Loading...
HomeMy WebLinkAboutHIGHGROVE ANDERSON PHASE 1 DECISION PACKET collection lines added in Phase 1. The Professional Engineer (P.E.) must submit the P.E.  Certification for the water and sewer lines installed to serve this subdivision to HCDPU. The Developer must provide HCDPU with a cost statement of  the water and sewer system improvements installed to serve the subdivision. A twenty (20') feet wide easement must be provided to  Harnett County for all utilities not installed within the right- of-way of the subdivision streets. Amend estimate to show utilities monies to be used for  inspections Environmental Health (910)893-7547: Approve: LONG RANGE CONDITIONS The following conditions must be satisfied Must meet all requirements set forth by NC DENR. Contact at (910)433-3300. E911/Addressing (910)814-2038: Resolve questions regarding Killdeer Dr Please visit www.harnett.org/utilities for more information on  Public Utilities (910)893-7575: the approval process. Gravity sewer for Phase 1 must be completed by the  completion of Phase 3 in order to convert houses on Turnbridge Way from pump tanks to gravity sewer. The Developer must provide HCDPU with a one (1) year  warranty on the water and sewer lines installed to serve this subdivision. : : : Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for compliance. If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. HIGHGROVE ANDERSON PHASE 1 DECISION PACKET 3/30/2009 2 DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: HIGHGROVE ANDERSON CREEK PHASE 1 Development Type: Major Subdivision Final Plan/Plat Date: APRIL 30,2008 The above referenced application is CONDITIONALLY APPROVED as listed below. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. Roads need to paved to provide an all weather proof surface.  Fire Marshal (910)893-7580: The main entrance is not complete (pave as above)  Conditionally Approve: Provide temporary turn around areas for the future  Street name needed at lots 1-10, Rd Name Request Form  E911/Addressing (910)814-2038: Required. Conditionally Approve: Heathrow Dr should be shown at Lot 222.  VICINITY MAP should meet guidelines, see attached.  Name shown on map is inconsistent…..“Highgrove” or  Planning Department (910)893-7525: “Highgrove at Anderson Creek”? Conditionally Approve: Add zoning, PIN #, deed bk and pg, and township  Signage location/ easement, if applicable  Add note stating that “Ray Rd is on the NCDOT Thoroughfare  Plan” Note maintenance responsibility drainage easements  Construct streets per NCDOT standards or submit a bond.  The bond shall be payable to Harnett County and shall be in an amount equal to 1.25 times the entire cost, as estimated by the subdivider and verified by the County, of installing all required improvements . Stabilize ditches and drainage easements  Must pay for Street signs  Amend estimate to show utilities monies to be used for  inspections HCDPU must complete the final inspection and testing of the  Public Utilities (910)893-7575: water and sewer mains installed to serve this subdivision. Conditionally Approve: The Professional Engineer (P.E.) must submit the As-Built  Record Drawings (mylars, paper and digital formats) for the water and sewer improvements to HCDPU. The sewer collection permit WQ#0031668 for SC WW Phase  1A must be modified for the additional sewer collection lines added to serve Phase 1. The application has been submitted to NCDENR - Division of Water Quality, but the permit has not been issued yet. This permit must be issued for the sewer HIGHGROVE ANDERSON PHASE 1 DECISION PACKET 3/30/2009 1