Loading...
PU-SR-03 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Forest Trails Phase 3 – Final Property Description PIN(s): 0644-36-8190.000 Acreage: 30.248 acres Address/SR No.: Christian Light Road (SR 1412) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Kinsman Court Nearest water line size: 6” Fire flow is available for this development Lines permitted under DENR Permit: 07-00703 (DEH Serial Number) Sewer Public sewer is not available for this development (via Harnett County) Sewer capacity is not available for this development Nearest sewer line location (Road name & SR#): Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: Feb 27, 2008 VOTE: Conditionally Approve CONDITIONS: SHORT TERM: The Utility Contractor must schedule the final inspection with HCDPU on the water lines  installed to serve Forest Trails Phase 3. If a punch list is generated from the final inspection, then the punch list items must be completed to satisfy HCDPU requirements. NOTE: This conditional approval applies to Phase 3 only. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The developer must provide HCDPU a one (1) year warranty on the water lines installed to  serve this development. Page 1 of 2 PUBLIC UTILITIES STAFF REPORT NOTE: No construction may begin on the water lines in Phase 4 without the required NCDENR permits and NCDOT encroachment agreement. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT