HomeMy WebLinkAboutLEXINGTON PLANTATION PHA PART 2 PHA
DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: LEXINGTON PLANTATION GATE PH A PART 2
PHASE A
Development Type: Major Subdivision Final Plan/Plat
Date: NOVEMBER 5, 2008
The above referenced application
shall be HELD for further revision and review.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Fire Marshal (910)893-7580: Streets are not paved, built, etc.
Hold:
Hydrants not installed.
E911/Addressing (910)814-2038: Review will be completed when updated Prelim/Overall Plan is
Conditionally Approve:
received.
Streets have not been built, paved, etc.
Planning Department (910)893-7525:
A 2nd driveway is required when 200 lots are exceeded.
Hold:
Centennial Pkwy should be completed, or bonded (complete
w/ detailed estimate) to alleviate this issue.
Per Planning Board, on 9/3/08, The Gate is required to have
foundation surveys. Please add a note that “A foundation
survey should be submitted at the completion of foundation
construction.”
Lots 110,134,137,138,223,224,225,226 encroach into
wetlands. Please show entire bldg envelope to ensure that
these are build able lots and to ensure the structure will not
encroach into the wetland.
Submit Homeowner's Assoc Documents.
Install street lights or provide letter from the contractor
stating street lights will be installed.
Please provide a Master Plan showing all recorded phases and
all future developed areas. This master plan should also
include the amount of open space based on total project
acres, as per initial PB approval.
Ensure that lots shown to be previously recorded maps match
correctly…
***Map #2008-206 is noted incorrectly…2008-205
***Map #2008-206 was not titled "The Gate Phase A, Part 2"
when it was approved & recorded
***Map #2008-206 is titled as the same as this proposed
plat.
Show where Map #2008-206 ends and Ph A, Prt 1A lots start.
HCDPU must complete the final inspection of the water and
Public Utilities (910)893-7575:
sewer system improvements before the final plat may be
Hold :
released for recording.
LEXINGTON PLANTATION PHA PART 2 PHA
4/6/2009
1
Final Plat must be on hold until the following items have been
received by HCDPU:
A. The As-Built Record Drawings in three formats
(digital, mylar and bond);
B. The P.E. certifications for the water snd sewer
system improvements and
C. The cost statement for the water and sewer
system improvements.
Provide HCDPU with an updated Master Development Plan to
show all proposed roads, streets, phases, phase lines and
proposed lots with lot numbers in each phase.
The Harnett County Fire Marshal must approve the fire
hydrant layout before the utility plans can be approved by
HCDPU.
Environmental Health (910)893-7547: None
Approve:
LONG RANGE CONDITIONS
The following conditions must be satisfied
Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
Please visit www.harnett.org/utilities for more info.
PU Dept:
The water and sewer improvements must be approved by
NCDENR and HCDPU before these systems can be placed into
operation.
The developer must provide HCDPU with a one (1) year
warranty on the water and sewer system improvements
installed to served this subdivision.
Any new development for phase 2 will require a new sewer
permit
:
:
:
:
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2)
business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all
items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait,
as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the
meeting the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with
Planning Staff to discuss other potential options.
LEXINGTON PLANTATION PHA PART 2 PHA
4/6/2009
2