Loading...
HomeMy WebLinkAboutPU-SR-01 The Professional Engineer (P.E.) must provide HCDPU with the Engineer's report, the Project  Specifications and the DEH Water Application with the Utility Plans in approval process established by the county and the state. Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: New Chandler Fields - Preliminary Plat Plan Property Description PIN(s): 0539-71-6223.000 & 0539-81- Acreage: 108.0 acres 8366.000 Address/SR No.: Holden Road (SR 1253) & Hwy 27 Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): 4" on Holden Road (SR 1253) + 8" & 20" on Hwy 27 Nearest water line size: 4" & 8" & 20" Fire flow is available for this development Lines permitted under DENR Permit: (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size: Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: September 3, 2008 VOTE: Conditionally Approve CONDITIONS: SHORT TERM: Consideration should be given to loop the Chandler Way and Candlewick Lane together or let  them intersect so the water main can be looped through the development wiothout a dead end. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Utility Plans for the proposed development should be submitted to HCDPU and NCDENR for  review and permitting in accordance with the approval process established by the county and the state. Page 1 of 2PUBLIC UTILITIES STAFF REPORT