenance of communications towers. Provisions of
this Ordinance shall apply uniformly to all areas within the jurisdiction of Harnett County.
ARTICLE III. EXEMPTIONS
SECTION 1.0 EXISTING COMMUNICATIONS TOWERS
Communications towers existing prior to the adoption of the Communications Tower Ordinance on
December 4, 2000 or permitted prior to the adoption of this Ordinance shall be allowed to continue to
operate provided they met the requirements set forth by Harnett County at the time of final inspection; not
including any communications towers that are currently in violation of this Ordinance and pre - existing
Communications Tower Ordinance of Harnett County.
SECTION 2.0 EXEMPT FACILITIES
The following items are exempt from the provisions of this Ordinance; notwithstanding any other provisions:
A. Any tower less than fifty (50) feet in height or communications towers existing or permitted
prior to the adoption of this Ordinance.
B. Satellite earth stations that are one (1) meter (39.37 inches) or less in diameter in all
residential zoning districts and two (2) meters or less in all other zoning districts.
C. A government -owned communications facility, upon the declaration of a state of emergency
by federal, state, or local government, and a written determination of public necessity by the
County designee; except that such facility must comply with all federal and state
requirements. No communications facility shall be exempt from the provisions of this
division beyond the duration of the state of emergency.
D. A government -owned communications facility erected for the purposes of installing
antenna(s) and ancillary equipment necessary to provide communications for public health
and safety.
E. A temporary, commercial communications facility, upon the declaration of a state of
emergency by federal, state, or local government, or determination of public necessity by the
County and approved by the County; except that such facility must comply with all federal
and state requirements. The communications facility may be exempt from the provisions of
this division up to three (3) months after the duration of the state of emergency.
F. A temporary, commercial communications facility, for the purposes of providing coverage
of a special event such as news coverage or sporting event, subject to approval by the
County, except that such facility must comply with all federal and state requirements. Said
communications facility may be exempt from the provisions of this division up to one (1)
week after the duration of the special event.
ARTICLE IV. GENERAL PROVISIONS
SECTION 1.0 APPLICATION OF THIS ORDINANCE
This Ordinance shall apply to the development activities including installation, construction, or modification
of all wireless communications facilities including but not limited to:
A. Non - commercial, amateur radio station antennas.
B. Existing towers.
C. Proposed towers.
D. Public towers.
E. Mitigation of towers.
F. Co- location on existing towers.
G. Attached wireless communications facilities.
H. Concealed wireless communications facilities.
1. Non - concealed towers
J. Broadcast facilities.
SECTION 2.0 ABANDONMENT (DISCONTINUED USE)
A. Towers, antennas, and the equipment compound shall be removed, at the owner's expense,
within 180 days of cessation of use, unless the abandonment is associated with a mitigation
as provided in the `Mitigation' section of this Ordinance, in which case the removal shall
occur within ninety (90) days of cessation of use.
B. An owner wishing to extend the time for removal or reactivation shall submit an application
stating the reason for such extension. The County may extend the time for removal or
reactivation up to sixty (60) additional days upon a showing of good cause. If the tower or
antenna is not removed within this time, the County may give notice that it will contract for
removal within thirty (30) days following written notice to the owner. Thereafter, the County
may cause removal of the tower with costs being borne by the owner.
C. Upon removal of the tower, antenna, and equipment compound, the development area shall
be returned to its natural state and topography and vegetated consistent with the natural
surroundings or consistent with the current uses of the surrounding or adjacent land at the
time of removal, excluding the foundation, which does not have to be removed.
SECTION 3.0 CONFLICT WITH OTHER LAWS OR REGULATIONS
When the requirements of this Ordinance conflict with the requirements of other lawfully adopted rules,
regulations, or ordinances of Harnett County, or deeds restrictions imposed by the developer or subdivider,
the more stringent requirements shall govern.
SECTION 4.0 SEVER-ABILITY OF ORDINANCE
Should any section or provisions of this Ordinance be decided by a court of competent jurisdiction to be
unconstitutional or invalid, such decision shall not affect the validity of the Ordinance as a whole or any part
thereof other than the part so declared to be unconstitutional or invalid.
SECTION 5.0 INTERFERENCE WITH PUBLIC SAFETY COMMUNICATIONS
In order to facilitate the regulation, placement, and construction of antenna, and to ensure that all parties are
complying to the fullest extent possible with the rules, regulations, and /or guidelines of the FCC, each owner
of an antenna, antenna array or applicant for a co- location shall agree in a written statement to the following:
A. Compliance with "Good Engineering Practices" as defined by the FCC in its rules and
regulations.
B. Compliance with FCC regulations regarding susceptibility to radio frequency interference,
frequency coordination requirements, general technical standards for power, antenna,
bandwidth limitations, frequency stability, transmitter measurements, operating
requirements, and any and all other federal statutory and regulatory requirements relating to
radio frequency interference (RFI).
C. In the case of an application for co- located telecommunications facilities, the applicant,
together with the owner of the subject site, shall use their best efforts to provide a composite
analysis of all users of the site to determine that the applicant's proposed facilities will not
cause radio frequency interference with the County's public safety communications
equipment and will implement appropriate technical measures, as described in antenna
element replacements, to attempt to prevent such interference.
D. Whenever the County, has encountered radio frequency interference with its public safety
communications equipment, and it believes that such interference has been or is being
caused by one or more antenna arrays, the following steps shall be taken:
1. The County shall provide notification to all wireless service providers operating in
the County of possible interference with the public safety, communications
equipment, and upon such notifications, the owners shall use their best efforts to
cooperate and coordinate with the County, and among themselves to investigate and
mitigate the interference, if any, utilizing the procedures set forth in the joint
wireless industry -public safety "Best Practices Guide," released by the FCC; in
February 2001, including the "Good Engineering Practices," as may be amended or
revised by the FCC from time to time.
2. If any equipment owner fails to cooperate with the County, in complying with the
owner's obligations under this section or if the FCC makes a determination of radio
frequency interference with the County public safety communications equipment,
the owner who failed to cooperate and /or the owner of the equipment which
caused the interference shall be responsible, upon FCC determination of radio
frequency interference, for reimbursing the County for all costs associated with
ascertaining and resolving the interference, including but not limited to any
engineering studies obtained by the County to determine the source of the
interference. For the purposes of this subsection, failure to cooperate shall include
failure to initiate any response or action as described in the "Best Practices Guide"
within twenty-four (24) hours of County's notification.
ARTICLE V. ANTENNAS, TOWERS, & ASSOCIATED EQUIPMENT
SECTION 1.0 BUILDING CODE REQUIREMENTS
Towers shall be constructed and maintained in conformance with all applicable building code requirements.
SECTION 2.0 PERb1ITS REQUIRED
A. Permit (Level I)- The permit issued by the Ordinance Administrator as designated by this
Ordinance, to an individual, corporation, partnership, or other entity to engage in the
creation of amateur radio tower.
13. Permit a,evel ID- The permit issued by the Ordinance Administrator as designated by this
Ordinance to an individual, corporation, partnership, or other entity to engage in co-
location, attached antennas, antenna element replacements, tower mitigation, or new
concealed towers, excluding amateur radio towers.
C. Perm t (Level III)- The Conditional Use Permit issued by the Ordinance Administrator (after
public hearing and approval by the Board of Adjustment) as designated by this Ordinance,
to an individual, corporation, partnership, or other entity to engage in the creation of new
towers, excluding amateur radio towers.
D. Permit (Level IV)- The Conditional Use Permit issued by the Ordinance Administrator (after
public hearing and approval by the Board of Adjustment) as designated by this Ordinance,
to an individual, corporation, partnership, or other entity to engage in the creation of new
towers, specifically broadcast facilities.
2.1 Permit Level Itec uirements
PERMIT
ISSUED BY
PERMIT
USE
LEVEL
TYPE
I
Zoning Administrator
P
Amateur radio no greater than fifty
50 feet in height
IT
Zoning Adtn nistrator
P
Co- location, attached antennas,
replacement and mitigation, and new
concealed towers
ITT
BOA
C
New non - concealed towers
IV
BOA
C
Broadcast facilities
Note: P- Permitted by Right C- Permitted Conditionally BOA- Board of Adjustment
SECTION 3.0 LOCATING ALTERNATIVES ORDER
3.1 Locating of New Antenna Array & New'Fowers
Locating of a new antenna array and new tower shall be in accordance with the preferred locating
alternatives order:
A. Concealed attached antenna
1. On publicly -owned property
2. On non pubhcly -owned property
B. Co- located or combined antenna on existing tower
1. On publicly -owned property
2. On non publicly -owned property
C. Non - concealed attached antenna
1. On publicly -owned property
2. On non publicly -owned property,
D. Mitigation of existing tower
1. On publicly -owned property,
2. On non publicly -owned property
E. Concealed freestanding tower
1. On publicly -owned property
2. On non publicly - owned property
F. Non - concealed freestanding tower
1. On publicly - owned property
2. On non publicly -owned property
3.2 Locating of Attached, Co- located, and Combined Antenna
For attached, co- located, or combined antenna, the order of ranking preference, highest to lowest,
shall follow the same ranking as provided in Al through D2 of `Locating of New Antenna Array &
New Towers' section above. NY'here a lower ranked alternative is proposed, the applicant must file
relevant information as required including, but not limited to, an affidavit by a radio frequency
engineer demonstrating that despite diligent efforts to adhere to the established hierarchy within the
geographic search area, higher ranked options are not technically feasible, practical or justified given
the location of the proposed communications facility.
3.3 Mitigation & Freestanding Towers
NWhere a mitigated or freestanding tower is permitted the order of ranking preference from highest to
lowest shall follow the same ranking as provided in Dl through F2 of `Locating of New Antenna
Array & New Towers' section above. Nt -Here a lower ranked alternative is proposed, the applicant
must file relevant information as required and demonstrate higher ranked options are not technically
feasible, practical, or justified given the location of the proposed communications facility, and the
existing land uses of the subject and surrounding properties within 300 feet of the subject property.
0
SECTION 40 FACILITY USE. REGULATIONS & REQUIRED PERA4ITS
New antennas and towers shall be permitted in Harnett County according to the table below.
Zoning
District
Concealed
Attached
Antenna
Co- located
or
Combining
on Existing
Tower
Non-
concealed
Attached
Antenna*
Mitigation of
Existing
Tower
Concealed
Freestanding
Tower
Non -
Concealed
Freestanding
Tower
Antenna
Element
Re lacemen
RA -40
Level 11
Level iI
Level II
Level II & III
Level 11
level II
RA -30
Level 11
Level II
Level II
Level If & III
Level 11
Level II
RA -20M
level II
Level II
Level II
Level 11 & Ill
Level 11
level iI
RA -20R
Level II
Level TI
Level Il
Level TT & III
Level II
Level II
IND
Level 11
Level II
Level II
level TI & III
Level II
Level III & IV
level 11
COMM
Level it
Level II
Level 11
bevel iI & Ill
Level 11
Level III & IV
Level iT
CONS
Level II
Level II
Level 1I
Lcvcl II & III
Level II
Level 111
Level II
O &I
Level II
Level 11
level II
Lcvcl II & III
Level 11
Level II
HCO
Level II
Level II
Level 11
Level IT & III
- Level II
Level IT
UNZONED
LAND
Level ❑
Level II
Level II
level II & III
Level II
Level III
Level It
HEIGHT
CONTROL
ORDINANCE
Level II
Level II
level II
Level II & III
Level TI
Level II
Note: Level I towers are permitted in all zoning districts.
'Non - concealed attached antennas arc only allowed on transmission towers and fight stanchions.
ARTICLE VI. PERMIT (LEVEL I) AMATEUR RADIO TOWERS
SECTION 1.0 APPLICAIION REQUIREMENTS
All Permit (I.evel 1) applications shall contain the following:
A. Completion of the "Communications Tower Ordinance of Harnett County, North Carolina
Application Permit."
B. ,Application Fee
C. Site Plan (see also `Application Requiremcnts�
D. Valid FCC amateur operator's license.
SECTION 2.0 TOWt ?R HEIGHT
Tower height and location shall comply with federal and state law. 'towers shall not exceed 199 feet unless
FCC approval is demonstrated.
10
SECTION 3.0 SETBACKS
A distance equal to the height of the tower shall separate new amateur radio towers from all structures not
located on the same parcel as the tower, property lines, right -of -way hnes and /or casements. Any relocation
of amateur radio towers shall remain on same parcel and must comply with stated Ordinance setback
requirements, or, if compliance is not possible, the relocation must not increase the amount by which
setbacks are nonconforming, other than increases necessitated solely by changes in size of the base to support
the new tower.
ARTICLE VII. PERMIT (LEVEL II) CO- LOCATION, COMBINATION,
ATTACHMENT, ANTENNA ELEMENT REPLACEMENT, REPLACEMENT
TOWERS, AND CONCEALED TOWERS
SECTION 1.0 APPLICATION REOUIRUMENTS
All Permit (Level II) applications shall contain the following:
A. Completion of the "Communications lower Ordinance of Harnett County, North Carolina
Application Permit"
B. Application Fee
C. Site Plan (see also `Application Requirements')
SECTION 2.0 CO- LOCATION & COMBINATION
Harnett County requires co- location and combining of antennas on existing communications towers as a first
priority where co- location is possible. Upon enactment of this Ordinance, any person, corporation,
partnership, or other entity which intends to co- locate on an existing communications tower within the
jurisdiction of this Ordinance must obtain a Permit (Level 11). Co- locations are subject to the following:
A. A co- located or combined antenna or antenna array shall not exceed the maximum height
prescribed in the Conditional Use Permit (if applicable) or increase the height of an existing
tower by more than twenty (20) feet and shall not affect any tower fighting.
B. New antenna mounts shall be flush- mounted onto existing structures, unless it is
demonstrated through radio frequency (Rh) propagation analysis that flush- mounted
antennas will not meet the neavork objectives of the desired coverage area.
C. The equipment cabinet shall be subject to the setback requirements of the underlying zoning
district.
D. %i/hen a co- located or combined antenna is to be located on a nonconforming building or
structure, then the existing permitted nonconforming setback shall prevail.
E. Applications entitled to the streamlined processes described in Section 160A- 400.53, North
Carolina General Statutes, shall meet all the following requirements:
L The additional antenna array, transmission lines, and related ancillary equipment
including the base station do not exceed the number of same items previously
approved for such tower when originally approved, and the collocated facility is in
complete conformance with the original conditions imposed on the tower upon
which it is being attached.
2. The proposed co- location shall not increase the overall height and width of the
tower or support structure to which the proposed infrastructure is to be attached.
3. The co- location shall not increase the ground space area approved in the
communications tower site plan for equipment enclosures and ancillary facilities.
d. the existing tower on which the co- location will attach shall comply with applicable
regulations, restrictions, and /or conditions, if any, applied to the initial wireless
facilities placed on the tower.
5. The proposed additional co- location and tower shall comply with all federal, state,
and local safety, requirements.
6. The proposed co- location and ancillan_- equipment shall not exceed the applicable
weight limits for the tower.
SECTION 3.0 AITACHN- IEN'r: CONCEALED & NONCONCEALED
Antennas may be mounted onto a structure which is not primarily constructed for the purpose of holding
attachment antennas but on which one (1) or more antennas may be mounted. Upon enactment of this
Ordinance, any person, corporation, partnership, or other entity which intends to place an antenna on an
alternative structure within the jurisdiction of this Ordinance must obtain a Permit (Level II). Attached
antenna shall be subject to the follow-ing:
A. The top of the attached antenna shall not be more than twenty (20) feet above the existing
or proposed building or structure
13. Non - concealed attachments shall only be allowed on electrical transmission towers and
existing light stanchions subject to approval by the Planning Department and utility
company.
C. \'hen an attached antenna is to be located on a nonconforming building or structure, the
existing permitted nonconforming setback shall prevail.
D. Except for non - concealed attached antennas, feed fines and antennas shall be designed to
architecturally match the fagade, roof, wall, and /or structure on which they arc affixed so
that they blend with the existing structural design, color, and texture.
SECTION 4.0 ANTENNA ELEMENT REPLACEME;Nf
For any replacement of an existing antenna element on an antenna, the applicant must, prior to making such
modifications, submit the following:
A. A written statement setting forth the reasons for the modification.
B. A description of the proposed modifications to the antenna, including modifications to
antenna element design, type and number, as well as changes in the number and /or size of
any feed lines, from the base of the equipment cabinet to such antenna elements.
