PU-SR-03
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Forest Trails Phase 3 – Final
Property Description
PIN(s): 0644-36-8190.000 Acreage: 30.248 acres
Address/SR No.: Christian Light Road (SR 1412)
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Kinsman Court
Nearest water line size: 6”
Fire flow is available for this development
Lines permitted under DENR Permit: 07-00703 (DEH Serial Number)
Sewer
Public sewer is not available for this development (via Harnett County)
Sewer capacity is not available for this development
Nearest sewer line location (Road name & SR#):
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: Feb 27, 2008
VOTE: Conditionally Approve
CONDITIONS:
SHORT TERM:
The Utility Contractor must schedule the final inspection with HCDPU on the water lines
installed to serve Forest Trails Phase 3. If a punch list is generated from the final inspection,
then the punch list items must be completed to satisfy HCDPU requirements.
NOTE: This conditional approval applies to Phase 3 only.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The developer must provide HCDPU a one (1) year warranty on the water lines installed to
serve this development.
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
NOTE: No construction may begin on the water lines in Phase 4 without the required
NCDENR permits and NCDOT encroachment agreement.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT