Loading...
HomeMy WebLinkAboutGATE@LEXINGTON Phase A 1A DECISION PACKET DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: GATE @LEXINGTON PHASE A PART1A PHASE A Development Type: Major Subdivision Final Plan/Plat Date: NOVEMBER 5, 2008 The above referenced application shall be HELD for further revision and review. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. Fire Marshal (910)893-7580: Install temporary turn arounds at end of Regimental Dr, end of Marquis : Conditionally Approve Dr, end of Centennial Pkwy. Crutchfield Drive shall either be connected to Richmond Park or have a temporary turn around installed. Street labeled "Proposed St" requires a street name. E911/Addressing (910)814-2038: Conditionally Approve: Review will be completed when update Prelim/Overall Plan is received. Some streets are longer than the max 2,500’.  Planning Department (910)893-7525: A 2nd driveway is required when 200 lots are exceeded.  : Hold Centennial Pkwy should be completed, or bonded (complete w/ detailed estimate) to alleviate this issue. Stabilize entire site.  Will the drainage pipe behind lots 117&118 be in an open  ditch? If so, ditch should be adequately stabilized and reinforced…rip-rap, etc. Lots 115,116,117,118 and 128 encroach into wetlands.  Please show entire bldg envelope to ensure that these are buildable lots and to ensure the structure will not encroach into the wetland. Show entire bldge envelope for lot 91  Edge of Pavement is not extended enough to provide  adequate lot frontage on lots 230 & 231…corner lots. Install street lights or provide letter from the contractor  stating street lights will be installed. Please provide a Master Plan showing all recorded phases and  all future developed areas. This master plan should also include the amount of open space based on total project acres, as per initial PB approval. Ensure that lots shown to be previously recorded maps match  correctly… ***Map #2008-206 was not titled "The Gate Phase A, Part 2" when it was approved & recorded. HCDPU must complete the final inspection of the water and  Public Utilities (910)893-7575: sewer system improvements before the final plat may be Hold: released for recording. Final Plat must be on hold until the following items have been  received by HCDPU: GATE@LEXINGTON Phase A 1A DECISION PACKET 4/6/2009 1 A. The As-Built Record Drawings in three formats  (digital, mylar and bond); B. The P.E. certifications for the water snd sewer  system improvements and C. The cost statement for the water and sewer  system improvements. Provide HCDPU with an updated Master Development Plan to  show all proposed roads, streets, phases, phase lines and proposed lots with lot numbers in each phase. The Harnett County Fire Marshal must approve the fire  hydrant layout before the utility plans can be approved by HCDPU. Environmental Health (910)893-7547: None Approve: LONG RANGE CONDITIONS The following conditions must be satisfied Must meet all requirements set forth by NC DENR. Contact at (910)433-3300. Please visit www.harnett.org/utilities for more info.  PU Dept: The water and sewer improvements must be approved by  NCDENR and HCDPU before these systems can be placed into operation. The developer must provide HCDPU with a one (1) year  warranty on the water and sewer system improvements installed to served this subdivision. : : : : Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for compliance. If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. GATE@LEXINGTON Phase A 1A DECISION PACKET 4/6/2009 2