HomeMy WebLinkAboutreview comments
Planning Department
www.harnett.org
PO Box 65
108 E. Front St.
October 11, 2006
Lillington, NC 27546
Ph: 910-893-7525
Fax: 910-814-6459
To
: Thompson & Associates
Re
: Comments for Solace Village preliminary subdivision.
Provide 2 (two) reduced paper copies (size 11 x 17).
It is noted and shown that the minimum lot size is 14,970 square feet. Please
note that the zoning for this property is RA-20R, which requires a minimum lot
area of 15,000 square feet. Please revise the plat to allow for this
requirement for lots 14-21.
Provide a preliminary soils report.
Correct township from Summerville to Anderson Creek.
Correct spelling of “McNeill Tobbs” Road to McNeill Hobbs Road on vicinity
map.
Note the linear feet for each street.
As required by the Harnett County subdivision ordinance in section 5.3.1G.,
fire hydrants shall be located in such a manner that no lot is further than five
hundred feet (500) from a hydrant. Please revise the plat to include fire
hydrants located in the required places.
Section 5.10 requires street lighting adequate enough to illuminate streets,
common driveways, walkways, and dead end streets for the safe movement
of vehicles and pedestrians. The minimum size streetlight shall be a 175 watt
mercury-vapor (approximately 7,000 lumens) or its equal, spaced at intervals
not more than three hundred (300) feet. Please revise the plat to show street
lighting.
Section 5.11 requires all subdivisions with more than six (6) lots that have lots
that abut state maintained road shall be required to adhere to streetscape
buffer requirements. Please revise the plat to indicate the streetscape buffer
location, width, landscaping type, and maintenance responsibilities.
Not required now, but please be aware that a recreational fee of $500 per lot
will be due at the time of recording.
Lot 31 appears much larger compared to the other lots. Future plans for this
lot may have a bearing on the type of buffer that will be required between lot
31 and the remainder of this proposed subdivision. Please contact me to
discuss the possibilities for developing lot 31, so that we can determine the
appropriate buffers at this stage.
Please let me know if you have questions or require additional information.
Sincerely,
Steve Tugwell, Senior Planner
.
Planning Department
www.harnett.org
PO Box 65
108 E. Front St.
Lillington, NC 27546
Ph: 910-893-7525
Fax: 910-814-6459
.