C. A signed statement from a qualified person, together with their qualifications, shall be
included representing the tower's owner or owner's agent that the radio frequency emissions
comply with FCC standards for such emissions. The statement shall also certify that both
individually and cumulatively, and with any other facilities located on or immediately
adjacent to the proposed facility, the replacement antenna complies with I -CC standards.
D. A stamped or sealed structural analysis of the existing structure prepared by a registered
professional engineer licensed by the State of North Carolina indicating that the existing
tower as well as all existing and proposed appurtenances meets North Carolina Uniform
Statewide Building Code (USBC) requirements, including kind loading, for the tower.
12
SECTION 5.0 N11TIGATION
5.1 Minimum Mitigation Accomplishments
Mitigation shall accomplish a minimum of one (1) of the following:
A. Reduce the number of towers
B. Reduce the number of nonconforming towers
C. Replace an existing tower w th a new tower to improve network functionality resulting in
compliance with this Ordinance.
5.2 Mitigation Requirements
Mitigation is subject to the following:
A. No tower shall be mitigated more than one (1) time.
B. Height: Level II and Level III
1. Level II: The height of a tower approved for mitigation shall not exceed one
hundred and fifteen percent (115 %) of the height of the tallest tower that is being
mitigated. (For example, a 250 foot existing tower could be rebuilt at 287.5 feet)
2. Level III: The height of a tower may exceed the a hundred and fifteen percent
(115 %) of the height of the tallest tower that is being mitigated approved for
mitigation with undisputable evidence that the new tower will eliminate the need for
an additional antenna array within a distance of two (2) miles. Under no
circumstance shall any mitigated tower exceed a height of 300 feet.
C. Setbacks: A new tower approved for mitigation of an existing tower shall not be required to
meet new setback standards so long as the new tower and its equipment compound are no
closer to any property lines or dwelling units as the tower and equipment compound being
mitigated. The intent is to encourage the mitigation process, not penalize the tower owner
for the change out of the old facility. (For example, if a new tower is replacing an old tower,
the new tower is permitted to have the some setbacks as the tower being removed, even if
the old tower had nonconforming setbacks.)
D. Breakpoint technology: A newly mitigated monopole or lattice tower shall use breakpoint
technology in the design of the replacement facility.
E. Buffers: At the time of mitigation, the tower equipment compound shall be brought into
compliance with any applicable buffer requirements.
F. Visibility: Mitigated antenna - supporting structures shall be configured and located in a
manner that minimizes adverse effects on the landscape and adjacent properties, with
specific design considerations as to height, scale, color, texture, and architectural design of
the buildings on the same and adjacent zoned lots.
SECTION 6.0 CONCEALED TOWERS
All new communications towers intended to replace an existing tower where the new tower meets the
following requirements:
A. Completion of the "Communications Tower Ordinance of Harnett County, North Carolina
Application Permit."
13
B. Application Fee
C. Site Plan (see also `Application Requirements)
6.1 Dctertnination of Need
No new or mitigated freestanding tower shall be permitted unless the applicant demonstrates that no
existing tower can accommodate the applicant's proposed use; or that use of such existing facilities
would prohibit personal wireless services in the geographic search area to be served by the proposed
tower.
6.2 Height
New concealed towers shall be limited to 199 feet or less in height. In HCO zones the maximum
height shall be 125 feet. Height calculations shall include above ground foundations, but exclude
lightning rods or lights required by the FAA that do not provide any support for antennas.
6.3 Setbacks
New freestanding towers and equipment compounds shall be subject to the setbacks described below
for breakpoint technology:
A. If the tower has been constructed using breakpoint design technology (sec `Definitions'), the
minimum setback distance shall be equal to 110 percent (110'%) of the distance from the top
of the structure to the breakpoint level of the structure, or the minimum side and rear yard
requirements, whichever is greater. Certification by a registered professional engineer
licensed by the State of North Carolina of the breakpoint design and the design's fall radius
must be provided together with the otter information required herein from an applicant.
(For example, on a 100 -foot tall monopole with a breakpoint at eighty (80) feet, the
minimum setback distance would be twenty -two (22) feet (I 10 percent of twenty (20) feet,
the distance from the top of the monopole to the breakpoint) plus the minimum side or rear
yard setback requirements for that zoning district.)
B. If the tower is constructed using breakpoint design technology, the minimum setback
distance shall be equal to the height of the proposed tower.
6.4 Equipment cabinets
Cabinets shall not be visible from pedestrian and right -of -way views. Cabinets may be provided
within the principal building, behind a screen on a rooftop, or on the ground within the fenced -in
and screened equipment compound.
6.5 Fencing
All equipment compounds shall be enclosed with an opaque fence or masonry will in residential
zoning districts, and in any zoning district when the equipment compound adjoins a public right -of-
way. Alternative equivalent screening may be approved through the site plan approval process
described in section 6.6(F) below.
IV
6.6 Duffers
The equipment compound shall be landscaped with a minimum ten (10) foot wide perimeter buffer
containing the following planting standards:
A. All plants and trees shall be indigenous to this part of North Carolina.
11. Existing trees and shrubs on the site should be preserved and may be used in lieu of required
landscaping as approved by the Planning Department.
C. One (l) row of evergreen trees with a minimum two (2) inch caliper, twenty -five (25) foot
on center.
D. Evergreen shrubs capable of creating a continuous hedge and obtaining a height of at least
Five (5) feet shall be planted, minimum three (3) gallon or twenty -Four (24) inches tall at the
time of planting, five (5) foot on center.
F. Alternative landscaping plans which provide for the same average canopy and understory
trees but propose alternative locating on the entire subject property may lie considered and
approved by the Planning Department, provided the proposed alternative maximizes
screening as provided above, and is otherwise consistent with the requirements of this
section.
6.7 Signage
Commercial messages shall not be displayed on any tower. Required noncommercial signage shall be
subject to the following:
A. The only signage that is permitted upon a tower, equipment cabinets, or fence shall be
informational, and for the purpose of identifying the tower (such as ASR registration
number), as well as the party responsible for the operation and maintenance of the facility,
and any additional security and /or safety signs as applicable.
B. If more than 220 voltage is necessary for the operation of the facility and is present in a
ground grid or in the tower, signs located every twenty (20) feet and attached to the fence or
wall shall display in large, bold, high contrast letters, minimum height of each letter four (4)
inches, the following: "HIGH VOLTAGE. - DANGI: ?R."
C. Name plate signage shall be provided, in an easily visible location, including the address and
telephone number of the contact to reach in the event of an emergency or equipment
malfunction, including property manager signs as applicable.
6.8 Lighting
Lighting on towers shall not exceed the Federal Aviation Administration (P:\ 1) minimum standards.
All other lighting shall be subject to the following.
A. Any fighting required by the FAA must be of the minimum intensity and number of flashes
per minute (i.e., the longest duration bethwcen flashes) allowable by the FAA. Dual lighting
standards are required and strobe light standards are prohibited unless required by the FAA.
B. Lights shall be oriented so as not to project directly onto surrounding property or rights -of-
wav, consistent with FAA requirements.
15
6.9 Equipment Compound
The fenced -in compounds shall not be used for the storage of any excess equipment or hazardous
materials. No outdoor storage yards shall be allowed in a tower equipment compound. The
compound shall not be used as habitable space.
6.10 Visibility
A. New towers shall be configured and located in a manner that shall minimize adverse effects
including visual impacts on the landscape and adjacent properties.
B. New freestanding towers shall be designed to match adjacent structures and landscapes with
specific design considerations such as architectural designs, height, scale, color, and texture.
C. A balloon test shall be required subsequent to the receipt of the photo simulations in order
to demonstrate the proposed height of the tower. The applicant shall arrange to raise a
colored balloon no less than three (3) feet in diameter at the maximum height of the
proposed tower, and within fifty, (50) horizontal feet of the center of the proposed tower.
D. The applicant shall meet the following for the required balloon test:
1. Applicant must inform the Planning Department and abutting property owners in
writing of the date and times, including alternative date and times, of the test at least
fourteen (14) days in advance.
