HomeMy WebLinkAboutRichmondPark-Phase3-Sections4&5-Public Utiliti
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Richmond Park - Phase 3 Sections 4 & 5
Property Description
PIN(s): 9595-12-1268.000 Acreage: 55.00 acres
Address/SR No.: Plantation Drive off Hwy 87
Water
Public water is available for this development (via Harnett County)
Comments: Harnett County Department of Public Utilities (HCDPU) has an existing eight (8") inch water
main along Hwy 87 and Plantation Drive to supply the new six (6") water mains installed to serve the
Sections 4 & 5 of Richmond Park - Phase 3. These water mains should be able to adequately serve this
project. The plans for the water line extensions from the existing water main have been previously
submitted to HCDPU and NCDENR-PWSS for approval. The proposed water line extensions for this
project
have been permitted by NCDENR-PWSS under Tracking Number 05-01937. The utility contractor has
completed the construction of the water mains in accordance with the approved plans.
The PE must submit the As-Built Record Drawings (paper, mylar & digital formats), the PE Certification
and the Cost Statement for the for the water line(s) installed to serve this subdivision. These documents
must be submitted to HCDPU prior to the final plat being stamped by the Development Review Board
(DRB). See the Approval Process for New Water Line Extensions as described on the Harnett County
website.
NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for
design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and
inaccurate
information provided through this preliminary and/or final plat approval process. It is therefore
recommended that the professional engineer or developer "field verify" the information provided by
HCDPU.
Sewer
Public sewer is available for this development (via Harnett County)
Comments: Harnett County Department of Public Utilities (HCDPU) has inspected the eight (8") inch
sewer
collection line(s) that will serve Sections 4 & 5 of Richmond Park - Phase 3. These sewer collection
line(s)
should be able to adequately serve this project. The plans for the sewer line extensions from the
existing
water main have been previously submitted to HCDPU and NCDENR-DWQ for approval. The sewer
collection line extensions for this project have been permitted by NCDENR-DWQ under Permit Number
WQ0021669. The utility contractor has completed the construction of the sewer mains in accordance
with
the approved plans.
The PE must submit the As-Built Record Drawings (paper, mylar & digital formats), the PE Certification
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
and the Cost Statement for the for the sewer line(s) installed to serve this subdivision. These
documents
must be submitted to HCDPU and NCDENR-DWQ prior to the final plat being stamped by the
Development
Review Board (DRB). See the Approval Process for New Water Line Extensions as described on the
Harnett
County website.
NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for
design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and
inaccurate
information provided through this preliminary and/or final plat approval process. It is therefore
recommended that the professional engineer or developer "field verify" the information provided by
HCDPU.
Ballot
REVIEWER: Tim Payseur Date: Apr. 11, 2007
VOTE: Hold
CONDITIONS:
SHORT TERM: The PE must submit the As-Built Record Drawings (paper, mylar & digital formats), the
PE Certification and the Cost Statement for the for the water and sewer line(s) installed to serve this
subdivision to HCDPU and NCDENR. See the Approval Process for New Water Line Extensions as
described on the Harnett County website.
LONGE RANGE: The Developer and Contractor must provide HCDPU with a one (1) year warranty on
the
new water mains and sewer collection lines and associated appurtenances that serve this project once
the new utility improvements have been approved by HCDPU and NCDENR.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT