Loading...
HomeMy WebLinkAboutDECISION PACKET 3 utility costs and then the performance bond must be based upon 1.5 times the estimate total. The performance bond and supporting documents must be reviewed and approved by HCDPU and the Harnett County Staff Attorney. The sewer details for the utility plans should be revised to  reflect what will be constructed and remove the details that will not be necessary such as the above ground sewer lift station details. The sewer lift stations should be set up with submersible pumps mounted in the wet wells. The Utility Plans were approved by HCDPU with the force mains being connected to the existing force mains and the plans have been altered to show the force mains from the proposed sewer lift stations will discharge directly to the HCDPU Carolina Lakes WWTP (wastewater) lagoons. The utility plans were not approved with the arrangement and the utility plans should be revised to reflect the arrangement that was approved by HCDPU in the construction drawings marked "Released For Construction." This stipulation will apply to both phases of Block T. Environmental Health (910)893-7547: Approve: LONG RANGE CONDITIONS The following conditions must be satisfied Must meet all requirements set forth by NC DENR. Contact at (910)433-3300. Please visit www.harnett.org/utilities for more information on  Public Utilities (910)893-7575: the approval process. The Developer will be required to provide HCDPU with a one  (1) year warranty on the water and sewer lines installed to serve this subdivision once these utilities have been inspected, tested and approved by HCDPU, Final Acceptance by HCDPU and Final Approvals by NCDENR. The Developer or the Utility Contractor must provide HCDPU  with the Cost Statement of the water and sewer improvements installed to serve this subdivision. The Professional Engineer must provide HCDPU with the As-  Built Record Drawings in blueprint, mylar and digital copies along with the PE Certification once the utility construction is completed and approved by HCDPU. Development Review Board Chairman If APPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days. If APPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for compliance. If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold. If DENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options. DECISION PACKET 3 3/25/2009 2 DRB DECISION PACKET Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: CAROLINA LAKES BLOCK T PHASE IX (LAKESIDE MANOR) Development Type: Major Subdivision Final Plan/Plat Date: JULY 23, 2008 The above referenced application shall be HELD for further revision and review. SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting. Fire Marshal (910)893-7580: Make sure the bond includes fire hydrnat cost and installation.  Approve: Final inspection to be conducted once bond is requested to be  lifted E911/Addressing (910)814-2038: PAY ROAD SIGN FEES $500.00 Conditionally Approve: Installation of improvements must be completed or bond and  Planning Department (910)893-7525: estimate must be submitted Hold: Must provide verification of road sign purchase  Add note stating that lots are within close proximity of a  waste water lagoon. The proposed water lines have been permitted with NCDENR.  Public Utilities (910)893-7575: Since the water lines have been permitted with NCDENR, the Hold: Developer may post a bond to cover the utility system improvements permitted for the planned development. The final plat should contain a disclosure statement to let  each prospective buyer be warned that the lots in this phase are within close proximity to a wastewater lagoon system. NOTE: The final plat for Carolina lakes Block T - Phase did not include this disclosure and it must be re-recorded with the required disclosure statement before this final plat will be approved by HCDPU to be released for recording. The final plat does not indicate the site/lot for the proposed  sewer lift station that will serve this development. This information must be added to the final plat. The final plat does not indicate the access road for the  proposed sewer lift station that will serve this development. This information must be added to the final plat. The final plat for this phase nor the final plat recorded for the  previous phase does not provide an access road to the HCDPU Carolina Lakes WWTP (wastewater) lagoons. This information must be added to the final plat. The developer must submit a performance bond to cover the  cost of the water and sewer system improvements. A Professional Engineer (P.E.) should draft an estimate of the DECISION PACKET 3 3/25/2009 1