HomeMy WebLinkAboutSUMMERHILL PH 2 DECISION PACKET
DRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: SUMMER HILL PH 2
Development Type: Major Subdivision Preliminary Plan/Plat
Date: Jun. 13, 2007
The above referenced application
is CONDITIONALLY APPROVED as listed below.
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the
meeting.
Planning Department: NOTE OR SHOW STREET LIGHTS
Fire Mashal: DUE TO POTENTIAL FUTURE DEVELOPMETN, MOVE THE FIRE HYDRANT THAT IS CURRENTLY
BETWEEN LOTS 49 & 51 TO THE INTERSECTION BIRCH LEAF WAY AND HICKORY LEAF LANE.
Public Utilities: Eliminate the short line extension on Birch Leaf Way. This short dead end water line does not
provide water service to any of the proposed lots in Phase 2 of Summer Hill subdivision.
:
:
:
:
:
:
:
:
:
:
:
:
:
SUMMERHILL PH 2 DECISION PACKET
3/30/2009
1
LONG RANGE CONDITIONS
The following conditions must be satisfied
Public Utilities: 1. NCDENR must complete the review of the utility plans and issue the permit for the new water
line extensions.
Public Utilities: 2. The Utility Contractor must schedule a pre-construction conference with HCDPU and provide
the material submitals to the Utility Construction Inspector before the construction may begin.
Public Utilities: 3. HCDPU must complete the all inspections and testing of the water line extensions installed to
serve this subdivision.
Public Utilities: 4. The Professional Engineer (PE) must submit the As-Built Record Drawings, PE Certification and
Cost Statement to HCDPU for the new water and sewer collection lines installed in this
subdivision.
Public Utilities: 5. The Developer and Contractor must provide HCDPU with a one (1) year warranty on the new
water mains and sewer collection lines and associated appurtenances that serve this project once
the new utility improvements have been approved by HCDPU and NCDENR.
:
:
:
:
:
:
Development Review Board
Chairman
If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business
day.
If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term
Conditions have been rectified.
If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been
rectified.
If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning
Staff to discuss other potential options.
SUMMERHILL PH 2 DECISION PACKET
3/30/2009
2