Loading...
HomeMy WebLinkAboutPU-SR-01 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Patton's Point Phase 2 - Final Plat Property Description PIN(s): 9597-40-8981.000 Acreage: 35.51 acres Address/SR No.: Tingen Road (SR 1139) and Micro Tower Road (SR 1141) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Fifty Caliber Drive Nearest water line size: 6" Fire flow is available for this development Lines permitted under DENR Permit: 06-01892 (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): Nearest sewer line size: Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: Feb 6, 2008 VOTE: Conditionally Approve CONDITIONS: SHORT TERM: The PE must submit the Engineer's Certification to HCDPU.  The Developer must provide a Cost Statement for the water system improvements installed to  serve the 73 lots in Phase II of patton's Point subdivision. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Developer must provide a one (1) year warranty to HCDPU for the water system  improvements installed to serve the 73 lots in Phase II of patton's Point subdivision. Page 1 of 1 PUBLIC UTILITIES STAFF REPORT