HomeMy WebLinkAboutUtilities-SR-01
provide assistance to upgrade, install or improve the new or existing water services in the proximity of
this
project unless the developer can provide HCDPU proper justification and demonstrate a benefit for
Harnett
County.
Ballot
REVIEWER: Tim Payseur Date: Jul. 25, 2007
VOTE: Conditionally Approve
CONDITIONS:
SHORT TERM:
1. The P.E. must submit the utility plans, project specifications, an engineer's report and NCDENR
applications for the proposed water and sewer line extensions to HCDPU for review and subsequent
approval in accordance with the established Approval Process for New Water and Sewer Line
Extensions as described on the Harnett County website www.harnett.org under the Public
Utilities page.
2. The P.E. must submit the utility plans, project specifications, an engineer's report and NCDENR
applications for the proposed water and sewer line extensions to NCDENR for review and
subsequent
approval in accordance with the established Approval Process for New Water and Sewer Line
Extensions as described on the Harnett County website www.harnett.org under the Public
Utilities page. The NCDENR permits should be issued for the proposed water and sewer line
extensions before any construction may begin which also means that the NCDENR permits for the
water and sewer line extensions must be issued by the state before any local building permits may
be issued by Harnett County.
3. The P.E. should move the water line to the right side of the proposed road in the development in
order to keep the fire hydrant legs out from under the pavement.
4. The P.E. must submit six (6) orignal NCDOT three-party encroachment agreements along with the
approved plans to the NCDOT Division Engineer for review and subsequent approval before any
construction work may begin inside the NCDOT right-of-way along Hwy 87.
LONGE RANGE:
1. The Developer must provide HCDPU with a one (1) year warranty on the new water lines
that will serve this subdivision once the final approvals have been issued NCDENR and the new
utilities
have been accepted by HCDPU.
Page 2 of 2PUBLIC UTILITIES STAFF REPORT
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Torah Subdivision - Preliminary
Property Description
PIN(s): 0577-71-3153.000 Acreage: 6.10 acres
Address/SR No.: Bunn Level - Erwin Road (SR 1779)
Water
Public water is available for this development (via Harnett County)
Comments:
Harnett County Department of Public Utilities (HCDPU) has an existing eight (8") inch water line located
on the south side of Bunn Level - Erwin Road (SR 1779) that should be sufficient to provide potable
water
for domestic use and fire flow. However, the developer must extend a six (6") inch water line off of the
existing eight (8") inch water line to serve this proposed development. This will require that a
Professional
Engineer (P.E.) design the proposed water line extension and the P.E. must submit utility plans to
HCDPU
for review and subsequent approval of the proposed six (6") inch water line extension in accordance with
the established Approval Process for New Water Line Extensions as described on the Harnett County
website www.harnett.org under the Public utilities page.
NOTE: HCDPU provides this information as a curteousy to the developer and professional engineer for
design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions, and
inaccurate
information provided through this preliminary and/or final plat approval process. It is therefore
recommended that the professional engineer or developer "field verify" the information provided by
HCDPU.
Sewer
Public sewer is not available for this development (via Harnett County)
Comments: Harnett County Department of Public Utilities (HCDPU) has an existing sanitary sewer
force main located on the south side of Bunn Level - Erwin Road (SR 1779) that should be sufficient to
provide sewer for this location. Since the nearest sewer line is a force main, the developer must install a
sewer lift station in accordance with the established Harnett County miminum standards and NCDENR
DWQ requirements. The developer must hire a Professional Engineer (P.E.) to design the proposed
sewer gravity line and force main including the check valve and tap on the existing sewer force main.
The P.E. must submit utility plans to HCDPU for review and subsequent approval of the proposed sewer
line extension in accordance with the established Approval Process for New Sewer Line Extensions as
described on the Harnett County website www.harnett.org under the Public utilities page.
NOTE: HCDPU provides this information as a curteousy to the developer, land surveyor and professional
engineer for design purposes. However, HCDPU cannot be held liable for errors, mistakes, ommissions,
and inaccurate information provided through this preliminary approval process. It is therefore
recommended that the engineer or developer "field verify" the information provided by HCDPU prior to
purchasing, grading, excavating, clearing, or developing the subject property. HCDPU will not make
provisions to extend new water lines to new developments at the county's expense and HCDPU will not
Page 1 of 2PUBLIC UTILITIES STAFF REPORT