Loading...
HomeMy WebLinkAboutPU-SR-01 PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Western Harnett Industrial Park - Lot # 2 Preliminary Plan/Plat Property Description PIN(s): 9577-38-7183.000 Acreage: 3.10 acres Address/SR No.: Olive Farm Drive Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Olive Farm Drive Nearest water line size: 12" Fire flow is available for this development Lines permitted under DENR Permit: (DEH Serial Number) Sewer Public sewer is available for this development (via Harnett County) Sewer capacity is available for this development Nearest sewer line location (Road name & SR#): Olive Farm Drive Nearest sewer line size: 12" Lines permitted under DENR Permit: (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: 09-24-2008 VOTE: Conditionally Approve CONDITIONS: SHORT TERM: The site plan should specify who will install the water and sanitary sewer utility taps Harnett  County Department of Public Utilities (HCDPU) or Utility Contractor. If the water and sanitary sewer taps wil be installed by HCDPU then the HCDPU Required Utility  Notes may be removed from the site plan. The site plan should instruct the Utility Contractor or the General Contractor to pay HCDPU for the tap fees, capacity fees and meter fees in order to have HCDPU to install the taps for water and sewer. If the Utility Contractor will install the water and sanitary sewer taps then the utility details  should be modified to include the water and sanitary sewer taps and associated mainand Page 1 of 2 PUBLIC UTILITIES STAFF REPORT service lines. The details should include water and sanitary sewer main line construction. The detail for the sanitary sewer cleanout should indicate the sweeping wye at the sanitary sewer cleanout should be set at approximately three (3') feet below finish grade and the water line detail should indicate the water line will have three (3') feet of cover. The HCDPU Required Utility Notes must remain on the site plan to instruct the Utility  Contractor to set up the pre-construction conference and provide HCDPU with the shop drawings and/or material submittal package. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  If the Utility Contractor will install the water and sanitary sewer taps, mains and associated  service lines then the professional Engineer (P.E.) must provide HCDPU with a set of As-Built Record Drawings (in mylar, bond, and digital formats), the P.E. certification that the taps and service lines were installed in accordance with approved plans marked as "Released for Construction" by HCDPU. The Utility Contractor must provide HCDPU with a Cost Statement for the utility taps, mains  and associated service lines. The Utility Contractor must provide HCDPU with a one (1) year warranty on the water and  sanitary sewer taps, mains and associated services lines up to the water meters and sanitary sewer cleanouts to cover any and all repairs due to poor workmanship, defective materials or anything that does not meet HCDPU Standards and Speicifcations at the time the work was performed to install the water and sanitary sewer taps, mains and associated service lines. Page 2 of 2 PUBLIC UTILITIES STAFF REPORT