PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Stone Cross - Phase 2 Section 2
Property Description
PIN(s): 0515-30-4536.000 Acreage: 15.00 acres
Address/SR No.: Stone Cross Drive and Cobblestone Drive
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Stone Cross Drive and Cobblestone Drive
Nearest water line size: 6" water line is on Stone Cross Drive and Cobblestone Drive which should be
adequate to provide water to this development.
Notes: • Road grades were not established for the Utility Contractor in Phase 2 Section 1 and the
water lines ended up under the pavement as a result of the road not being paved and
staked properly from the beginning of the project.
• Water lines in Phase 2 Section 1 were installed without the NCDENR permit or HCDPU
approval.
• As-Built Record Drawings for Phase 2 section 1 were never provided to HCDPU as
promised.
These record drawings must be provided to HCDPU in paper, mylar and digital formats for
Phase 2 Section 1 before the preliminary plat for Phase 2 Section 2 will be approved by
HCDPU.
• A five (5) year warranty must be provided to HCDPU for the water lines in Phase 2 Section
1
and the warranty period shall begin once the As-Built Record Drawings for Phase 2 section
1
have been submitted to HCDPU.
• NCDENR permit for new water lines must be issued for the Phase 2 Section 2 before
construction may begin.
• Fire hydrants in Phase 2 Section 1 were not installed to finish grade and these fire
hydrants
must be re-positioned to finish grade before the preliminary plat will be approved by
HCDPU.
• The utility contrator did not have a pre-construction meeting with HCDPU for Phase 2
Section 1 and the utility contractor must provide HCDPU with material submittal package
at
the pre-construction meeting for Phase 2 Section 2 or the project permit will be rescinded
with NCDENR by HCDPU and the development will be issued a STOP WORK ORDER.
Fire flow is available for this development
Lines permitted under DENR Permit: (DEH Serial Number)
Sewer
Public sewer is not available for this development (via Harnett County)
Sewer capacity is not available for this development
Nearest sewer line location (Road name & SR#): Overhills Road (SR 1120) and Ray Road (SR
1121)
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
Nearest sewer line size: 8"
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: Aug. 22, 2007
VOTE: Hold
CONDITIONS:
SHORT TERM:
• Water lines in Phase 2 Section 1 were installed without the NCDENR permit or HCDPU
approval.
• Road grades were not established for the Utility Contractor in Phase 2 Section 1 and
the water lines ended up under the pavement as a result of the road not being paved
and staked properly.
• Accurate As-Built Record Drawings for Phase 2 Section 1 of the Stone Cross subdivision
must be submitted to HCDPU in paper, mylar and digital formats.
• The fire hydrants in Phase 2 Section 1 must be re-positioned to finish grade.
• The developer must provide HCDPU with a five (5) year warranty on the water lines in
Phase 2 Section 1 to begin once the As-Built Record Drawings for Phase 2 Section 1
have been submitted to HCDPU.
• Utilities Plans for the proposed improvements should be provided to HCDPU for review
and approval prior to construction.
• The NCDENR permit for the proposed water lines must be issued by Division of
Environmental Health – Public Water Supply Section before construction begins.
• Utility Contractor must hold a pre-construction meeting with HCDPU before
construction begins.
LONGE RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT