Date: JANUARY 16, 2008
The above referenced application
is CONDITIONALLY APPROVED as listed below.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Lots # 59 thru # 63 on Germantown Rd exceed the coverage
Fire Marshal (910)893-7580:
for the fire hydrants, install fire hydrant on or near lot # 5.
Conditionally Approve:
Fire Hydrant to be installed at the intersection of Trenton
Place and Marquis Dr.
E911/Addressing (910)814-2038: 3 NEW STREETS NAMES ARE REQUIRED FOR THE SOUTHERN
Conditionally Approve:
PORTION OF THE FOLLOWING: GERMANTOWN RD, ANNAPOLIS
RD, SHALLOW FORD ST
CROMWELL DR SHOULD BE LISTED AS SAWYER RD, EXISTING
STREET IN STARWOOD @ OVERHILLS
All streets used for access to proposed subdivision must be
Planning Department (910)893-7525:
dedicated DOT streets; At very minimum Sawyer Rd. in
Conditionally Approve:
Starwood must be taken over by DOT prior to approval by
DRB. An NCDOT check list of needed repairs, an estimate to
fix such repairs, and a bond for these repairs can be
submitted.
Flood panel number must be corrected; should read
3710958400J
Township must be corrected; this section is in Anderson
Creek Twp only
Adjacent property must be corrected; should read Starwood
at Overhills
Adjacent property owners and property lines for PINs 9594-
68-0578 and 9594-57-6949 must be shown
Stub out(s) to above mentioned property owners must be
provided as required at preliminary approval by the Planning
Board
Remove sign easement note (if not applicable) or show sign
easement
Note installation of fire hydrants & street lights in accordance
with County regulations
Road signs must be purchased
Rec fees must be paid
INSPECTION: Street lights must be installed
INSPECTION: Hydrant must be installed in cul-de-sac of
Germantown Rd as approved on preliminary
INSPECTION: Excessive sedimentation and erosion must be
THE GATE @LEXINGTON DECISION PACKET
4/6/2009
1
removed and prevented
INSPECTION: Giant dirt mound must be stabilized or removed
INSPECTION: Temporary turn-arounds must be provided at
all dead-end st.
INSPECTION: Provide safety measure between dead-end st. &
temporary drainage pond
INSPECTION: Explain purposed of exposed underground
drainage pipe
The Developer must provide HCDPU with a complete Master
Public Utilities (910)893-7575:
Development Plan to include all proposed phases, lots,
Conditionally Approve:
streets, and utilities. To date, HCDPU has received a partially
completed Master development Plan.
The water and sewer lines for the Gate at Lexington Part A-1
have not been certified by the PE and the sewer collection
system is not completely constructed, more specifically the
sewer lift station must be completed and ready for service
before the final plat can be approved.
The sewer capacity issue was identified by HCDPU in the very
beginning of this project. The initial agreement between
HCDPU and the developer was to allow 200 lots to be built out
before the South Harnett Regional Wastewater Treatment
Plant (SHRWWTP) was constructed and operational. Once the
SHRWWTP was operational, then the development could
continue with no concern for limited treatment capacity. The
county began construction on the SHRWWTP in the last
quarter of 2007. It is anticipated that the plant will be
completed by the end of 2009. Until then, this development
would be restricted to a limited number of lots based upon
the availability of treatment capacity at the existing Cooper’s
Ranch and Carolina Lakes WWTP’s. The approval of the first
73 lots in the Village of Lexington Part 1 and the 163 lots with
the Gate at Lexington Part A-1 would total to 236 lots for this
development. The development of this subdivision may
continue, but the final plats for subsequent phases would not
be approved until the SHRWWTP is operational. The
preliminary determination of anticipated sewer treatment
capacity is subject to increase if the actual flow at the
existing WWTP’s do not exceed the permitted capacity of said
WWTP’s.
The developer must provide HCDPU with an access road to
the sewer lift station. The location of the sewer lift station
appears to be in the next phase of this project and the access
road for the sewer lift station must remain passable through
construction of the subsequent phases.
The developer must provide HCDPU with the cost statements
for the water and sewer improvements that will serve this
subdivision.
Harnett County Dept of Public Utilities (HCDPU) must be
provided a twenty (20’) feet wide easement for each sewer
line that is located outside the street right-of-way.
Harnett County Dept of Public Utilities (HCDPU) must be
provided a copy of the Nationwide 12 permit issued by the
Army Corps of Engineers for the new sewer lines crossing the
wetland areas.
The PE must provide HCDPU with a set of utility As Built
Record Drawings in mylar, digital and paper copies.
THE GATE @LEXINGTON DECISION PACKET
4/6/2009
2
The HCDPU Utility Construction Inspector must complete the
final inspections for the water and sewer improvements
including the sewer lift station.
Water meters cannot be released to this subdivision until
Harnett County receives the final approval from NCDENR and
the issue of the meters is subject to the treatment capacity of
the WWTP’s as indicated above. HCDPU reserves the right to
limit the release of water meters to this development and
builders that purchase lots from the developer must be given
notice of the limitations placed upon this subdivision prior to
the sale of each building lot. The sheet S-4 of the proposed
final plat should include a note stating HCDPU reserves the
right to limit the release of water meters based upon the
actual flow conditions at the existing wastewater treatment
plants serving this development.
Environmental Health (910)893-7547:
Approve:
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
Please visit www.harnett.org/utilities for more information on the approval process.
The developer must provide HCDPU a one (1) year warranty on the water and sewer lines
installed to serve this development.
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2)
business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all
items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait,
as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Friday following the meeting
the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with
Planning Staff to discuss other potential options.
THE GATE @LEXINGTON DECISION PACKET
4/6/2009
3