HomeMy WebLinkAboutPU-SR-01
The cost estimate certified by Robert J. Bracken, P.E. does not include cost for a parschal flume
and flow meter at the existing lagoon where the proposed force main will discharge. The
performance bond must include the cost to install the parschal flume and flow meter.
The cost estimate certified by Robert J. Bracken, P.E. does not include cost for Water Capacity
Use Fees, Sewer Capacity Use Fees, Meter Fees, or SCADA Fees that will be required by HCDPU
for this proposed subdivision. The performance bond must include the cost to of all applicable
fees imposed by HCDPU for this subdivision.
Revise the overall Cost Estimate for the improvements to include all utilities and applicable
fees as required by HCDPU.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
Page 2 of 2PUBLIC UTILITIES STAFF REPORT
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Carolina Lakes Block T – Final Plan/Plat
Property Description
PIN(s): 9585-75-2679.000 Acreage: 50.54 acres
Address/SR No.: Coachman Trail
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Coachman Trail
Nearest water line size: 6” Water Line
Fire flow is available for this development
Lines permitted under DENR Permit: 06-01645 (DEH Serial Number)
Sewer
Public sewer is available for this development (via Harnett County)
Sewer capacity is available for this development
Nearest sewer line location (Road name & SR#): Coachman Trail
Nearest sewer line size: 8”
Lines permitted under DENR Permit: WQ0029771 (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: Oct. 24, 2007
VOTE: Hold
CONDITIONS:
SHORT TERM:
The Developer must provide HCDPU with a Master Development Plan for any and all additional
phases to be developed in this subdivision in accordance with the approval process of HCDPU.
The proposed water lines have been permitted with NCDENR and the permit #06-01645 will
expire if construction does not begin before 10-13-2007.
The cost estimate certified by Robert J. Bracken, P.E. does not include cost for water line
extensions to serve the subject project. The performance bond must include the cost to install
the proposed water lines.
Page 1 of 2PUBLIC UTILITIES STAFF REPORT