Loading...
HomeMy WebLinkAboutCentennial Pkwy Bond Info ltr Consulting Engineers & Surveyors Phone: (919) 894-5731 Joe E. Godwin Sr., P.E., P.L.S. (919) 894-7765 1403 NC Hwy 50 South Fax: (919) 894-8190 Kevin Allen, P.E. Benson, NC 27504 Email: general@enochengineers.com November 11, 2008 Harnett County Planning Department 108 E. Front Street P. O. Box 65 Lillington, N. C. 27546 Re: Centennial Parkway Improvements Lexington Plantation To Whom It May Concern: Construction Costs for the water, sewer, grading and paving of Centennial Parkway, Lexington Plantation are as follows: Estimate of Cost provided by Highland Paving Co., LLC = $883,721.28 Bond Total of 125% = $1,104,651.60 Joe E. Godwin, Sr., PE Enoch Engineers, P. A. S:\projects\3059-Norwood Property Design\Documents\Commons at Lexington\centennial parkway bonding info to Harnett Cty \111108 S:\projects\3059-Norwood Property Design\Documents\Commons at Lexington\centennial parkway bonding info to Harnett Cty \111108