HomeMy WebLinkAboutPU-SR-01
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Regal Crest - Final Plan/Plat
Property Description
PIN(s): 0633-32-7599.000 Acreage: 23.28 acres
Address/SR No.: River Road (SR 1418)
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): River Road (SR 1418)
Nearest water line size: 4"
Fire flow is not available for this development
Lines permitted under DENR Permit: 07-02308 (DEH Serial Number)
Sewer
Public sewer is not available for this development (via Harnett County)
Sewer capacity is not available for this development
Nearest sewer line location (Road name & SR#): US 401
Nearest sewer line size: 48"
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: April 30, 2008
VOTE: Hold
CONDITIONS:
SHORT TERM:
HCDPU must complete the final inspection and testing of the water main installed to serve this
subdivision.
The Professional Engineer (P.E.) must submit the As-Built Record Drawings (mylars, paper and
digital formats) for the water line to HCDPU.
The Professional Engineer (P.E.) must submit the P.E. Certification for the water line to HCDPU.
The Developer must provide HCDPU with a cost statement of the water system improvements
installed to serve the subdivision.
LONG RANGE:
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
Please visit www.harnett.org/utilities for more information on the approval process.
The Developer must provide HCDPU with a one (1) year warranty on the water system
improvements installed for this subdivision.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT