HomeMy WebLinkAboutGwen Oaks - Public Utilities SR-F-01
Ballot
REVIEWER: Tim Payseur Date: May 23, 2007
VOTE: Hold
CONDITIONS:
SHORT TERM:
1. The professional engineer must submit the As-Built Record Drawings, PE Certifications and
Cost Statement to HCDPU for the new water lines installed in Gwen Oaks subdivision.
2. Meters cannot be released to this subdivision until the developer pays the capacity use fees, the
final
approval has been issued by NCDENR-PWSS and the water lines have been accepted by HCDPU.
LONGE RANGE:
1. The Developer must provide HCDPU with a one (1) year warranty on the new water lines and the
associated appurtenances that serve this subdivision once the final approvals have been issued
NCDENR-PWSS and the water lines have been accepted by HCDPU.
Page 2 of 2PUBLIC UTILITIES STAFF REPORT
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Gwen Oaks subdivision
Property Description
PIN(s): 0536-01-3179.000 Acreage: 36.72 acres
Address/SR No.: Hwy 210 S.
Water
Public water is available for this development (via Harnett County)
Comments: The new water lines installed in Gwen Oaks subdivision have been inspected and tested per
Harnett County Department of Public Utilities (HCDPU) requirements; however, HCDPU has nopt
completed the final "walk through" Inspection of the water lines and associated services. The
professional
engineer has not submitted the As-Built Record Drawings, PE Certification and Cost Statement to HCDPU
in accordance with the established Approval Process for New Water Line Extensions as outlined on the
Harnett County website www.harnett.org under the Public Utilities page.
The Developer must provide HCDPU with a cost statement for the new water lines installed to serve
these
phases of Gwen Oaks subdivision. The Developer must provide HCDPU with a one (1) year warranty on
the new water lines that serve these phases of the subdivision once approved by HCDPU and NCDENR
PWSS.
NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for
design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and
inaccurate
information provided through this preliminary and/or final plat approval process. It is therefore
recommended that the professional engineer or developer "field verify" the information provided by
HCDPU.
Sewer
Public sewer is not available for this development (via Harnett County)
Comments: Septic Tanks must be properly sized and installed on each residential building lot to handle
the wastewater disposal as HCDPU does not have county sewer available within close proximity of this
development. The septic tanks and associated drain fields for each residential lot must be approved by
The Harnett County Environmental Health Department.
NOTE: HCDPU provides this information as a curteousy to the developer, land surveyor and professional
engineer for design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions,
and inaccurate information provided through this preliminary approval process. It is therefore
recommended that the engineer or developer "field verify" the information provided by HCDPU prior to
purchasing, grading, excavating, clearing, or developing the subject property. HCDPU will not make
provisions to extend new water lines to new developments at the county's expense and HCDPU will not
provide assistance to upgrade, install or improve the new or existing water services in the proximity of
this
project unless the developer can provide HCDPU proper justification and demonstrate a benefit for
Harnett
County.
Page 1 of 2PUBLIC UTILITIES STAFF REPORT