HomeMy WebLinkAboutDECISION 3
DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: STONECROSS SECTION 2 PHASE 2
Development Type: Major Subdivision Preliminary Plan/Plat
Date: AUG.29,2007
The above referenced application
shall be HELD for further revision and review.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Fire Marshal (910)893-7580: Hydrant placement and water line size to be shown on map
Conditionally Approve:
Street names should be shown on the actual street and not in
E911/Addressing (910)893-7566:
the lot area
Conditionally Approve:
Cobblestone Dr South is not valid, it should be Cobblestone
Dr
The small cul de sac off of Cobblestone Dr should be listed as Stone
Chase Way
Planning Department (910)893-7525:
Note deed book and page on plat.
Conditionally Approve:
Note Township on plat.
Show delineated wetlands.
Lot & block numbers should be in consecutive order.
Note linear feet per street.
Show fire hydrants & street lights
Provide a preliminary soils report
Note who will maintain the drainage easements.
A retaining wall is shown going through the private drainage
easement at the end of Stonehurst Dr. This wall should not
obstruct this easement.
Will there be an H.O.A?
Show emergency access easement as required by the
Planning Board. This alternative ingress/ egress easement
should connect to Stone Cross Dr at lot #1 and at the stub
out at lot #16.
Accurate As-Built Record Drawings for Phase 2 Section 1 of the Stone Cross
subdivision must be submitted to HCDPU in paper, mylar and digital formats.
Public Utilities (910)893-7575:
The fire hydrants in Phase 2 Section 1 must be re-positioned to finish grade.
Hold:
The developer must provide HCDPU with a five (5) year warranty on the water
lines in Phase 2 Section 1 to begin once the As-Built Record Drawings for
Phase 2 Section 1 have been submitted to HCDPU.
Utilities Plans for the proposed improvements should be provided to HCDPU for
review and approval prior to construction.
The NCDENR permit for the proposed water lines must be issued by Division of
Environmental Health – Public Water Supply Section before construction
begins.
DECISION 3
3/30/2009
1
Utility Contractor must hold a pre-construction meeting with HCDPU before
construction begins.
Environmental Health (910)893-7547:
Approve:
LONG RANGE CONDITIONS
The following conditions must be satisfied
:
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2)
business days.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all
items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait,
as all DRB members will have to review the plat/plan for compliance.
If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Friday following the meeting
the application was put on hold.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with
Planning Staff to discuss other potential options.
DECISION 3
3/30/2009
2