2. 'llie date, time, and location, including alternative date, time and location, of the
balloon test shall be advertised in a locally distributed paper by the applicant at least
seven (7) but no more than fourteen (14) days in advance of the test date.
3. The balloon shall be flown for at least four (4) consecutive hours during daylight
hours on the date chosen. 'Ilse applicant shall record the weather during the balloon
test.
4. Re- advertisement will not be required if inclement weather occurs.
E. New antenna mounts shall be flush- mounted, unless it is demonstrated through RF
propagation analysis that flush- mounted antennas will not meet the network objectives of
the desired coverage area.
F. In residential zoning districts, new towers shall only be permitted on lots whose principal use
is not single- family residential, including schools, churches, synagogues, fire stations, parks,
and other public property.
G. Powers shall be constructed to accommodate antenna arrays as follows:
1. All freestanding towers up to 120 feet in height shall be engineered and constructed
to accommodate no less than four (4) antenna arrays.
2. All towers between 121 feet and 150 feet shall be engineered and constructed to
accommodate no less than Five (5) antenna arrays.
3. All towers between 151 feet and taller shall be engineered and constructed to
accommodate no less than six (6) antenna arrays.
H. Grading shall be minimized and limited only to the area necessary for the new tower and
equipment.
16
ARTICLE VIII. PERMIT (LEVEL III) NEW NON - CONCEALED TOWERS
SEC'T'ION 1.0 APPLICATION REQUIREMENT'S
All Permit (Level III) applications shall contain the following:
A. Completion of the "Communications "Cower Ordinance of Harnett County, North Carolina
Application Permit"
13. Application Fee
C. Site Plan (see also `Application Requirements')
SECl'ION 2.0 DF',TERNI1NATION OF NEED
No new or mitigated freestanding tower shall be permitted unless the applicant demonstrates that no existing
tower can accommodate the applicant's proposed use; or that use of such existing facilities would prohibit
personal wireless services in the geographic search area to be served by the proposed tower.
SECTION 3.0 HEIGHT
Height calculations shall include above ground foundations, but exclude lightning rods or lights required by
the FAA that do not provide any support for antennas. It is intended that all new non - broadcasting towers be
199 feet or less in height. However, should a tower be required in excess of 200 feet, under no circumstance
shall any tower exceed 300 feet. All new towers in excess of 199 feet shall be subject to the following
additional requirements:
A. Undisputable evidence that the antenna service area will be so substantially compromised
that there would be a requirement of additional antenna array within a distance of two (2)
miles.
13. The tower shall be designed to allow for a future reduction of elevation to no more than 199
feet, or the replacement of the tower with a monopole type structure at such time as the
wireless network had developed to the point that such heights can be justified.
C. In 1 ICO zones the maximum height shall be 125 feet.
SECTION 4.0 SETBACKS
New freestanding towers and equipment compounds shall be subject to the setbacks described below for
breakpoint technology:
A. If the tower is constructed using breakpoint design technology (see Definitions), the
minimum setback distance shall be equal to 110 percent of the distance from the top of the
structure to the breakpoint level of the structure, or the minimum side and rear yard
requirements, whichever is greater. Certification by a registered professional engineer
licensed by the State of North Carolina of the breakpoint design and the design's fall radius
must be provided together with the other information required herein from an applicant.
(For example, on a 100 foot tall monopole with a breakpoint at eighty (80) feet, the
minimum setback distance would be twenty -two (22) feet (110 percent of 20 feet, the
distance from the top of the monopole to the breakpoint) plus the minimum side or rear
yard setback requirements for that zoning district.)
13. If the tower is constructed using breakpoint design technology, the minimum setback
17
distance shall be equal to the height of the proposed tower.
SECTION 5.0 EQUIPMENT CABINETS
Cabinets shall not be visible from pedestrian and right -of -way views. Cabinets may be provided within the
principal building, behind a screen on a rooftop, or on the ground within the fenced -in and screened
equipment compound.
SECTION 6.0 FENCING
All equipment compounds shall be enclosed with an opaque fence or masonry wall in residential zoning
districts, and in any zoning district when the equipment compound adjoins a public right -of -way. Alternative
equivalent screening may be approved through the site plan approval process described in section 7(E) below.
SI�CTION 7.0 BUFFER
The equipment compound shall be landscaped with a minimum ten (10) foot wide perimeter buffer
containing the following planting standards-:
A. All plants and trees shall be indigenous to this part of North Carolina.
B. Existing trees and shrubs on the site should be preserved and may be used in lieu of required
landscaping as approved by the Planning Department.
C. One (1) row of evergreen trees with a minimum two (2) inch caliper, twenty -five (25) foot
on center.
D. Evergreen shrubs capable of creating a continuous hedge and obtaining a height of at least
five (5) feet shall be planted, minimum three (3) gallon or twenty-four (24) inches tall at the
time of planting, five (5) foot on center.
E. Alternative landscaping plans which provide for the same average canopy and understory
trees but propose alternative locating on the entire subject property may be considered and
approved by the Planning Department, provided the proposed alternative maximizes
screening as provided above, and is otherwise consistent with the requirements of this
section.
SECTION 8.0 SIGNAGE
Commercial messages shall not be displayed on any tower. Required noncommercial signage shall be subject
to the following:
A. The only signage that is permitted upon a tower, equipment cabinets, or fence shall be
informational, and for the purpose of identifying the tower (such as ASR registration
number), as well as the party responsible for the operation and maintenance of the facility,
and any additional security and /or safety signs as applicable.
B. If more than 220 voltage is necessary for the operation of the facility and is present in a
ground grid or in the tower, signs located every twenty (20) feet and attached to the fence or
wall shall display in large, bold, high contrast letters, minimum height of each letter four (4)
inches, the following: "HIGH VOLTAGE - DANGER."
C. Name plate signage shall be provided, in an easily visible location, including the address and
telephone number of the contact to reach in the event of an emergency or equipment
malfunction, including property manager signs as applicable.
SECTION 9.0 LIGHTING
Lighting on towers shall not exceed the Federal Aviation Administration (FAA) minimum standards. All
other lighting shall be subject to the following.
A. Any fighting required by the FAA must be of the minimum intensity and number of flashes
per minute (i.e., the longest duration between flashes) allowable by the FAA. Dual lighting
standards are required and strobe light standards are prohibited unless required by the FAA.
B. Lights shall be oriented so as not to project directly onto surrounding property, or rights -of-
way consistent with FAA requirements.
SECTION 10.0 EQUIPMENT COMPOUND
The fenced -in compounds shall not be used for the storage of any excess equipment or hazardous materials.
No outdoor storage yards shall be allowed in a tower equipment compound. The compound shall not be
used as habitable space.
SECTION 11.0 VISIBILLIY
A. New towers shall be configured and located in a manner that shall minimize adverse effects
including visual impacts on the landscape and adjacent properties.
B. New freestanding towers shall be designed to match adjacent structures and landscapes with
specific design considerations such as architectural designs, height, scale, color, and texture.
C. A balloon test shall be required subsequent to the receipt of the photo simulations in order
to demonstrate the proposed height of the tower. The applicant shall arrange to raise a
colored balloon no less than three (3) feet in diameter at the maximum height of the
proposed tower, and within fifty (50) horizontal feet of the center of the proposed tower.
D. The applicant shall meet the following for the required balloon test:
1. Applicant must inform the Planning Department and abutting property owners in
writing of the date and times, including alternative date and times, of the test at least
fourteen (14) days in advance.
2. The date, time, and location, including alternative date, time and location, of the
balloon test shall be advertised in a locally distributed paper by the applicant at least
seven (7) but no more than fourteen (14) days in advance of the test date.
3. The balloon shall be flown for at least four (4) consecutive hours during daylight
hours on the date chosen. The applicant shall record the weather during the balloon
test.
4. Re- advertisement will not be required if inclement weather occurs.
E. New antenna mounts shall be flush- mounted, unless it is demonstrated through RF
propagation analysis that flush - mounted antennas will not meet the network objectives of
the desired coverage area.
F. 'lowers shall be constntcted to accommodate antenna arrays as follows:
1. All freestanding towers up to 120 feet in height shall be engineered and constructed
to accommodate no less than four (4) antenna arrays.
