HomeMy WebLinkAboutPATTON'S POINT DECISION PACKET (2)
DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: PATTON’S POINT S/D
Development Type: Major Subdivision Preliminary Plan/Plat
Date: May 30,2007
The above referenced application
shall be HELD for further revision and review.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
E911/Addressing: ON THE SHEETS 1 AND 2, TRUE-BLUE DR SHOULD BE LISTED AS TRUE BLUE DR (NO HYPHEN).
ON MAP SHEET 2 OF 2, TIGER TANK SHOULD BE LISTED AS TIGER TANK CT.
E911/Addressing: ON THE VICINITY MAPS, NC HWY 27 SHOULD BE LISTED AS NC 27 W. NC HWY 87, NORTH OF
NC 27 W. SHOULD BE LISTED AS NC 87 . NC HWY 87, SOUTH OF NC 27 W. SHOULD BE LISTED
AS NC 87 S.
Planning Department: THOROUGHFARE PLAN NOTATION MUST BE INCLUDED
Public Utilities: The Professional Engineer (PE) should provide a Master Development Plan to HCDPU. The plans
for the first phase of Patton's Point did not include a Master Development Plan and the initial
water line upgrade to the site should have been an eight (8") inch water line or larger based
upon the number of lots that are planned to be developed in this subdivision. The preliminary
plan for Patton's Point - Phase 1 was approved with a six (6") inch water line as no additional
development was indicated to HCDPU. The Phases 2 & 3 cannot be approved by HCDPU without
a Master Development Plan for this subdivision.
Public Utilities: The Professional Engineer should provide HCDPU a complete fire flow analysis for the entire
subdiviosn using the proposed six (6") inch water line extensions from Phase 1 and another
complete fire flow analysis using another proposed design where the utility plans include an eight
(8") inch water line being extended up from Micro Tower Road through Phase 2 and connecting
into Phases 1 & 3.
Public Utilities: The Professional Engineer should redesign the utility plans to include an eight (8") inch water line
to serve the proposed Phases 2 & 3 of the Patton's Point subdiovision. Harnett County has an
existing eight (8") inch water line and a twenty (20") inch water line along Micro Tower Road. A
new tap on the twenty (20") inch water line along Micro Tower Road should be included in the
utility plans and the eight inch water main should extend up through both proposed phases of
this subdivision.
:
:
:
:
:
:
:
PATTON'S POINT DECISION PACKET
4/1/2009
1
:
:
:
LONG RANGE CONDITIONS
The following conditions must be satisfied
Public Utilities: The Professional Engineer (PE) must submit a set of utility plans for the proposed water lines, an
engineer's report and the project specifications to HCDPU for review and subsequent approval in
accordance with the established "Approval Process for New Water Lines" as outlined on the
Harnett County website www.harnett.org
:
:
:
:
:
:
:
:
:
:
Development Review Board
Chairman
PATTON'S POINT DECISION PACKET
4/1/2009
2
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business
day.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term
Conditions have been rectified.
If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning
Staff to discuss other potential options.
PATTON'S POINT DECISION PACKET
4/1/2009
3