PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Western Harnett Industrial Park - Lot # 2
Preliminary Plan/Plat
Property Description
PIN(s): 9577-38-7183.000 Acreage: 3.10 acres
Address/SR No.: Olive Farm Drive
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Olive Farm Drive
Nearest water line size: 12"
Fire flow is available for this development
Lines permitted under DENR Permit: (DEH Serial Number)
Sewer
Public sewer is available for this development (via Harnett County)
Sewer capacity is available for this development
Nearest sewer line location (Road name & SR#): Olive Farm Drive
Nearest sewer line size: 12"
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: 09-24-2008
VOTE: Conditionally Approve
CONDITIONS:
SHORT TERM:
The site plan should specify who will install the water and sanitary sewer utility taps Harnett
County Department of Public Utilities (HCDPU) or Utility Contractor.
If the water and sanitary sewer taps wil be installed by HCDPU then the HCDPU Required Utility
Notes may be removed from the site plan. The site plan should instruct the Utility Contractor
or the General Contractor to pay HCDPU for the tap fees, capacity fees and meter fees in order
to have HCDPU to install the taps for water and sewer.
If the Utility Contractor will install the water and sanitary sewer taps then the utility details
should be modified to include the water and sanitary sewer taps and associated mainand
Page 1 of 2 PUBLIC UTILITIES STAFF REPORT
service lines. The details should include water and sanitary sewer main line construction. The
detail for the sanitary sewer cleanout should indicate the sweeping wye at the sanitary sewer
cleanout should be set at approximately three (3') feet below finish grade and the water line
detail should indicate the water line will have three (3') feet of cover.
The HCDPU Required Utility Notes must remain on the site plan to instruct the Utility
Contractor to set up the pre-construction conference and provide HCDPU with the shop
drawings and/or material submittal package.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
If the Utility Contractor will install the water and sanitary sewer taps, mains and associated
service lines then the professional Engineer (P.E.) must provide HCDPU with a set of As-Built
Record Drawings (in mylar, bond, and digital formats), the P.E. certification that the taps and
service lines were installed in accordance with approved plans marked as "Released for
Construction" by HCDPU.
The Utility Contractor must provide HCDPU with a Cost Statement for the utility taps, mains
and associated service lines.
The Utility Contractor must provide HCDPU with a one (1) year warranty on the water and
sanitary sewer taps, mains and associated services lines up to the water meters and sanitary
sewer cleanouts to cover any and all repairs due to poor workmanship, defective materials or
anything that does not meet HCDPU Standards and Speicifcations at the time the work was
performed to install the water and sanitary sewer taps, mains and associated service lines.
Page 2 of 2 PUBLIC UTILITIES STAFF REPORT