Loading...
HomeMy WebLinkAboutPU-SR-02 The sewer permit WQ0029771 was issued to HCDPU for this development with the  understanding that all HCDPU requirements would be satisfied and this permit may be rescinded with NCDENR-DWQ if the established HCDPU Standards and Specifications are not followed for the design, installation, testing, inspection and approval of the proposed sewer collections lines. The cost estimate certified by Robert J. Bracken, P.E. for the performance bond does not  include cost for water line extensions to serve the subject project. The performance bond must include the cost to install the proposed water lines. The cost estimate certified by Robert J. Bracken, P.E. for the performance bond does not  include cost for a parschal flume and flow meter at the existing lagoon where the proposed force main will discharge. The performance bond must include the cost to install the parschal flume and flow meter. The cost estimate certified by Robert J. Bracken, P.E. for the performance bond does not  include cost for Water Capacity Use Fees, Sewer Capacity Use Fees, Meter Fees, or SCADA Fees that will be required by HCDPU for this proposed subdivision. The performance bond must include the cost to of all applicable fees imposed by HCDPU for this subdivision. Revise the overall Cost Estimate for the improvements to include all utilities and applicable fees  as required and resubmit the cost estimate for the performance bond to HCDPU. Robert J. Bracken, P.E. must submit design calculations for the parschal flume and flow meter  and revise the utility plans to reflect the connection to the existing metering station at the Carolina lakes WWTP. Robert J. Bracken, P.E. must submit all maps, As-Built Record Drawings and PE Certifications  for all previous phases of the Carolina Lakes Development to HCDPU before the final plat will be approved and the project will be placed on Hold until these documents have been provided to HCDPU as required. LONG RANGE: Please visit www.harnett.org/utilities for more information on the approval process.  The Developer will be required to provide HCDPU with a one (1) year warranty on the water  and sewer lines installed to serve this subdivision once these utilities have been inspected, tested and approved by HCDPU, Final Acceptance by HCDPU and Final Approvals by NCDENR. The Developer or the Utility Contractor must provide HCDPU with the Cost Statement of the  water and sewer improvements installed to serve this subdivision.  Page 2 of 2PUBLIC UTILITIES STAFF REPORT PUBLIC UTILITIES STAFF REPORT Harnett County, North Carolina Planning Department 108 E. Front Street, Lillington, NC 27546 Phone: (910) 893-7525 Fax: (910) 893-2793 Development Name: Carolina Lakes Block T – Final Plat Property Description PIN(s): 9585-75-2679.000 Acreage: 50.54 acres Address/SR No.: Coachman Trail Water Public water is available for this development (via Harnett County) Water capacity is available for this development Nearest water line location (Road name & SR#): Coachman Trail Nearest water line size: 6” Water Line Fire flow is available for this development Lines permitted under DENR Permit: 06-01645 (DEH Serial Number) Sewer Public sewer is available for this development (via Harnett County) Sewer capacity is available for this development Nearest sewer line location (Road name & SR#): Coachman Trail Nearest sewer line size: 8” Lines permitted under DENR Permit: WQ0029771 (DWQ Serial Number) Additional Requirements As-Built Record Drawings Yes No N/A Cost Statement for water improvements Yes No N/A Cost Statement for sewer improvements Yes No N/A Professional Engineer’s Certifications for water/sewer extension Yes No N/A Final Plat & As-Built Record Drawings are identical Yes No N/A DOT Encroachment Agreement Yes No N/A Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A Master Plan submitted for additional phases if intended Yes No N/A Ballot REVIEWER: Tim Payseur Date: Nov. 28, 2007 VOTE: Hold CONDITIONS: SHORT TERM: The Developer must provide HCDPU with a Master Development Plan for any and all additional  phases to be developed in this subdivision in accordance with the approval process of HCDPU. The proposed water lines have been permitted by NCDENR-DEH,PWSS for HCDPU under the  DEH permit #06-01645 and it will expire if construction does not begin before 10-13-2008. The DEH water permit # 06-01645 was issued to HCDPU for this development with the  understanding that all HCDPU requirements would be satisfied and this permit may be rescinded with NCDENR-DEH,PWSS if the established HCDPU Standards and Specifications are not followed for the design, installation, testing, inspection and approval of the proposed water distribution lines. Page 1 of 2PUBLIC UTILITIES STAFF REPORT