PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Stone Cross - Phase 2 Section 2 -
Preliminary Plan/Plat
Property Description
PIN(s): 0515-30-4536.000 Acreage: 15.00 acres
Address/SR No.: Stone Cross Drive and Cobblestone Drive (off of Overhills Road SR 1120)
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#):
Nearest water line size: 6" water line is on Stone Cross Drive and Cobblestone Drive which should be
adequate to provide water to this development.
Notes: • Road grades were not established for the Utility Contractor in Phase 2 Section 1 and the
water lines were installed. The water lines ended up under the pavement as a result of
the
road not being pproperly staked out from the beginning of the project.
• Water lines in Phase 2 Section 1 were installed without the NCDENR permit or HCDPU
approval. The NCDENR permit was eventually acquired and then certified by the P.E.
• As-Built Record Drawings for Phase 2 section 1 were never provided to HCDPU as
promised.
These record drawings must be provided to HCDPU in paper, mylar and digital formats for
Phase 2 Section 1 before the preliminary plat for Phase 2 Section 2 will be approved by
HCDPU.
• A two (2) year warranty must be provided to HCDPU for the water lines in Phase 2 Section
1
and the warranty period shall begin once the As-Built Record Drawings for Phase 2 section
1
have been submitted to HCDPU. The As-Built Record Drawings have not been
received by HCDPU as of October 22, 2007 at 5:00 pm.
• NCDENR permit for new water lines must be issued for the Phase 2 Section 2 before
construction may begin.
• Fire hydrants in Phase 2 Section 1 were not installed to finish grade and these fire
hydrants
must be re-positioned to finish grade before the preliminary plat will be approved by
HCDPU. The fire hydrants have been re-positioned to finish grade as required.
• The utility contrator did not have a pre-construction meeting with HCDPU for Phase 2
Section 1 and the utility contractor must provide HCDPU with material submittal package
at
the pre-construction meeting for Phase 2 Section 2 or the project permit will be rescinded
with NCDENR by HCDPU and the development will be issued a STOP WORK ORDER.
Fire flow is available for this development
Lines permitted under DENR Permit: 05-01695 (DEH Serial Number)
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
Sewer
Public sewer is not available for this development (via Harnett County)
Sewer capacity is not available for this development
Nearest sewer line location (Road name & SR#): Overhills Road (SR 1120) and Ray Road (SR 1121)
which is more than 1,700 feet (17 lots x 100 ft/lot) from the project site.
Nearest sewer line size: 8”
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: Oct. 24, 2007
VOTE: Hold
CONDITIONS:
SHORT TERM:
• Accurate As-Built Record Drawings for Phase 2 Section 1 of the Stone Cross subdivision
must be submitted to HCDPU in paper, mylar and digital formats.
• The developer must provide HCDPU with a two (2) year warranty on the water lines in
Phase 2 Section 1 to begin once the As-Built Record Drawings for Phase 2 Section 1
have been submitted to HCDPU.
• A Master Development Plan should be submitted to HCDPU for the entire development
of the Stone Cross subdivision.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The Developer must follow the established approval process for the proposed water lines that
will serve this subdivision.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT