The final plat does not indicate the site/lot for the proposed sewer lift station that will serve
this development. This information must be added to the final plat.
The final plat does not indicate the access road for the proposed sewer lift station that will
serve this development. This information must be added to the final plat.
The final plat for this phase nor the final plat recorded for the previous phase does not provide
an access road to the HCDPU Carolina Lakes WWTP (wastewater) lagoons. This information
must be added to the final plat.
The developer must submit a performance bond to cover the cost of the water and sewer
system improvements. A Professional Engineer (P.E.) should draft an estimate of the utility
costs and then the performance bond must be based upon 1.5 times the estimate total. The
performance bond and supporting documents must be reviewed and approved by HCDPU and
the Harnett County Staff Attorney.
The sewer details for the utility plans should be revised to reflect what will be constructed and
remove the details that will not be necessary such as the above ground sewer lift station
details. The sewer lift stations should be set up with submersible pumps mounted in the wet
wells. The Utility Plans were approved by HCDPU with the force mains being connected to the
existing force mains and the plans have been altered to show the force mains from the
proposed sewer lift stations will discharge directly to the HCDPU Carolina Lakes WWTP
(wastewater) lagoons. The utility plans were not approved with the arrangement and the
utility plans should be revised to reflect the arrangement that was approved by HCDPU in the
construction drawings marked "Released For Construction." This stipulation will apply to both
phases of Block T.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The Developer will be required to provide HCDPU with a one (1) year warranty on the water
and sewer lines installed to serve this subdivision once these utilities have been inspected,
tested and approved by HCDPU, Final Acceptance by HCDPU and Final Approvals by NCDENR.
The Developer or the Utility Contractor must provide HCDPU with the Cost Statement of the
water and sewer improvements installed to serve this subdivision.
The Professional Engineer must provide HCDPU with the As-Built Record Drawings in blueprint,
mylar and digital copies along with the PE Certification once the utility construction is
completed and approved by HCDPU.
Page 2 of 2PUBLIC UTILITIES STAFF REPORT
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Carolina lakes Phase IX (Lakeside Manor)
Block T - Village Park at Winding Lane - Final Plan/Plat
Property Description
PIN(s): 9585-75-2679.000 Acreage: 55.89 acres
Address/SR No.: Coachman Way off of Carolina Way south of Buffalo Lake Road (SR 1115)
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Coachman Way
Nearest water line size: 6"
Fire flow is available for this development
Lines permitted under DENR Permit: 08-00773 (DEH Serial Number)
Sewer
Public sewer is available for this development (via Harnett County)
Sewer capacity is available for this development
Nearest sewer line location (Road name & SR#): Coachman Way
Nearest sewer line size: 8"
Lines permitted under DENR Permit: WQ0029771 (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: 07-23-2008
VOTE: Hold
CONDITIONS:
SHORT TERM:
The proposed water lines have been permitted with NCDENR. Since the water lines have been
permitted with NCDENR, the Developer may post a bond to cover the utility system
improvements permitted for the planned development.
The final plat should contain a disclosure statement to let each prospective buyer be warned
that the lots in this phase are within close proximity to a wastewater lagoon system.
NOTE: The final plat for Carolina lakes Block T - Phase did not include this disclosure and
it must be re-recorded with the required disclosure statement before this final plat will be
approved by HCDPU to be released for recording.