DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: STONECROSS S/D
Development Type: Major Subdivision Preliminary Plan/Plat
Date: Apr. 25, 2007
The above referenced application
shall be HELD for further revision and review.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Planning Department: REQUIRED SUBDIVISION PLATS MUST BE SUBMITTED;REVIEW COULD NOT BE DONE
Planning Department: APPLICATION MUST BE COMPLETED
Fire Mashal: HYDRANT PLACEMENT, WATER LINE SIZES,ROAD NAMES,PLACEMENT OF SECURITY
GATES,INDICATES EXISTING INGRESS/EGRESS ROUTES
Public Utilities: The proposed project should be renamed to: Stone Cross - Section 2 - Phase 2 before being re-
submitted to HCDPU and the Development Review Board (DRB) for review.
Public Utilities: The PE must submit a complete set of As-Built Record Drawings (paper, mylar & digital copies) to
HCDPU for the water line improvements installed in Section 2 - Phase 1 of the Stone Cross
subdivision. Note: The five (5) year extended warranty for Section 2 - Phase 1 of the Stone Cross
subdivision will begin once these documents have been provided to HCDPU as required.
Public Utilities: The preliimary plan for the proposed Section 2 - Phase 2 of the Stone Cross subdivision should
indicate fire hydrant locations.
Public Utilities: The proposed plan for this subdivision indicates that roads will be extended across wetlands.
The NCDOT will not allow roads to be installed in the wetlands. The plan must be revised and
resubmitted with NCDOT approval before HCDPU will consider approval of the preliminary plan for
this subdivision.
Public Utilities: The proposed preliminary plan for this subdivision indicates that water line(s) may be extended
across wetlands. The USACE will allow utilities to be installed in the wetlands if the plan is in
accordance with the Nationwide 12 permit. The plan must be accompanied by the USACE
Nationwide 12 permit if the project disturbs more than one (1) acre of wetlands. The preliminary
plan for this subdivision must revised to indicate how much of the wetland area will be disturbed
by utility construction and re-submitted with the USACE Nationwide 12 permit before HCDPU will
consider approval of the preliminary plan for this subdivision.
Public Utilities: The proposed preliminary plan for this subdivision should include a vicinity map with north arrow,
the number of acres to be developed and the number of lots to be developed in Stone Cross -
Section 2 - Phase 2 before being re-submitted to HCDPU and the DRB for review.
:
:
:
STONECROSS DECISION PACKET
3/30/2009
1
:
:
LONG RANGE CONDITIONS
The following conditions must be satisfied
Public Utilities: The PE must submit a complete set of utility plans for the proposed water line extension(s) that
will serve the Section 2 - Phase 2 of the Stone Cross subdivision to HCDPU for review and
subsequent approval. The Utility Plans must then be revised (if necessary) and then submitted
to NCDENR-PWSS for review and subsequent approval which will be indicated once NCDENR-
PWSS issues the "Authorization to Construct" permit for the proposed water line(s) that will
serve this project.
Public Utilities: The PE must obtain an "Authorization to Construct" permit from NCDENR-PWSS and provide the
with said permit along with a set of approved plans marked "For Construction."
Public Utilities: The contractor must install the proposed utilities in accordance with the approved plans that have
been marked "For Construction."
Public Utilities: The PE must submit a complete set of As-Built Record Drawings (paper, mylar & digital copies)
along with the PE Certification that the water lines were constructed in accordance with the
approved plans and the developer must provided HCDPU with a cost statement for the water line
improvements installed in Section 2 - Phase 2 of the Stone Cross subdivision before any water
meters will be issued to this phase.
Public Utilities: The developer must also provide HCDPU with a one (1) year warranty on the water system
improvements if the project is installed in accordance with the approved plans. Otherwise, the
developer must provide HCDPU with a five (5) year extended warranty on the water system
improvements installed to serve this subdivision. The warranty period will begin once the final
documents have been submitted to HCDPU and NCDENR-PWSS in accordance with the
established Approval Process for New Water Line Extensions as outlined on the Harnett County
website www.harnett.org on the Public utilities page.
:
:
:
:
:
:
STONECROSS DECISION PACKET
3/30/2009
2
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business
day.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term
Conditions have been rectified.
If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning
Staff to discuss other potential options.
STONECROSS DECISION PACKET
3/30/2009
3