HomeMy WebLinkAboutDecision Packet 1
LONG RANGE CONDITIONS
The following conditions must be satisfied
Fire Mashal: Will review the construction documents with Public Utilities
Planning Department: Receive approval from NCDOT for proposed driveway permits, drainage system, and streets
Planning Department: Receive approval from Harnett County Public Utilities for water and/or sewer
Planning Department: Receive approval from NCDENR for erosion control plan
Planning Department: Receive approval from Environmental Health
Planning Department: Receive approval from Harnett County E-911 for Street Names
Planning Department: Note on the final plat who will be responsible for the maintenance of any drainage and
streetscape buffer easements
Planning Department: In accordance with Section 6.1.4 of the Subdivision Regulations, the above referenced plat is
subject to a recreation fee of $500 er lot, that is to be paid prior to recording
Planning Department: In accordance with Section 6.5.11 of the Subdivision Regulations, the above referenced plat is
subject to streetscape buffering requirements
Planning Department: You may proceed with the preparation of the final plat, and the installation of/or arrangement for
required improvements in accordance with approved preliminary plat and the requirement of the
Harnett County Subdivision Ordinance. In lieu of requiring the completion, installation and
dedication of any and all improvements prior to final plat approval, the Planning Department may
enter into a written agreement with the subdivider whereby the subdivider shall agree to
complete all required improvements. To secure this agreement, the subdivider shall provide, as
approved by the Harnett County Planning Department, either one or a combination of Surety
Performance Bond, Cash, and Equivalent Security (Letter of Credit).
Planning Department: It shall be the responsibility of the developer to formally notify the District Engineer from the N.C.
Department of Transportation and initiate the process of transferring the responsibility of road
maintenance. If the District Engineer or his designee has not recommended that the N.C.
Department of Transportation accept maintenance responsibility for the required public road
improvements by the time that the County has issued building permits for seventy-five percent
(75%) of the lots shown on the record plat, the County shall not issue any more building permits
until the District Engineer makes such a recommendation and formally notifies the Subdivision
Administrator.
Public Utilities: The proposed utilities must be approved by HCPU and NCDENR. All permits for this project must
be obtained from NCDENR and posted on site prior to start of construction. The PE should submit
at least three (3) copies of the Utility Plans, Engineer's Report and Project Specifications along
with a three party NCDOT Encroachment Agreement to HCDPU for review and subsequent
approval.
Page 2 of 2 Development Review Board
DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Oakmont - Phase 1
Development Type: Major Subdivision Preliminary Plan/Plat
Date: Jan. 10, 2007
Approve Approve Conditionally Approve
E-911/Addressing Environmental Health Fire Marshal
Hold Conditionally Approve
Planning Department Public Utilities
The above referenced application
shall be HELD for further revision and review.
SHORT TERM CONDITIONS
The following conditions are to be rectified prior to obtaining DRB signature on the Plat/Plan
Planning Department: Township not shown
Planning Department: Existing & proposed utilities not shown
Planning Department: Include sign easement if applicable
Planning Department: Thoroughfare notation not shown
Planning Department: Lot 1A is nonconforming
Planning Department: Total number of lots not shown
Planning Department: Curve table not shown (cannot determine all lot dimensions, distances or width)
Planning Department: Page C-3 not included (cannot determine all lot dimensions, distances or width)
Planning Department: Linear feet per street not shown
Planning Department: Cul-de-sac diameter not shown
Planning Department: Fire hydrants & street lights not depicted
Planning Department: Topography not shown
Planning Department: It should be noted that Lot 28 must be served internally
Planning Department: All information for 30' streetscape buffer is not included
Planning Department: Maintenance of drainage easement not noted
Page 1 of 2 Development Review Board