Loading...
HomeMy WebLinkAboutCarolina Lakes Block T- Phase 1 & 2 Subdivision From:Timothy Payseur Sent:Wednesday, September 17, 2008 7:05 PM To:Jay Sikes; Landon Chandler Cc:'Michael Blackmon'; 'Bob Bracken'; 'Robbie Brafford'; Sistrunk George W.; braynor@highlandpaving.com; Bobby Johnson; 'Bruce Blackmon'; Randy Rogers Subject:RE: Carolina Lakes Block T - Phases 1 & 2 Jay & Landon, After looking at the final plat for Carolina Lakes Block T - Phase 1 a little closer I found the disclaimer note about the lots being close to Harnett County’s wastewater lagoon. It was on several sheets of the final plat, but for some reason I missed it. There are dedication paragraphs on the final plat where the owner dedicates the easements for the water and sewer lines but, I did not see the sewer easements for the sewer lines that will be installed along the edge of the lake inside some of the lots. The final plat should be re-recorded to reflect all the sewer easements and show the width of the access road to the sewer lift station site. If you receive a revised plat to be recorded on this subdivision, please send me a copy and I will ask randy Rogers, HCDPU Right-of-Way Agent to look it over to make sure the easements are where they should be on the final plat and that everything meets Harnett County requirements. Thanks for your help. Regards, Tim ============================== Tim Payseur, Senior Engineering Technician Harnett County Department of Public Utilities 308 West Duncan Street P O Box 1119 Lillington, NC 27546-1119 Phone: (910) 893-7575, ext 3275 Fax: (910) 814-4024 E-mail: tpayseur@harnett.org www.harnett.org ============================== 1 -----Original Message----- From: Bruce Blackmon [mailto:bbblackmon@parkwestinv.com] Sent: Wednesday, July 23, 2008 6:01 PM To: Timothy Payseur Cc: 'Michael Blackmon'; 'Bob Bracken'; 'Robbie Brafford'; Sistrunk George W.; braynor@highlandpaving.com; Bobby Johnson Subject: RE: Carolina Lakes Block T - Phase 2 Hi Tim,  We found the note on the location and proximity of the HC Sewer Lagoons on the recorded plats.  Bobby Johnson has the plat for recording the 'access easement' on the end of Lot 102, and I will direct him to do that (call Robbie if you need help). George Sistrunk attorney:  The survey of the lot before conveyance with Title policies and Insurance, requires language that identifies all setbacks, utility easements of 10' on each side of the utility lines, (don't want homeowners building permanent structures over sewer lines) and other delineations prior to conveying a lot from Declarant to builder or buyer. I think this should address all of your concerns, and if so, we would like to be able to get conditional approval so that we can go ahead and bond this project. Thanks for your efforts and comments. Bruce PS: Brian, when we put in the 2nd sewer lift station in Phase 2, to feed some of the Phase 1 lots, we need to go ahead and put the laterals in for those lots, rather than coming back and redigging to install laterals. Tim has ordered a stamp that says "Approved for Construction" to be put on all plans once they are approved. He will set this up as a protocol for his department. 2