Development Name: WOODS OF LAFAYETTE
Development Type: Major Subdivision Preliminary Plan/Plat
Date: March 17, 2008
Fire Hydrant to be moved from Lot # 88 to Lot # 78
Fire Marshal (910)893-7580:
Fire Hydrant to be moved from Lot # 109 to Lot # 127
:
Rd names should be shown on the road itself and not in the
E911/Addressing (910)814-2038:
lot area on all sheets.
:
U.S. 401 N should be shown as US 401 N
Sheet C9: Bordeaux Way should be shown
Chalybeate Rd should also indicate SR1429 on C3,C4,C5
VICINITY MAP:
Baptist Rd should be Baptist Grove Rd
SR numbers should be shown instead of road names
Example: Christian Light Rd should be removed and SR1412
should be put in its place.
Note that this project is within a Water Supply Watershed
Planning Department (910)893-7525:
IV Protected Area and 24% maximum impervious
:
coverage.
FYI…….since 15,000 sq ft lots are min, a 30’ front setback
is allowed.
Note who will maintain open space. HOA?
Show a typical of the sidewalks, street trees and curb &
gutter.
75’ Prime View and Open Vista setback is required along
Lafayette Rd.
Street trees will be required on Brandywine and Bordeaux
if it is longer than a mile.
Add FIRM effective date = October 3, 2006
Note that “A foundation survey should be submitted at the
completion of foundation construction.”
Public Utilities (910)893-7575: Public Utilities can serve the project with county water right now as we
:
have a 6” water line on Lafayette Road and a 12” water line on US 401
N. The county will be extending an 18” sewer outfall line from the
Lafayette Elementary school down along the creek to the FV-Lillington
Wastewater Interceptor in the next few months. This new sewer outfall
line will be sized large enough to serve the Woods of Lafayette, the
next phase of Victoria Hills and the Lafayette Elementary school once it
is in place. It may be able to serve more property on the west side of
US 401 N at a later time. Right now, we are working with the
Developer’s engineer to provide the plans for that sewer outfall line so
they can connect to it. If you need me to complete a staff report for
the revised drawing then let me know. But, Public Utilities can approve
the preliminary plan/plat with the understanding that this subdivision
will be connected to county water and sewer.