Loading...
HomeMy WebLinkAboutstaff- H 4002 ,3 yaM DRAOB GNINNALP YTNUOC TTENRA HARNETT COUNTY PLANNING BOARD May 3, 2004 Staff Contact: Joseph D. Jeffries, Chief Planner Staff Contact: Joseph D. Jeffries, Chief Planner (910) 893-7525 or jjeffries@harnett.org (910) 893-7525 or jjeffries@harnett.org OWNER: RP One LLC LOCATION: NC Hwy 42 SUBDIVISION: Duncan Industrial Park NUMBER OF LOTS: 15 (One Phase) TOTAL ACRES: 30.73 acres ZONING: Industrial WATERSHED: NA FLOOD ZONE: NA TRAFFIC COUNT: Not Available WATER: Public Water System (Shall be approved by Public Utilities) SEWER: Private System located between lots 7 & 8 STREETS: Public, 1542 Linear Feet REQUEST The applicant, John Tucker, PE, is requesting approval for Duncan Industrial Park Preliminary Subdivision Plat. The proposed subdivision is a 15 lot industrial development located in the Buckhorn Township.  Existing Facilities are located on lot 3 and lot 7. Lot 7 seven contains a single wide manufactured home, this is a nonconforming use.  Adjacent uses consist of single family dwellings, kennel, horse farm, water tower, illegal auto repair business, rail road tracks, Manufactured Home Park and Duncan Junction Convenience store.  Existing Timber Company is not part of the proposed development and appears to have direct access to Hwy 42. STAFF RECOMENDATIONS  Ingress/Egress shall only occur on Progress Drive  Shall provide required buffer along perimeter of lot 3  Violation on lot 3 should be corrected (storage of junk vehicles)  Permanent Septic Disposal Field Easement shall never be used for storage or a building lot.  Recommend that development provide access for Timber Company on Progress Drive AERIAL PHOTO: SITE PHOTOS: East on Hwy 42 West on Hwy 42 Structures located on lot 3 Structure located on Adjacent lot behind lot 15