Loading...
HomeMy WebLinkAboutPU-SR-01 The cost estimate certified by Robert J. Bracken, P.E. does not include cost for a parschal flume  and flow meter at the existing lagoon where the proposed force main will discharge. The performance bond must include the cost to install the parschal flume and flow meter. The cost estimate certified by Robert J. Bracken, P.E. does not include cost for Water Capacity  Use Fees, Sewer Capacity Use Fees, Meter Fees, or SCADA Fees that will be required by HCDPU for this proposed subdivision. The performance bond must include the cost to of all applicable fees imposed by HCDPU for this subdivision. Revise the overall Cost Estimate for the improvements to include all utilities and applicable  fees as required by HCDPU. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.   Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Carolina Lakes Block T – Final Plan/Plat Property Description PIN(s): 9585-75-2679.000 Acreage: 50.54 acres Address/SR No.: Coachman Trail Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Coachman Trail Nearest water line size: 6” Water Line Fire flow is available for this development Lines permitted under DENR Permit: 06-01645 (DEH Serial Number) Sewer Public sewer is available for this development (via Harnett County) Sewer capacity is available for this development Nearest sewer line location (Road name & SR#): Coachman Trail Nearest sewer line size: 8” Lines permitted under DENR Permit: WQ0029771 (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: Oct. 24, 2007 VOTE: Hold CONDITIONS: SHORT TERM: The Developer must provide HCDPU with a Master Development Plan for any and all additional  phases to be developed in this subdivision in accordance with the approval process of HCDPU. The proposed water lines have been permitted with NCDENR and the permit #06-01645 will expire if construction does not begin before 10-13-2007. The cost estimate certified by Robert J. Bracken, P.E. does not include cost for water line  extensions to serve the subject project. The performance bond must include the cost to install the proposed water lines. Page 1 of 2PUBLIC UTILITIES STAFF REPORT