HomeMy WebLinkAboutPU-SR-01
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Forest Trails Phases 3 & 4 – Final
Property Description
PIN(s): 0644-36-8190.000 Acreage: 30.248 acres
Address/SR No.: Christian Light Road (SR 1412)
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Kinsman Court
Nearest water line size: 6”
Fire flow is available for this development
Lines permitted under DENR Permit: 07-00703 (DEH Serial Number)
Sewer
Public sewer is not available for this development (via Harnett County)
Sewer capacity is not available for this development
Nearest sewer line location (Road name & SR#):
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: Jan 15, 2008
VOTE: Hold
CONDITIONS:
SHORT TERM:
The Utility Contractor must schedule the final inspection with HCDPU on the water lines in
Phase 3. The inspection must be completed with satisfactory results before the final plat for
Phase 3 may be approved.
The water lines for this development must be approved by HCDPU and NCDENR before the
water meters may be issued to the lots in Phase 3. The water lines were not installed for
Phase 4 and the final plat should not include Phase 4 until the water lines have been permitted
by NCDENR, installed, inspected and approved for Phase 4.
LONG RANGE:
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
Please visit www.harnett.org/utilities for more information on the approval process.
The developer must provide HCDPU a one (1) year warranty on the water lines installed to
serve this development.
No construction may begin on the water lines in Phase 4 without the required NCDENR permits
and NCDOT encroachment agreement.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT