HomeMy WebLinkAboutPU-SR-01
The Developer or Utility Contractor must provide HCDPU with a Cost Statement that describes
the cost of the water lines installed to serve this subdivision.
The Final Plat may not be released for approval until the items above have been completed.
Meters cannot be released to this subdivision until HCDPU receives the Final Approval from
NCDENR-DEH,PWSS on the water lines installed to serve this subdivision.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The Developer must give HCDPU a one (1) year warranty on the water lines beginning upon the
Final Approval from NCDENR-DEH,PWSS and Final Acceptance by HCDPU.
Page 2 of 2PUBLIC UTILITIES STAFF REPORT
PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Cameron Pines – Preliminary
Property Description
PIN(s): 9587-53-7335.000 Acreage: 10.43 acres
Address/SR No.: Buffalo Lake Road
Water
Public water is available for this development (via Harnett County)
Water capacity is available for this development
Nearest water line location (Road name & SR#): Buffalo Lake Road (SR 1115)
Nearest water line size: 8”
Fire flow is available for this development
Lines permitted under DENR Permit: 07-00366 (DEH Serial Number)
Sewer
Public sewer is available for this development (via Harnett County)
Sewer capacity is not available for this development
Nearest sewer line location (Road name & SR#): Buffalo Lake Road (SR 1115)
Nearest sewer line size: 6” (force main)
Lines permitted under DENR Permit: (DWQ Serial Number)
NOTE: Sewer Not Permitted with NCDENR-DWQ as Septic Tanks are planned for this project.
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No
N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: Nov. 28, 2007
VOTE: Approve
CONDITIONS:
SHORT TERM:
The PE submitted 3 paper copies of the As- Built Record Drawings for the water lines that will
serve this subdivision and the As- Built Record Drawings should be submitted in digital format
and on mylar as well as paper copies.
The PE must submit a Certification that the water lines were installed in accordance with the
NCDENR-DEH,PWSS approved plans.
The Utility Contractor must schedule a Final Inspection with the HCDPU Utility Construction
Inspector and repair or replace any items noted in the punch list if necessary before Final
Acceptance by HCDPU.
Page 1 of 2PUBLIC UTILITIES STAFF REPORT