Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPU-SR-01PUBLIC UTILITIES STAFF REPORT
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC 27546
Phone: (910) 893-7525 Fax: (910) 893-2793
Development Name: Evergreen - Preliminary Plat Plan
Property Description
PIN(s):
9537-83-5120.000
Acreage:
64.23
acres
Address/SR No.:
Milton Welch Road (SR 1320)
Water
Public water available for this development (via )
Water capacity available for this development
Nearest water line location (Road name & SR#): Milton Welch Road (SR 1320)
Nearest water line size: 6"
Fire flow available for this development
Lines permitted under DENR Permit: (DEH Serial Number)
Sewer
Public sewer available for this development (via )
Sewer capacity available for this development
Nearest sewer line location (Road name & SR#):
Nearest sewer line size:
Lines permitted under DENR Permit: (DWQ Serial Number)
Additional Requirements
As-Built Record Drawings Yes No N/A
Cost Statement for water improvements Yes No N/A
Cost Statement for sewer improvements Yes No N/A
Professional Engineer’s Certifications for water/sewer extension Yes No N/A
Final Plat & As-Built Record Drawings are identical Yes No N/A
DOT Encroachment Agreement Yes No N/A
Distance to nearest water/sewer lines noted (Site Plan Only) Yes No N/A
Master Plan submitted for additional phases if intended Yes No N/A
Ballot
REVIEWER: Tim Payseur Date: September 3, 2008
VOTE:
CONDITIONS:
SHORT TERM:
Consideration should be given to loop the Apache Trail & Mohawk Drive together or let them intersect so the water main can be looped through the development without a dead end.
LONG RANGE:
Please visit www.harnett.org/utilities for more information on the approval process.
The Utility Plans for the proposed development should be submitted to HCDPU and NCDENR for review and permitting in accordance with the approval process.
The Professional Engineer (P.E.) must provide HCDPU with the Engineer's report, the Project Specifications and the DEH Water Application with the Utility Plans in approval process established
by the county and the state.
The Utility Plans for the proposed development should be submitted to HCDPU and NCDENR for review and permitting in accordance with the approval process.
The Professional Engineer (P.E.) must provide HCDPU with the Engineer's report, the Project Specifications and the DEH Water Application with the Utility Plans in approval process established
by the county and the state.