Loading...
HomeMy WebLinkAboutPU-SR-01 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Currin Plantation - Preliminary Plat Plan Property Description PIN(s): 0527-47-9403.000 Acreage: 31.40 acres Address/SR No.: Clark Road (SR 1129) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Clark Road (SR 1129) Nearest water line size: 4" Fire flow is not available for this development Lines permitted under DENR Permit: (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size: Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: february 4, 2009 VOTE: Conditionally Approve CONDITIONS: SHORT TERM: The existing easement to the Womble property must be maintained and clearly depicted in the  utility plans by the Professional Engineer (P.E.) The Harnett County Fire Marshal must provide a written variance to the fire hydrant  requirements for major subdivisions and the developer must provide a copy of said variance to Harnett County Department of Public Utilities to approve the propsed utility plans. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  Page 1 of 2 PUBLIC UTILITIES STAFF REPORT The propsed utility plans must include RPZ's for backflow protection on the water supply lines  to the fire sprinkler systems. The developer must follow the approved process for the approval of the proposed water main  that will serve this subdivision. The developer must provide HCDPU with a one (1) year warranty on the proposed water  system improvements once approved by DEH and accepted by HCDPU. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT