Loading...
HomeMy WebLinkAboutJOHNSON FARMS DECISION PACKET LONG RANGE CONDITIONS The following conditions must be satisfied Public Utilities: The Developer and Contractor must provide HCDPU with a one (1) year warranty on the new water lines and associated appurtenances that serve this subdivision once approved by HCDPU. Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you the next business day. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If HELD, you must submit 10 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. JOHNSON FARMS DECISION PACKET 3/30/2009 2 DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: JOHNSON FARMS PHASE II Development Type: Major Subdivision Final Plan/Plat Date: Jun. 27, 2007 The above referenced application is CONDITIONALLY APPROVED as listed below. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. Fire Mashal: Place approved turn around at end of Derby Lane. E911/Addressing: ON THE VICINITY MAPS (SHEETS 1 & 2) 401 SHOULD BE LISTED AS US 401 N. 421 SHOULD BE LISTED AS US 421 S. 210 SHOULD BE LISTED AS NC 210 N. ON MAPS SHEET 1 OF 2, ROCKING HORSE LOOP SHOULD BE LISTED AS SADDLE LN. ON MAP SHEET 2 OF 2, ROCKING HORSE LOOP SHOULD BE LISTED AS SADDLE LN. ALSO, ON MAP SHEETS 1 & 2, THE SEGMENT OF SADDLE LN SHOWN ON LOTS 1-6, SHOULD ALSO BE LISTED AS SADDLE LN.THE ROAD SIGN COST IS $125.00 FOR (1) INTERSECTION. Present this report to the Planning Dept with payment prior to DRB approval signature. Planning Department: • Add applicant/owner(s) contact information (Name, Address, & Phone) • Note the number of lots within this phase. • Note total acreage for this phase. • Fire hydrant(s) & street light(s) should be noted. • Per preliminary and BOA approval, active recreation should be constructed. • Seed and straw ditch banks. • Stabilize the drainage easement located between lots 22 & 23. • Street sign fee’s are due. *Please make sure to obtain all required Local and State permits before development begins.* Public Utilities: The professional engineer (PE) must submit the As-Built Record Drawings, PE Certification and Cost Statement to HCDPU for the new water lines installed in Phase II of the Johnson Farms subdivision. Public Utilities: Water meters cannot be released to the lots in Phase II of Johnson Farms subdivision until the above documents are submitted to HCDPU, NCDENR has issued the Final Approval and the Capacity Use Fees have been satisfied with HCDPU. JOHNSON FARMS DECISION PACKET 3/30/2009 1