HomeMy WebLinkAboutDECISION PACKETT Phase A 1A #3
DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: GATE @ LEXINGTON PHASE A-PART1A
Development Type: Major Subdivision Final Plan/Plat
Date: FEBRUARY 4, 2009
The above referenced application
is CONDITIONALLY APPROVED as listed below.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Fire Marshal (910)893-7580:
Approve:
Will review and confirm layout of streets when wetland issues
E911/Addressing (910)814-2038:
resolved.
Conditionally Approve:
Vicinity map: Delete SR 1293,1114, 1155. SR 1114 should
be 1115
If street design is altered due to no being allowed a wetlands
Planning Department (910)893-7525:
crossing, Prelim and Final will have to come back to DRB for
Conditionally Approve:
revision approval.
Submit official cost estimate and bond.
Edge of Pavement is not extended enough to provide
adequate lot frontage on lots 230 & 231…corner lots.
The Harnett County Fire Marshal must approve the fire
Public Utilities (910)893-7575:
hydrant layout before the utility plans can be approved by
Hold:
HCDPU.
The water and sewer improvements must be permitted with
NCDENR and approved by HCDPU and NCDENR before these
systems can be installed, certified, approved and placed into
operation. The P.E. must submit utility plans, an engineer's
report, project specifications along with the water and sewer
permit applications for review and subsequent approval by
HCDPU.
HCDPU must complete the final inspection of the water and
sewer system improvements before the final plat may be
released for recording.
Final Plat must be on hold until the following items have been
received by HCDPU:
A.The As-Built Record Drawings in three formats (digital,
mylar and bond);
B.The P.E. certifications for the water and sewer system
improvements and
C.The cost statement for the water and sewer system
improvements.
Provide HCDPU with an updated Master Development Plan to
show all proposed roads, streets, phases, phase lines and
proposed lots with lot numbers in each phase.
The Harnett County Fire Marshal must approve the fire
hydrant layout before the utility plans can be approved by
DECISION PACKETT Phase A 1A #3
4/6/2009
1
HCDPU.
A draw down test must be completed on the sewer lift station
with satisfactory results using power fed from the power
company and from the emergency generator.
Environmental Health (910)893-7547:
Approve:
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
Public Utilities (910)893-7575: The developer must provide HCDPU with a one (1) year
warranty on the water and sewer system improvements
installed to served this subdivision.
:
:
:
:
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2)
business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all
items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait,
as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the
meeting the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with
Planning Staff to discuss other potential options.
DECISION PACKETT Phase A 1A #3
4/6/2009
2