Loading...
HomeMy WebLinkAboutPU-SR-01 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: The Gate at Lexington – Final Property Description PIN(s): 9595-42-8914.000 Acreage: 51.96 acres Address/SR No.: Hwy 87 Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Hwy 87 Nearest water line size: 8” Fire flow is available for this development Lines permitted under DENR Permit: 07-01103 (DEH Serial Number) Sewer Public sewer is available for this development (via Harnett County) Sewer capacity is available for this development Nearest sewer line location (Road name & SR#): Hwy 87 & adjacent property owned by Ft Bragg Nearest sewer line size: 16” Force Main Lines permitted under DENR Permit: WQ0030915 (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: Jan 15, 2008 VOTE: Hold CONDITIONS: SHORT TERM: The Developer must provide HCDPU with a complete Master Development Plan to include all  proposed phases, lots, streets, and utilities. To date, HCDPU has received a partially completed Master development Plan. The water and sewer lines for the Gate at Lexington Part A-1 have not been certified by the PE  and the sewer collection system is not completely constructed, more specifically the sewer lift station must be completed and ready for service before the final plat can be approved. The sewer capacity issue was identified by HCDPU in the very beginning of this project. The  initial agreement between HCDPU and the developer was to allow 200 lots to be built out before the South Harnett Regional Wastewater Treatment Plant (SHRWWTP) was constructed Page 1 of 2 PUBLIC UTILITIES STAFF REPORT and operational. Once the SHRWWTP was operational, then the development could continue with no concern for limited treatment capacity. The county began construction on the SHRWWTP in the last quarter of 2007. It is anticipated that the plant will be completed by the end of 2009. Until then, this development would be restricted to a limited number of lots based upon the availability of treatment capacity at the existing Cooper’s Ranch and Carolina Lakes WWTP’s. The approval of the first 73 lots in the Village of Lexington Part 1 and the 163 lots with the Gate at Lexington Part A-1 would total to 236 lots for this development. The development of this subdivision may continue, but the final plats for subsequent phases would not be approved until the SHRWWTP is operational. The preliminary determination of anticipated sewer treatment capacity is subject to increase if the actual flow at the existing WWTP’s do not exceed the permitted capacity of said WWTP’s. The developer must provide HCDPU with an access road to the sewer lift station. The location  of the sewer lift station appears to be in the next phase of this project and the access road for the sewer lift station must remain passable through construction of the subsequent phases. The developer must provide HCDPU with the cost statements for the water and sewer  improvements that will serve this subdivision. Harnett County Dept of Public Utilities (HCDPU) must be provided a twenty (20’) feet wide  easement for each sewer line that is located outside the street right-of-way. Harnett County Dept of Public Utilities (HCDPU) must be provided a copy of the Nationwide 12  permit issued by the Army Corps of Engineers for the new sewer lines crossing the wetland areas. The PE must provide HCDPU with a set of utility As Built Record Drawings in mylar, digital and  paper copies. The HCDPU Utility Construction Inspector must complete the final inspections for the water and  sewer improvements including the sewer lift station. Water meters cannot be released to this subdivision until Harnett County receives the final  approval from NCDENR and the issue of the meters is subject to the treatment capacity of the WWTP’s as indicated above. HCDPU reserves the right to limit the release of water meters to this development and builders that purchase lots from the developer must be given notice of the limitations placed upon this subdivision prior to the sale of each building lot. The sheet S-4 of the proposed final plat should include a note stating HCDPU reserves the right to limit the release of water meters based upon the actual flow conditions at the existing wastewater treatment plants serving this development. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The developer must provide HCDPU a one (1) year warranty on the water and sewer lines  installed to serve this development. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT