Loading...
HomeMy WebLinkAboutPU-SR-03 The final plat does not indicate the site/lot for the proposed sewer lift station that will serve  this development. This information must be added to the final plat. The final plat does not indicate the access road for the proposed sewer lift station that will  serve this development. This information must be added to the final plat. The final plat for this phase nor the final plat recorded for the previous phase does not provide  an access road to the HCDPU Carolina Lakes WWTP (wastewater) lagoons. This information must be added to the final plat. The developer must submit a performance bond to cover the cost of the water and sewer  system improvements. A Professional Engineer (P.E.) should draft an estimate of the utility costs and then the performance bond must be based upon 1.5 times the estimate total. The performance bond and supporting documents must be reviewed and approved by HCDPU and the Harnett County Staff Attorney. The sewer details for the utility plans should be revised to reflect what will be constructed and  remove the details that will not be necessary such as the above ground sewer lift station details. The sewer lift stations should be set up with submersible pumps mounted in the wet wells. The Utility Plans were approved by HCDPU with the force mains being connected to the existing force mains and the plans have been altered to show the force mains from the proposed sewer lift stations will discharge directly to the HCDPU Carolina Lakes WWTP (wastewater) lagoons. The utility plans were not approved with the arrangement and the utility plans should be revised to reflect the arrangement that was approved by HCDPU in the construction drawings marked "Released For Construction." This stipulation will apply to both phases of Block T. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Developer will be required to provide HCDPU with a one (1) year warranty on the water  and sewer lines installed to serve this subdivision once these utilities have been inspected, tested and approved by HCDPU, Final Acceptance by HCDPU and Final Approvals by NCDENR. The Developer or the Utility Contractor must provide HCDPU with the Cost Statement of the  water and sewer improvements installed to serve this subdivision. The Professional Engineer must provide HCDPU with the As-Built Record Drawings in blueprint,  mylar and digital copies along with the PE Certification once the utility construction is completed and approved by HCDPU. Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Carolina lakes Phase IX (Lakeside Manor) Block T - Village Park at Winding Lane - Final Plan/Plat Property Description PIN(s): 9585-75-2679.000 Acreage: 55.89 acres Address/SR No.: Coachman Way off of Carolina Way south of Buffalo Lake Road (SR 1115) Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Coachman Way Nearest water line size: 6" Fire flow is available for this development Lines permitted under DENR Permit: 08-00773 (DEH Serial Number) Sewer Public sewer is available for this development (via Harnett County) Sewer capacity is available for this development Nearest sewer line location (Road name & SR#): Coachman Way Nearest sewer line size: 8" Lines permitted under DENR Permit: WQ0029771 (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: 07-23-2008 VOTE: Hold CONDITIONS: SHORT TERM: The proposed water lines have been permitted with NCDENR. Since the water lines have been  permitted with NCDENR, the Developer may post a bond to cover the utility system improvements permitted for the planned development. The final plat should contain a disclosure statement to let each prospective buyer be warned  that the lots in this phase are within close proximity to a wastewater lagoon system. NOTE: The final plat for Carolina lakes Block T - Phase did not include this disclosure and it must be re-recorded with the required disclosure statement before this final plat will be approved by HCDPU to be released for recording. Page 1 of 2PUBLIC UTILITIES STAFF REPORT