19
2. All towers between 121 feet and 150 feet shall be engineered and constructed to
accommodate no less than five (5) antenna arrays.
3. All towers between 151 feet and taller shall be engineered and constructed to
accommodate no less than six (6) antenna arrays.
G. Grading shall be minimized and limited only to the area necessary for the new tower and
equipment.
H. Freestanding non - concealed tower shall be united to monopole type towers, unless the
applicant demonstrates that such design is not feasible to accommodate the intended uses.
ARTICLE IX. PERMIT (LEVEL IV) BROADCAST FACILITIES
SECTION 1.0 APPLICATION REQUIREMENTS
All new broadcast towers shall meet the following requirements:
A. Completion of the "Communications Tower Ordinance of Harnett County, North Carolina
Application Permit"
B. Application Fee
C. Site Plan (see also `Application Requirements')
SECTION 2.0 DETERMINATION OF NEED
No new broadcast facilities shall be permitted unless the applicant demonstrates that no existing broadcast
tower can accommodate the applicant's proposed use.
SECTION 3.0 HEIGHT
Height for broadcast facilities shall be evaluated on a case by case basis. The determination of height
contained in the applicant's FCC Form 351/352 Construction Permit or application for Construction Permit
and an FAA Determination of No Hazard (FAA Form 7460/2) shall be considered prima facie evidence of
the tower height required for such broadcast facilities.
SECTION 4.0 SETBAChS
New broadcast facilities and anchors shall be subject to the setbacks described below:
A. Minimum of 500 feet from any single - family dwelling unit on same lot
B. Minimum of one (1) foot for every one (1) feet of tower height from all adjacent lots of
record.
SECTION 5.0 EQUIPMENT CABINETS
Except for AM broadcast facilities, cabinets shall not be visible from pedestrian and right -of -way views.
SECTION 6.0 FENCING
All broadcast facility towers, AM antenna(s) towers, and guy anchors shall each be surrounded with
an anti - climbing fence compliant with applicable FCC regulations.
FTE
SECTION 7.0 BUFFER
Except for AM broadcast facilities, it is the intent that all pedestrian views from public rights -of -way and
adjacent residential land uses be screened from proposed broadcast facilities using existing vegetation or be
landscaped with a minimum ten (10) foot wide perimeter buffer containing the following planting standards:
A. All plants and trees shall be indigenous to this part of North Carolina.
B. Existing trees and shrubs on the site should be preserved and may be used in lieu of required
landscaping where approved by the Planning Department.
C. One (1) row of evergreen trees with a minimum two (2) inches caliper, twenty -Five (25) foot
on center.
D. Evergreen shrubs capable of creating a continuous hedge and obtaining a height of at least
five (5) feet shall be planted, minimum three (3) gallon or twenty -four (24) inches tall at the
time of planting, five (5) foot on center.
E. Alternative landscaping plans which provide for the same average canopy and understory
trees but propose alternative locating on the entire subject property may be considered and
approved by the Planning Department, provided the proposed alternative maximizes
screening as provided above, and is otherwise consistent with the requirements of this
section.
SECTION 8.0 SIGNAGE
Commercial messages shall not be displayed on any tower. Required noncommercial signage shall be subject
to the following:
A. The only signage that is permitted upon a tower, equipment cabinets, or fence shall be
informational, and for the purpose of identifying the tower (such as ASR registration
number), as well as the party responsible for the operation and maintenance of the facility,
and any additional security and /or safety signs as applicable.
B. If more than 220 voltage is necessary for the operation of the facility and is present in a
ground grid or in the tower, signs located every twenty- (20) feet and attached to the fence or
wall shall display in large, bold, high contrast letters, minimum height of each letter four (4)
inches, the following: "HIGH VOLTAGE - DANGER."
C. Name plate signage shall be provided, in an easily visible location, including the address and
telephone number of the contact to reach in the event of an emergency or equipment
malfunction, including property manager signs as applicable.
SECTION 9.0 LIGHTING
Lighting on towers shall not exceed the Federal Aviation Administration (FAA) minimum standards. All
other lighting shall be subject to the following.
A. Any lighting requited by the FAA must be of the minimum intensity and number of flashes
per minute (i.e., the longest duration between flashes) allowable by the FAA. Dual lighting
standards are required and strobe Light standards are prohibited unless required by the FAA.
B. Lights shall be oriented so as not to project directly onto surrounding property, consistent
with FAA requirements.
C. Any security lighting for on- ground facilities and equipment shall be in compliance with dark
sky lighting standards as approved by the County.
21
SECTION 10 .0 EQUIPMENT COMPOUND
The fenced in compounds shall not be used for the storage of any excess equipment or hazardous materials.
No outdoor storage yards shall be allowed in a tower equipment compound. The compound shall not be used
as habitable space.
SECTION 11.0 VISIBILITY
Grading shall be minimized and limited only to the area necessary for the new tower and equipment.
ARTICLE X. APPLICATION REQUIREMENTS
SECTION 1.0 REQUIREMENTS FOR CO- LOCATION AND ATTACHMENT
A. A signed statement from the tower owner or owner's agent agreeing to allow the co- location
of other wireless equipment on the proposed tower, if the structure is designed or capable of
additional wireless equipment.
B. Compliance with American National Standards Institute (ANSI) standards for
electromagnetic radiation: Tn order to protect the public from excessive exposure to
electromagnetic radiation, the facility, applicant shall certify through a written statement that
the facility meets or exceeds current ANSI standards as adopted by the FCC.
C. Certification furnished by a registered professional engineer licensed in the State of North
Carolina that the structure has sufficient structural integrity to support the proposed antenna
and feed lines in addition to all other equipment located or mounted on the structure.
D. One (1) original and two (2) copies of a survey of the property completed by a registered
professional engineer, licensed in the State of North Carolina showing all existing uses,
structures, and improvements.
E. Any applicant for facilities under this section shall certify that such proposed facility shall
comply with all applicable federal regulations regarding interference protection, including but
not limited to federal regulations regarding adjacent channel receiver (blanket) overload and
intermodulation distortion.
F. Streamlined process for co- location approvals are subject to the following:
1. A co-location application entitled to streamlined processing shall be reviewed by the
County within forty -five (45) days of submission, (or within some other mutually
agreed upon timeframe). Approval or denial of the application shall be in writing
and shall be postmarked to the applicant by the forty -fifth (45) day from the date of
receipt. Denials shall identify the deficiencies in the application which, if cured,
would take the application complete.
2. Upon resubmitting of the revised site plan and paperwork the County shall follow
the process identified in this section, above, until all deficiencies identified are
deemed cured.
3. If the County does not respond in writing to the applicant within the specified
timeframe detailed above, then the application shall be deemed approved.
4. Application entitled to the streamlined review process shall not be subject to design
or placement requirement, or public hearing review.
22
SECTION 2.0 REQUIREMENTS FOR MITIGATION & NEW LEVEL II & III TOWERS
A. A report and supporting technical data shall be submitted, demonstrating the following.
1. All antenna attachments and co- locations, including all potentially useable cross
country utility distribution towers and other elevated structures within the proposed
service area and alternative antenna configurations have been examined, and found
unacceptable.
2. Reasoning as to why existing Facilities such as cross country utility distribution and
other elevated structures are not acceptable alternatives to a new freestanding tower.
3. Reasoning as to why the adequacy of alternative existing facilities or the mitigation
of existing facilities are not acceptable in meeting the applicant's need or the needs
of service providers, indicating that no existing communications facility could
accommodate the applicant's proposed facility shall consist of any of the following.
a. No existing towers located within the geographic area meet the applicant's
engineering requirements, and why.
b. Existing towers are not of sufficient height to meet the applicant's
engineering requirements, and cannot be mitigated to increase in height.
c. Existing towers do not have sufficient structural integrity to support the
applicant's proposed wireless communications facilities and related
equipment, and the existing facility cannot be sufficiently improved.
d. Other limiting factors that render existing wireless communications facilities
[unsuitable.
B. Technical data included in the report shall include certification by a registered professional
engineer licensed in the State of North Carolina or other qualified professional, which
qualifications shall be included, regarding service gaps or service expansions that are
addressed by the proposed tower, and accompanying maps and calculations demonstrating
the need for the proposed tower.
