Loading...
HomeMy WebLinkAboutOVERHILLS CREEK SECTION 7 DECISION PACKET DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: OVERHILLS CREEK SECTION 7 Development Type: Major Subdivision Final Plan/Plat Date: Jun. 13, 2007 The above referenced application shall be HELD for further revision and review. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. E911/Addressing: MAPSHEET S-1 ROAD NAMES IN SEC 6, PART 2 SHOULD BE ON THE MAP TO INCLIDE:LENOIR DR, HILLANDALE RD,HAYWOOD ST. GRANVILLE ST SHOULD BE LISTED AS SWAIN ST. MAPSHEET S-2: ROCKINGHAM ST (PUBLIC) SHOULD BE LISTED TOGETHER (WEST SIDE OF MAP). YANCY CT SHOULD BE LISTED AS YANCEY CT. VICINITY MAP: NC HWY 210 S SHOLUD BE LISTED AS NC 210 . SR 1121 SHOULD ALSO SHOW RAY RD Planning Department: NOTE ON THE PLAT THE NUMBER OF LOTS WITHIN THIS PHASE Planning Department: MINIMUM LOT WIDTH ON #588- 76.26' Planning Department: C101-C105 ON CURVE TABLE AND THE LINES ON THE MAP DO NOT MATCH Planning Department: FIRE HYDRANTS & STREET LIGHT SHOULD BE NOTED Planning Department: STABILIZE ALL DITCHES AND DRAINAGE AREAS Planning Department: PROVIDE A LETTER FROM THE POWER COMPANY CERTIFYING THAT STREET LIGHTS WILL BE INSTALLED ACCORDINGLY Planning Department: STREET SIGN FEES ARE DUE Public Utilities: HCDPU must complete the final inspections and testing of the water and sewer line extensions installed to serve Overhills Creek - Section 7. Public Utilities: HCDPU must complete the draw down test of the sewer lift station that was installed to serve Overhills Creek - Section 7. Public Utilities: The access roads to the sewer lift stations in Section 6 - Part 2 and in Section 7 must be provided with means for drainage and ersosion control as these access roads do not meet HCDPU requirements. Public Utilities: The SCADA system must be installed on the sewer lift station in Overhills Creek - Section 7 before this system can be accepted by HCDPU. Public Utilities: The Professional Engineer (PE) must submit the As-Built Record Drawings, PE Certification and Cost Statement to HCDPU for the new water and sewer collection lines installed in this phase of the subdivision. Public Utilities: Final Approval must be issued by NCDENR-PWSS for the new water lines before any meters may OVERHILLS CREEK SECTION 7 DECISION PACKET 4/1/2009 1 be installed in Section 7 of Overhills Creek. Public Utilities: Final Approval must be issued by NCDENR-DWQ for the new sewer lines and the sewer lift station before any meters may be installed in Section 7 of Overhills Creek.  :     LONG RANGE CONDITIONS The following conditions must be satisfied E911/Addressing: WHEN PREPARING FINAL MAP, THE ROAD NAMES ON VICINITY MAPS SHOULD BE AS CONSISTENT AS POSSIBLE. ROAD NAMES AND SR NUMBERS OR SR NUMBERS ONLY OR ROAD NAMES ONLY. PLEASE CALL 910-893-7566 WITH ANY QUESTIONS. Public Utilities: The Developer must provide HCDPU with a one (1) year warranty on the new water lines and sewer collection lines, sewer lift station and associated appurtenances that serve this phase of the subdivision once approved by HCDPU and NCDENR.  :  :  :  :  :  :  :  :  :     OVERHILLS CREEK SECTION 7 DECISION PACKET 4/1/2009 2 Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business day. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. OVERHILLS CREEK SECTION 7 DECISION PACKET 4/1/2009 3