C. Proof that a property and /or tower owner's agent has appropriate authorization to act upon
the owner's behalf (if applicable).
D. Signed statement from a qualified person, together with their qualifications, shall be included
that warrants radio frequency emissions from the antenna army(s) comply with FCC
standards. The statement shall also certify that both individually and cumulatively, and with
any other facilities located on or immediately adjacent to the proposed facility, the
replacement antenna complies with FCC standards.
E. A stamped or sealed structural analysis of the proposed tower prepared by a registered
professional engineer licensed by the State of North Carolina indicating the proposed and
future loading capacity of the tower is compliant with EIA /TIA -222 -G (as amended).
F. An affidavit by a radio frequency engineer demonstrating compliance with `Locating
Alternatives Order' section of this Ordinance. If a lower ranking alternative is proposed the
affidavit must address why higher ranked options are not technically feasible, practical,
and /or justified given the location of the proposed conummications facility.
G. Statement as to the potential visual and aesthetic impacts of the proposed tower and
equipment on all adjacent residential zoning districts.
H. Written statement by a registered professional engineer licensed by the State of North
Carolina specifying the design structural failure modes of the proposed facility.
I. Statement certifying that no unusual sound emissions such as alarms, bells, buzzers, or the
23
like are permitted. Emergency Generators are permitted. Sound levels shall not exceed
seventy decibels (70 db).
J. A map showing the designated search ring.
K. Materials detailing the locations of existing wireless communications facilities to which the
proposed antenna will be a handoff candidate; including latitude, longitude, and power levels
of the proposed and existing antenna is required.
L. A radio frequency propagation plot indicating the coverage of existing wireless
communications sites, coverage prediction, and design radius, together with a certification
from the applicant's radio frequency (111� engineer that the proposed facility's coverage or
capacity, potential cannot be achieved by any higher ranked alternative such as a concealed
facility, attached facility, replacement facility, co- location, or new tower.
1. 'These documents are needed to justify a facility and to determine if the proposed
location is the best suitable land use in the designated geographic area of the
Proposed facility.
M. One (1) original and two (2) copies of a survey of the property completed by a registered
professional engineer, licensed in the State of North Carolina showing all existing uses,
structures, and improvements.
N. Six (6) sets (24 "x36' of signed and scaled site plans shall include the following:
1. Name of project and date
2. Deed Book, and Page and Map Book and Page Reference
3. Scale, north arrow, and vicinity map
4. Subject property information including zoning, watershed classification, percent
coverage of lot to be impervious surface (if located in a designated watershed area)
5. Adjacent property information, including land owners, land uses, height of principal
building, size of lots, zoning, and land use designation.
6. 'Power elevations
7. Landscape buffering plans
8. Maximum height of the proposed tower and proposed and future mounting
elevations of future antenna, including individual measurement of the base, the
tower, and lightning rod
9. One (1) parking space is required for each tower development area. The space shall
be provided within the leased area, or equipment compound, or the development
area as defined on the site plan.
10. Location, classification, and size of all major public or private streets and rights -of-
way
11. Identify adjacent features within 500 feet of property boundary including driveways,
Public parking areas, pedestrian ways, trails, and any other pertinent features
12. Two (2) reduced copies (81/2"x I I "), of the foregoing preliminary grading plans may
be included on site plans or separately submitted in equal quantities.
O. Title report or American Land Title Association (A.LT.A.) survey showing all casements on
the subject proper[}, together with a full legal description of the property.
P. List of adjacent property owners and keyed to the map. The list must be from the most
24
current ownership information supplied by the Harnett County Tax Department, together
with two (2) sets of mailing labels for such property owners. Applicant will also provide a
notarized Certification Letter stating the ownership list referenced herein is accurate to the
best of the applicant's ability.
Q. Simulated photographic evidence of the proposed tower and antenna appearance from any
and all residential areas within 1,500 feet and vantage points approved by the planning
Department including the facility types the applicant has considered and the impact on
adjacent properties including:
1. Overall height
2. Configuration
3. physical location
4. Mass and scale
5. Materials and color
6. Illumination
7. Architectural design
R. All other documentation, evidence, or materials necessary to demonstrate compliance with
the applicable approval criteria set forth in this Ordinance
S. A pre - application conference will be required for any new tower. 'rhe applicant shall
demonstrate that the following notice was mailed (via certified mail) to all other wireless
service providers licensed to provide service within the County as indicated on the list of
wireless service providers provided by the County:
"pursuant to the requirements of the Harnett County Zoning Ordmance, Article 9
is hereby providing you with notice of our intent to meet with the County Staff in a
pre - application conference to discuss the location of a free - standing wireless
communications facility that would be located at (physical address, latitude
and longitude (NAD -83)). In general, we plan to construct a tower of feet in
height for the purpose of providing (type of wireless service)
Please inform the County Staff if you have any desire for placing additional wireless
facilities or equipment within 2 rules of our proposed tower. please provide us with
this information within twenty business days after the date of this letter. Your
cooperation is sincerely appreciated.
Sincerely, (pre - application applicant, wireless provider)"
T. prior to issuance of a building permit, proof of FAA compliance with Subpart C of the
Federal Aviation Regulations, Part 77, and "Objects Affecting Navigable Airspace," if
applicable.
SECTION 3.0 REQUIREMENTS FOR NEW LIVEI. IV TOWERS
A. 'Technical data included in the report shall include the purpose of the proposed facility as
described in the FCC Construction permit Application.
B. Proof that a property and /or tower owners agent has appropriate authorization to act upon
the owner's behalf, if applicable.
C. Signed statement from a qualified person, together with their qualifications, shall be included
that warrants radio frequency emissions from the antenna array(s) comply with FCC
25
standards regarding interference to other radio services. The statement shall also certify that
both individually and cumulatively, and with any other facilities located on or immediately
adjacent to the proposed facility, the replacement antenna complies with FCC standards
regarding human exposure to RF energy.
D. A stamped or sealed structural analysis of the proposed tower prepared by a registered
professional engineer licensed by the State of {North Carolina) indicating the proposed and
future loading capacity of the tower is compliant with GIA /TlA -222 -G (as amended.
13. A written statement by a registered professional engineer licensed by the State of North
Carolina specifying the design structural failure modes of the proposed facility.
F. Statement certifying that no unusual sound emissions such as alarms, bells, buzzers, or the
like are permitted. Hmergency Generators are permitted. Sound levels shall not exceed
seventy decibels (70 db).
G. One (I) original and two (2) copies of a survey of the property completed by a registered
professional engineer, licensed in the State of North Carolina showing all existing uses,
structures, and improvements.
1-1. Six (6) sets (24 "x36 of signed and sealed site plans shall include the following:
1. Name of project and date
2. Deed Book, and Page and Map Book and Page Reference
3. Scale, north arrow, and vicinity map
4. Subject property information including zoning, watershed classification, percent
coverage of lot to be impervious surface (if located in a designated watershed area)
5. Adjacent property information including land owners, land uses, height of principal
building, size of lots, and existing zoning and land use
6. Landscape buffering plans
7. Maximum height of the proposed tower and /or antenna, including individual
measurements of the base, tower, and lightning rod
8. One (1) parking space is required for each tower development area. The space shall
be provided within the leased area, or equipment compound, or the development
area as defined on the site plan.
9. Location, classification, and size of all major public or private streets and rights -of-
way,
10. Identify adjacent features within 500 feet of property boundary including driveways,
public parking areas, pedestrian ways, trails, and any other pertinent features
I1. Two (2) reduced copies (81A "x11 "), of the foregoing preliminary grading plans may
be included on site plans or separately submitted in equal quantities. The site plans
shall
12. Structure elevations
1. Title report or American Land Title Association (A.I, T.A.) survey showing all easements on
the subject property, together with a full legal description of the property.
J. List of property owners within 1,000 feet in residential zoning districts and 500 feet in all
other zoning districts and keyed to the map. The fist must be from the most current
ownership information supplied by the I larnett County Tax Department, together with two
(2) sets of mailing labels for such property owners. Applicant will also provide a notarized
Certification Letter staring the ownership list referenced herein is accurate to the best of the
applicant's ability.
K. A pre- application conference will be required for any new broadcast facility.
L. Prior to issuance of a building permit, proof of FAA compliance with Subpart C of the
Federal Aviation Regulations, Part 77, and "Objects Affecting Navigable Airspace," if
applicable.
26
ARTICLE XI. REVIEW & DECISION MAKING BODIES
SECTION LO ESTABLISHMENT OF THE BOARD OF ADJUSTMENT
There Harnett County Board of Adjustment shall serve as review and decision making body.
1.1 Rules of Conduct for Members
The Board of Adjustment shall operate consistent with the adopted By -Laws for the Harnett County
Board of Adjustment.
1.2 Powers and Duties of the Board of Adjustment
The Board of Adjustment shall have the following powers and duties:
A. Administrative Review- To hear and decide appeals where it is alleged there is error in any order,
requirement, decision, or determination made by the Lotting Administrator in the enforcement
of this Ordinance.
B. Variances - The Board of Adjustment shall have the power to authorize, in specific cases, minor
variances from the terms of this Ordinance as will not be contrary to the public interests where,
owing to special condition, a literal interpretation of this Ordinance will result in practical
difficulties or unnecessary hardship, so that the spirit of this Ordinance shall be observed, public
safety and welfare secured, and substantial justice done. Such variances may be granted in such
individual case of unnecessary hardships only upon findings of the Board of Adjustment after a
public hearing that the following conditions exist:
L There are extraordinary and exceptional conditions pertaining to the particular piece
of property in question because of its size, shape, or topography that arc not
applicable to other lands or structures.
2. Granting the variance requested will not confer upon the applicant any special
privileges that are denied to other residents of the district in which the property is
located.
3. A literal interpretation of the provisions of this Ordinance would deprive the
applicant of rights commonly enjoyed by other residents of the district in which the
property is located.
4. The requested variance will be in harmony with the purpose and intent of this
Ordinance and will not be injurious to the neighborhood or to the general welfare.
5. The special circumstances are not the result of the actions of the applicant.
6. The variance requested is the minimum variance that will make possible the legal
use of the land, building or structure.
ARTICLE XII. CHANGES & AMENDMENTS
SECTION 1.0 AMENDMEN'T'S
The Harnett County- Board of Commissioners may from time -to -time amend the terms of this Ordinance
(but no amendment shall become effective unless it shall have been proposed by or shall have been submitted
to the Planning Board for review and recommendation.) If the Planning Board fails to submit a report within
27
thirty (30) clays of the public hearing by the Harnett County Board of Commissioners, the proposed
amendment shall be deemed to have recommended approval by the Planting Board.
No amendment shall be adopted by the governing body until thcv have held a public hearing on the
amendment. Notice of the hearing shall be published in a newspaper of general circulation in Harnett County
at least once a week for two (2) successive weeks prior to the hearing, the first publication being not less than
ten (10) days nor more than twenty -five (25) days before the date of the hearing. In computing the ten (10)
day, twenty -Five (25) day period, the date of publication is not to be counted, but the date of the hearing is to
be counted.
ARTICLE XIII. ADMINISTRATION, ENFORCEMENT, & PENALTIES
SECTION 1.0 ADNIINISTR\TION
This Ordinance shall be administered and enforced by the Zoning Administrator of Barnett County or
designee The County may, through contract, secure the professional services of telecommunications
consultants to assist Counry staff in the implementation of this Ordinance. Such professional, services
include, but are not limited to, review and evaluation of permit applications, determination of compliance
with existing and proposed Federal regulations, minimization of the aesthetic impact, review of the technical
data and expert testimony as needed.
SECTION 2.0 ENFORCENIEN'f
If the Ordinance Administrator shall find that any of the provisions of this Ordinance are being violated, it
shall notify in writing the person responsible for the violation, specifying the nature of the violation and what
corrective measures must be taken. The Ordinance Administrator shall order discontinuance of illegal use of
land, buildings, or structures; removal of illegal buildings or structures or of additions, alterations, or
structural changes thereto; discontinuance of any illegal work being clone; or shall take any other action
authorized by law to insure compliance %vith or to prevent violation of the provisions of this Ordinance.
SEC'T'ION 3.0 PENAL:1'II S
Any person failing to take corrective action within a reasonable time after receiving written notice from the
Planning Department and any person operating a Communications 'Power without a valid permit shall be
guilty of a misdemeanor and may be punished by a fine not to exceed five - hundred dollars ($500.00) or
imprisonment not to exceed thirty (30) days. Each day such violation shall be permitted to exist shall
constitute a separate offense.
SEC'T'ION 4.0 LIES
The Harnett County Board of Commissioners shall set a fee, payable to the Harnett County Planning
Department, to cover the necessary processing cost of all Communications Tower Permits. The set fee shall
be posted in the Planning Department.
4.1 Variances or Appeals
The County Board of Commissioners shall set a fee, payable to Harnett County, North Carolina, to
cover the necessary administrative costs and advertising of each application for a variance or appeal.
all
The set fee shall be posted in the County's Planning Department office.
4.2 Supplemental Review
The County reserves the right to require a Supplemental review for any Permit (Level I, Il, 1If, or IV)
subject to the following:
A. Where due to the complexity of the methodology or analysis required to review an application
For a Permit (Level I, 11, 111 or IV) facility, the County- may require the applicant to pay for a
technical review by a third party expert, the costs of which shall be borne by the applicant and be
in addition to other applicable fees. Schedules of current fees are listed in the Harnett County
1'ce Schedule.
B. Based on the results of the expert review, the approving authority may require changes to the
applicant's application or submittals.
C. The supplemental review maV address any or all of the following:
1. The accurary, and completeness of the application and any accompanying
documentation.
2. The applicability of analysis techniques and methodologies.
3. The validir♦ of conclusions reached.
4. \X7hether the proposed communications facility complies with the applicable
approval criteria set forth in these codes.
5. Other items deemed by the County to be relevant to determining whether a
proposed communications facility complies with the provisions of these codes.
SECTION 5.0 APPI3AL
Appeals from the enforcement and interpretation of this Ordinance and requests for variances shall be filed
with the Ordinance Administrator specifying the grounds thereof. The Ordinance Administrator shall
transmit to the Board of Adjustment all applications and records pertaining to such appeals and variances.
The Board shall fix a thirty (30) day period for the hearing of appeals, giving notice to all participants by first
class mail. An appeal stays all proceedings in furtherance of the action appealed from unless the Ordinance
Administrator certifies to the Board that by reason of facts stated in the record a stay would, in his opinion,
cause eminent peril to life and or property. In such a case proceedings shall not be stayed other than by an
order from the Hamett County Superior Court.
ARTICLE XIV. INTERPRETATION OF CERTAIN TERMS & DEFINITIONS
SECTION 1.0 INTERPRETATION
The following assumptions shall be made:
A. Words used in the present tense include the future tense.
B. Words used in the singular number include the plural, and words used in the plural number
include the singular.
C. The word "shall" is always mandatory, and not merely directory.
D. The word "may" is permissive.
E. The words "used" or "occupied" include the words intended, designed, or arranged to be used or
29
occupied.
SECTION 2.0 D13FINI'TIONS
Alternative Structure- A structure that is not primarily constructed for the purpose of holding antennas but
on which one (1) or more antennas may be mounted, including buildings, water tanks, pole signs, billboards,
church steeples, and electric power transmission towers.
Amateur Radio "Power- Any tower used for amateur radio transmissions consistent with the "Complete FCC
US. Amateur Part 97 Rules and Regulations" for amateur radio towers.
Ancillary Structure- For the purposes of this Ordinance, any form of development associated with a
communications facility, including foundations, concrete slabs on grade, guy anchors, generators, and
transmission cable supports, but excluding equipment cabinets.
Anti- Climbing Device - A piece or pieces of equipment, which are either attached to a tower, or which are
freestanding and are designed to prevent people from climbing the structure, including tine mesh wrap
around structure legs, "squirrel- cones," and other approved devices, but excluding the use of barbed or razor
wire.
Antenna - Any apparatus designed for the transmitting and /or receiving of electromagnetic waves, including
telephonic, radio or television communications. Types of elements include omni- directional (whip) antennas,
sectionalized (panel) antennas, multi or single bay (FAI &'IA' , yagi, or parabolic (dish) antennas.
Antenna Array- A single or group of antenna elements and associated mounting hardware, transmission lines,
or other appurtenances which share a common attachment device such as a mounting frame or mounting
support structure for the sole purpose of transmitting or receiving electromagnetic waves.
Antenna Element- Any antenna or antenna array.
ASR -'Phe Antenna Structure Registration Number as required by the FAA and FCC.
Base Station - The electronic equipment utilized by the wireless providers for the transmission and reception
of radio signals.
Board of Adjustment - The Board of Adjustment of I larnett County as defined by the Harnett County
Zoning Ordinance.
Breakpoint Technolog- The engineering design of a monopole wherein a specified point on the monopole is
designed to have stresses concentrated so that the point is at least five percent (5 /,,) more susceptible to
failure than any other point along the monopole so that in the event of a structural failure of the monopole,
the failure will occur at the breakpoint rather than at the base plate, anchor bolts, or any other point on the
monopole.
Broadcast Facilities- 'Towers, antennas, and /or antenna arrays for ANl /FNl /'PV /l -IDTV broadcasting
transmission facilities that are licensed by the Federal Communications Commission.
Co- location - The practice of installing and operating multiple wireless carriers, service providers, and /or radio
common carrier licensees on the same tower or attached communication facility using different and separate
antenna, feed fines, and radio frequency generating equipment.
30
Combined Antenna — An antenna or an antenna array designed and utilized to provide services for more than
one (1) wireless provider, or a single wireless provider utilizing more than one (1) frequency band or
spectrum, for the same or similar type of services.
Concealed- A tower, ancillary structure, or equipment compound that is not readily identifiable as such, and is
designed to be aesthetically compatible with existing and proposed building(s) and uses on a site.
There are two (2) types of concealed facilities: 1) Antenna Attachments, including painted antenna
and feed lines to match the color of a building or structure, faux hvindows, dormers or other
architectural features that blend xvith an existing or proposed building or structure and 2)
Freestanding. Freestanding concealed tower's usually have a secondary, obvious function which may
include church steeple, windmill, bell tower, clock tower, light standard, flagpole with or without a
flag, or tree.
Development Area- The area occupied by a communications facility including areas inside or under an
antenna - support structure's framework, equipment cabinets, ancillary structures, and /or access ways.
Discontinued- Any tower without any mounted transmitting and /or receiving antennas in continued use for a
period of 180 consecutive days.
Equipment Compound- The fenced -in area surrounding the ground -based wireless communication facility
including the areas inside or under a tower's framework and ancillary structures such as equipment necessary
to operate the antenna on the structure that is above the base flood elevation uhcluding cabinets, shelters,
pedestals, and other similar structures.
Equipment Cabinet- Any structure above the base flood elevation including cabinets, shelters, pedestals, and
other similar structures and used exclusively to contain radio or other equipment necessary for the
transmission or reception of wireless communication signals.
FAA - The Federal Aviation Administration
FCC- The Federal Communications Comnussion
Feed Lines- Cables used as the interconnecting media between the transmission /receiving base station and
the antenna.
Flush- Mounted - Any antenna or antenna array attached directly to the face of the support structure or
building such that no portion of the antenna extends above the height of the support structure or building.
A -Here a maximum flush- mounting distance is given, that distance shall be measured from the outside edge of
the support structure or building to the inside edge of the antenna.
Guyed Structure - (see Tower)
Geographic Search Rine- An area designated by a wireless provider or operator for a new base station,
produced in accordance with generally accepted principles of wireless engineering.
Flandoff Candidate - A wireless communication facility that receives call transference from another wireless
facility, usually located in an adjacent first "tier" surrounding the initial wireless facility.
Lattice Structure- (see Tower)
Least Visually Obtrusive Profile - The design of a wireless communication facility intended to present a visual
31
profile that is the minimum profile necessary for the facility to properly function
Nfitigation- A modification of an existing tower to increase the height, or to improve its integrity, by replacing
or removing one (1) or several tower(s) located in proximity to a proposed new tower in order to encourage
compliance with this Ordinance, or improve aesthetics or functionality of the overall wireless network.
Monopole Structure- (see Tower)
Non - concealed- A wireless communication facihq• that is readily identifiable as such and can be either
freestanding or attached.
Personal Wireless Service- Commercial mobile services, unlicensed wireless services, and common carrier
wireless exchange access services as defined in the Tele�ommunitalions ild of 1996.
public Safety Communications Ec ui lment- All communications equipment utilized by a public entity for the
purpose of ensuring the safety of the citizens of the County and operating within the frequency range of 700
MI-Iz and 1,000 %fHz and any future spectrum allocations at the direction of the FCC.
Radio Frequency Emissions- Any electromagnetic radiation or other communications signal emitted from an
antenna or antenna- related equipment on the ground, tower, building, or other vertical projection.
Radio Frequency Propagation .Analysis- Computer modeling to show the level of signal saturation in a given
geographical area.
Replacement- (see Mitigation)
Satellite Garth Station - A single or group of parabolic or dish antennas mounted to a support device that may
be a pole or truss assembly attached to a foundation in the ground, or in some other configuration, including
the associated separate equipment cabinets necessary for the transmission or reception of wireless
communications signals with satellites.
Streamlined Processine- F.xpedited review process for co- locations.
Structure- Anything constructed or erected, the use of which required permanent location on the ground, or
attachment to something having a permanent location on the ground, including advertising signs.
Tower- Anv staffed or unstaffed location for the transmission and /or reception of radio frequency signals or
other wireless communications, and usually consisting of an antenna or group of antennas, transmission
cables, equipment cabinets, and may include a tower. The following developments shall be deemed a
communications facility: new, mitigated, or existing towers, pubhc towers, replacement towers, co-location on
existing towers, attached wireless communications facilities, concealed wireless communication facilities, and
non - concealed wireless communication facilities. "Powers do not include any device used to attach antennas to
an existing building, unless the device extends above the highest point of the building by more than twenty
(20) feet. Types of support structures include the following:
Guyed Tower- A style of tower consisting of a single truss assembly composed of sections with
bracing incorporated. The sections are attached to each other, and the assembly is attached to a
foundation and supported by a series of wires that are connected to anchors placed in the ground or
on a building.
Lattice Structure- A tapered style of tower that consists of vertical and horizontal supports with
32
multiple legs and cross bracing, and metal crossed strips or bars to support antennas.
Monopole Structure- A stele of freestanding tower consisting of a single shaft usually composed of
two (2) or more hollow sections that are in turn attached to a foundation. 'Plus type of tower is
designed to support itself without the use of g ty wires or other stabilization devices. These facilities
are mounted to a foundation that rests on or in the ground or on a building's roof. All feed lines
shall be installed within the shaft of the structure.
Tower Base - the foundation, usually concrete, on which the tower and other support equipment are situated.
For measurement calculations, the tower base is that point on the foundation reached by dropping a
perpendicular from the geometric center of the tower.
Tower Height- The vertical distance measured from the grade line to the highest point of the tower,
including any antenna, lighting or other equipment affixed thereto.
'tower Site - The land area that contains, or will contain, a proposed tower, support structures and other
related buildings and improvements.
Variance - A modification of the terms of this Ordinance where a literal enforcement of this Ordinance would
result in an unnecessary hardship and shall be reviewed and issued by the Board of Adjustment.
Duly adopted this day of
Harnett County Board of Commissioners
Chairman
Attest:
Clerk to the Board
33
1Z
Board Meeting
Agenda Item
MEETING DATE: March 17, 2008
TO: HARNETT COUNTY BOARD OF COMMISSIONERS
SUBJECT: Proposed Ordinance Rewrite - "Communication Tower Ordinance"
REQUESTED BY: Joseph Jeffries, Planning Director
REQUEST:
Public Hearing: Proposed Rewrite of the Communication Tower Ordinance
Applicant: Harnett County Planning Dept.
The existing Communication Tower Ordinance is proposed to be replaced with a newly
revised Ordinance prepared by CityScape Consultants, Inc. in order to bring current standards
into compliance.
A public hearing was held by the Planning Board on Monday, March 3, 2008. The Planning
Board recommends approval of the proposed ordinance rewrite with a unanimous
vote.
COUNTY MANAGER'S RECOMMENDATION:
UAWord \CCO \agenda MAR 08 Rewrite Cell Tower Ord.doc Page
I of 1